West Bengal State Electricity Distribution Company Limited Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

West Bengal State Electricity Distribution Company Limited - WBSEDCL Tender

Works
Civil Works
Eprocure
Opening Date25 Oct 2019
Closing Date15 Nov 2019
Tender Amount₹ 44,38,506 
Notes
Download

Costs

Summary

Bnro/e-tender/2019-20/f-864/12 Dt 24.10.2019

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). (a) With earth obtained from excavation of foundation.

460

-

77.54

... More
Dismantling all types of masonry excepting cement concrete plain of reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor.

10

-

447

... More
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor.

10

-

939

... More
Removal of rubbish, earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge.

75

-

166

... More
Single brick flat soling of picked jhama bricks including removing & dressing bed to proper level & filling joints with powered earth or local sand.

305

-

358

... More
Cement concrete with graded stone ballast (40mm size excluding shuttering). In ground floor. Pakur variety. 1:3:6 proportion.

65

-

5376

... More
Ordinary Cement Concrete (mix 1: 1.5: 3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. Pakur variety. Consider a distance of 10 Km from sealdah railway station. In ground floor and foundation.

170

-

6261.68

... More
Hire & labour charges of shuttering with centering & necessary staging up to 4m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing & striking out after completion of work (up to roof of ground floor.

-

-

-

... More
a) 25mm to 30mm thick shuttering without staging in foundation.

360

-

209

... More
c)         Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work.

-

-

-

... More
i)                 Up to the roof of Ground floor.

1175

-

369

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust ( if necessary ) cutting to requisite length, hooking & bending to correct shape, placing in proper position & binding with 16 gauge black annealed wire at every inter section complete as per drawing and direction. For work in foundation and up to roof of ground floor/ up to 4mtr mild steel/ Tor steel. SAIL/ TATA/ RINL.

23

-

71416

... More
Supplying and laying polythene sheet (150gm /Sqm) over damp proof course or bellow flooring or roof terracing or in foundation trenches.

525

-

24

... More
M.S structural works in columns, beams etc. with simple rolled structural members (e.g, joists, angles, channel sections) conforming to IS 226, IS 808 & SP (6) 1964 connected to one another with bracket, gusset, cleats as per direction of Engineer-in-charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS 816 1956 & IS 9595 using electrodes of approved make and brand conforming to IS 814 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hires charges of all tools and plants and labour required for the work including all incidental charges, labour insurance charges etc. For structural members of specified section weighing less than 22.5 Kg/m.

6.5

-

72603

... More
Plaster (to wall, floor, ceiling etc.) with sand cement mortar including rounding off or chamfering corners as directed and racking out joints or roughening of concrete surface by chipping etc. including throating, nosing and drip course where necessary. Excluding cost of chipping over concrete surface.

-

-

-

... More
a)      In ground floor.

-

-

-

... More
ii)                  15 mm thick plaster with (1:6) cement mortar.

475

-

151

... More
Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc.

475

-

34

... More
1% Constructional Worker Welfare Cess

1

-

43945.6



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.