Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
West Bengal State Electricity Distribution Company Limited - WBSEDCL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date11 Feb 2025
Closing Date18 Feb 2025
Tender Amount₹ 6,45,764
Costs
EMD
₹ 12,915Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction Of Boundary Wall And Renovation Of Switchyard At Seoraphully 33/11 Kv Sub-station.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WBSED_810900_1Bid Award Id
ViewTender No
RM/HG/CIVIL/TENDER/2024-25/36Tender Authority
West Bengal State Electricity Distribution Company Limited ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation.
21
78
1644.72
... More
Filling in foundation or plinth by medium course sand in layers not exceeding 150 mm. as directed and consolidating same by thorough saturation with water ramming complete, including the cost of supply of sand. (Payment to be made on measurement of finished quantity).
15
961
14420.25
... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
40
360
14422.8
... More
Cement concrete with graded stone ballast (40 mm size excluding shuttering). In ground floor and foundation.(A) Pakur Variety. (a) 1:3:6 proportion
5
4961
24805.6
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm.nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes.a) Pakur Variety i) In ground floor and foundation.
20
5819
116388.2
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm.nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes.a) Pakur Variety i) In ground floor and foundation.
4
5257
21031.96
... More
Hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).
-
-
-
... More
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of engineer-in-charge . i) In ground floor.
1
337
337.34
... More
(b) 25mm. to 30mm. shuttering without staging in foundation etc.
150
211
31663.5
... More
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work
30
371
11150.4
... More
(d) Hard wood shuttering for precast R.C. Slab curved, or stright and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc, complete in all respect.
64.04
94
6080.24
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild steel - SAIL/ TATA/RINL (Payment to be made on required quantity of reinforcement as per drawing and direction).
0.75
61037
45778
... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
25
729
18230.5
... More
Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth
5
5344
26724.6
... More
(b) In superstructure, ground floor
3
5569
16707.42
... More
Labour for Chipping of concrete surface before taking up Plastering work.
50
21
1060.5
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] i)With 1:6 cement mortar
a) 15 mm thick plaster
100
145
14544
... More
b) 20 mm thick plaster
15
167
2514.9
... More
M.S. works in brackets made from flats, angles, tees etc. to sizes specialy bent, twisted, forged; making holes drilled and fitted to after of trusses with necessary bolts, nuts, washer or screws etc.(length of straight not less than 230 mm)
16
9603
153658.56
... More
Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.
25
19
479.75
... More
Removing loose scales, blisters etc. from old painted surface and thoroughly smoothening the surface to make the same suitable for receiving fresh coat of paint.
25
21
530.25
... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal /Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
7
167
1173.62
... More
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
i) In ground floor
3
451
1354.41
... More
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.(a) upto 150 mm. thick
i) In ground floor
3
948
2845.17
... More
Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof.
1
1975
1975.56
... More
Applying Exterior grade Acrylic Primer of approved quality and brand on plastered or concretesurface old or new surface to receive decorative textured (mat finish) or smooth finish acrylic exterior Immersion paint including scrapping and preparing the surface thoroughly, complete as per manufacturer's specification and as per direction of E.I.C. One coat on new surface. (a) In ground floor.
100
31
3171
... More
Protective and decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of EIC to be applied over acrylic primer as required.The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.
Super Protective 100% Acrylic Emulsion..i) In ground floor.
100
97
9797
... More
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. On Steel
50
29
1464.5
... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary. On steel or other metal surface :With other than hi-gloss of approved quality -Two coats (with any shade except white)
50
72
3636
... More
Supplying & laying in the specific pattern of interlocking concrte block pavements (ICBP) with concrete blocks (woth Concrte grade as specifed as per Table 1 if IS 15658:2006) manufatured from the BIS licensee manufacturer, with spacer nib(Small protruding profiles on the vertical face of a paver block used as device for keeping minimum joint gap in beween the paving blocks, as per Cl. No 3.26 of IS:15658) as per Table 2 of IS: 15658with flexural strength/breaking load as per Annexure G of IS: 15658, onthe prepared base course of the specified CBR as per table 1 of IRC SP 63 (2018) of else as mentioned in design and drawing with cushion of compacted bedding sand of 25-35 mm thick( grading of the bedding sand as per cl. 6.5.1 of IRC SP -63) and fuilling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will be as per clause 6.5.2 of IRC SP 63) and completing thje edges with cut blocks as per cl. no. 8.7 of IRC SP 63 (2018) with proper confinement of grading and joint filling sand , compaction , levelling and filling up of the edge gap. 60 mm thick
i) Coloured Decorative
20
1119
22381.6
... More
Supplying, fitting galvanised 3 ply 12 gauge / 4 points line of barbed wire in fencing (holes already made in the body of the post) or fixed by staples tightening and fixing the wires in taut condition with straining bolts including the cost of cutting and of lapping joints in the wire as necessary but excluding the cost of galvanised staples,straining bolt and binding wire where necessary.
150
27
4194
... More
Supplying galvanised straining bolts (with eye at one end with
double nuts and washers) fitted and fixed complete. (i) 10 mm. dia. (a) 150 mm.
36
43
1563.48
... More
Supplying galvanised staples fitted and fixed complete.
44 mm. to 50 mm. size
100
3
355
... More
Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared)
200
11
2222
... More
Supplying and laying chequered tiles of any shade & of approved quality with (1:1½:3) cement concrete laid in panels or patterns as directed in pavement, footpath etc. including necessary underlay 25 mm thick [avg] cement mortar (1:3) complete in all respect with all labour and materials. [Using cement slurry @ 4.4 kg/Sq.m at back side and @2.4 kg/Sq.m for joint filling]. Red Variety.
30 mm. thick
100
506
50601
... More
Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to
IS:13592-1992 with all necessary clamps nails, including making holes in
walls, floor etc. cutting trenches in any soil through masonry concrete
structures etc if necessary and mending good damages including joining with
jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete.
A) UPVC Pipes: 110 mm. Dia.
10
253
2535.1