West Bengal State Electricity Distribution Company Limited Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

West Bengal State Electricity Distribution Company Limited - WBSEDCL Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date14 Aug 2024
Closing Date9 Sep 2024
Tender Amount₹ 15,33,640 
Notes
Download

Costs

Summary

Pm/rmm/e-tender/civil/24-25/01 (sl. No.3) Dtd.09.08.2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Repair, maintenance and minor civil works, for I.B. Complex, for the road from Lodhoma Bifurcation Point (Link Road) to Rammam Intake, Helipad to Adit and upper penstock road ,for the road from Lodhoma Bifurcation Point (Link Road) to Car Point.
Repair, maintenance and minor civil works for the road from Lodhoma Bifurcation Point (Link Road) to Car Point (Other than bituminous road) under Rammam Hydel Project, Stage II.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.(Analysed)

60

-

144.85

... More
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth. (iv) Without pumping out water and shoring (V/p-284,I-12.01 (1)(a)(iv)of PWD SOR(Rds.)

60

-

115

... More
Dressing and chilchalling Road flanks including cutting and filling with earth up to 150 mm average thickness finished with outward cross-grade of 1 in 30.(V/p-277,I-10.01,of PWD SOR(Rds).

24000

-

12.2

... More
Removal of Unserviceable Soil with Disposal upto 1000 metres Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per Technical Specification Clause 302.3.11 for Rural Roads of MORD. (Mode of measurement: pre works and post works)(V/p-238,I-3.1,of PWD SOR(Rds)

750

-

29.3

... More
Excavation in Hard Rock (blasting prohibited) Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections as per Clause 301 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (Mode of measurement: pre works and post works)(V/p-238,I-3.08,of PWD SOR(Rds)

80

-

444

... More
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering. In ground floor and foundation. (a) 1:3:6 proportion. V/P-09, 1 & P-23 of 315, 3rd Corrigenda, PWD SOR (Building)

10

-

6189.12

... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required ,(V/p-322,I-18.05(b),of PWD SOR(Rds).

100

-

214

... More
Masonry work with rough dressed Stones of size as directed with cement mortar, true to line, level and shape, including dressing and shaping boulders to size as required, curing complete including cost and carriage of all materials complete. (a) With cement-sand mortar 1 : 6 (i) In Road & Jhora Work(Analysed)

40

-

2506.75

... More
Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge. [Rate provided is exclusive of the cost of stone boulders and sausage crate](Analysed)

60

-

986

... More
Providing weep holes in Brick masonry / Plain /Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications. (V/p-304,I-13.03,of PWD SOR(Rds)

60

-

117

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.(b ) River bazree(V/p-24,I-4(b),of PWD SOR(Bldg)

25

-

6370.8

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (ii ) River Bazree(V/p-26,I-10(ii)3rd Crr PWD SOR)Bldg

7

-

7238.4

... More
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion(V/p-27,I-11(i),of PWD SOR(Bldg)

50

-

3304

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD. (I) By Manual Means(V/p-233,I-2.05,of PWD SOR(Rds)

15

-

404

... More
Land Slide Clearance in Soil Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side.(V/p-242,I-3.28,of PWD SOR(Rds)

2000

-

61.8

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:6 cement mortar ,20mm thick plaster (V/p- P 189 of 315, 3rd Corrigenda, PWD SOR (Building)

100

-

247.2

... More
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc. (V/p-192,I-15,of PWD SOR(Bldg)

100

-

40.8

... More
Scraping of moss, blisters etc. thoroughly from exterior surface of walls necessitating the use of scraper, wire brush etc. V/p-198,I-B(1),PWD S.O.R ( Bldg)

1000

-

8.4

... More
Clearing grass and removal of rubbish upto a distance of 30m outside the periphery of the area as per Technical Specifications Clause 201 for Rural Roads of MORD. By Manual Means V/p-233,I-2.03,PWD S.O.R (Rds)

10000

-

1.19

... More
Removal of Unserviceable Soil with Disposal upto 1000 metres Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per Technical Specification Clause 302.3.11 for Rural Roads of MORD. (Mode of measurement: pre works and post works) V/p-238, I-03.10 of PWD(RDs),2018

100

-

29.3

... More
Supplying/Providing and laying of Filter media with granular materials/stone crushed aggregates/brick aggregates/river bed materials satisfying the requirements laid down in clause 2504.22 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to full height compacted to a firm condition complete as per drawing and technical specification.. (Analysed Rate)

10

-

1787.28

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m. (i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL Sl-1(a)(i) 10th corrigenda. V/p-44,I-40(a),PWD S.O.R (Bldg)

0.2

-

75332.4

... More
Items covering based on Based on P.W. D, W.B ., S.O.R Bldg w.e.f 01.11.2017 (11th corrigenda 14.02.2020) & Roads w.e.f 30.08.2018 (8th corrigenda 22.07.2020) and S&P w.e.f. 01.11.2017 (7th corrigenda dtd. 22.01.2020)

1

-

10000

... More
Non schedule Item (Rate should be analysed from present market rates of different element in the item against documentary evidence with 5% overhead charge 10% contractors profit & 1% BOCWW Cess towards BOCWW Act 1996. In that case contractual rate will not be applicable

1

-

10000

... More
Add BOCW Cess @1% for the rate of above all items

1

-

15184.55



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.