West Bengal State Electricity Distribution Company Limited Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

West Bengal State Electricity Distribution Company Limited - WBSEDCL Tender

Works
Civil And Construction
Paints and Enamels
Building Construction
Eprocure
Opening Date26 Jul 2024
Closing Date31 Jul 2024
Tender Amount₹ 7,75,665 
Notes
Download

Costs

Summary

Renovation With Inside Outside Painting And Other Allied Civil Works At Krishnanagar Divisional Office Under Krishnanagar Division In The District Of Nadia

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
b) In first floor

0.4

395

989

... More
Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof.

0.4

782

1956

... More
b) In first floor

0.5

1003

2006

... More
Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.

167

3173

19

... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge.

5

840

168

... More
Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety](a) 1:3:6 proportionr and foundation.

3.2

15801

4938

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any as per relevant IS codes. a) Pakur Variety(a) In ground floor

0.4

2130

5325.32

... More
b) In first floor

0.4

2168

5421.32

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominalsize excluding shuttering and reinforcement,if any, as per relevant IS codes. Pakur variety In 1st floor

0.2

1026

5134

... More
In 2nd floor

0.15

784

5229

... More
Extra rate for using water proofing and plasticising admixture @ 0.2% byweight of cement (or at manufacturer's specified rate) for concrete of variousgrades.

10

1190

119

... More
Brick work with 1st class bricks in cement mortar (1:6) In superstructure (a)in foundation &plinth

0.6

3065

5109

... More
a) In ground floor

0.25

1293

5174

... More
b) In first floor

0.25

1321

5285

... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.a) In ground floor

7

4753

679

... More
b) In first floor

1.5

1036

691

... More
C) In 2nd floor

1.5

1054

703

... More
Rendering the Surface of walls and ceiling with White Cement base WATER PROOF wall putty of approved make & brand.(1.5 mm thick)(i) Ground floor

100

8000

80

... More
In 1sl floor

16

1392

87

... More
Labour for taking out door and window frame including shutter for repair orreplacement of different parts of the frame & refixing the same including mendinggood all damaes complete. (Concrete and brick work for mending damage will bepaid separately)(a) Upto area 2.5 Sq.m(i) gr.floor

10

1190

119

... More
(ii)First floor

10

1207

120.78

... More
Labour for taking out steel door and window frame for repairs and re-fixing the same (or replacement by new one) including mending good damages (excluding the cost of repair of damages) and applying a protective coat of paint.

40

5120

128

... More
M.S. or W.I. ornamental grill of approved design joints continuously welded with M.S. W.I. flats and bars for windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. i) Grill weighing above 16 Kg./sqm a) In ground floor

0.3

2966

9888

... More
b) In first floor

0.45

4494

9986.88

... More
Welding in M.S. structural work with gas or electric:(a) tack weld

70

630

9

... More
(b) continuous weld

80

720

9

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including, rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface including threading nosing and drip course where necessary.i) With 1:6 cement mortar.a) 20 mm thick plaster.a.1) In ground floor

18

2970

165

... More
a.2) In first floor

15

2535

169

... More
a.3) In 2nd floor

17

2941

173

... More
15 mm th.b.1) In ground floor.1) In ground floor

28

4032

144

... More
b.2) In first floor

23

3404

148

... More
b.3)2nd floor

17

2584

152

... More
ii) With 4:1 cement mortar. a) 10 mm thick plaster.c.1) In ground floor

18

2304

128

... More
c.2) In first floor

15

1980

132

... More
c3) In 2nd floor

16

2176

136

... More
Scraping of moss, blisters etc.thoroughly from exterior surface of walls necessitating the use of scraper, wire brush etc.(Payment against this item will be made only when this has been done on the specific direction of the Engineer-in-charge)

650

4550

7

... More
Applying Interior grade Acrylic Primer of approved quality and brand von plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor)a) One Coati) Water based interior grade Acrylic Primer

3387

104319

30.8

... More
Applying Acrylic Emulsion Paint of approved make and brand on walls and ceiling including sand papering in intermediate coats including putty (to be done under specific instruction of Superintending Engineer) : (Two coats) ii) i) Standard Quality

3387

209994

62

... More
Applying Exterior grade Acrylic Primer of approved quality and brand on plastered or concretesurface old or new surface to receive decorative textured (mat finish) or smooth finish acrylic exterior Immersion paint including scrapping and preparing the surface thoroughly, complete as per manufacturer's specification and as per direction of E.I.C (i) One coat 1) In ground floor

420

13188

31.4

... More
2) In first floor

315

10117

32.12

... More
3) In 2nd floor

98

3218

32.84

... More
Protective and decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of EIC to be applied over acrylic primer as required.The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.b) Premium 100% Acrylic Emulsion1)In Ground floor (Two Coat)

420

35280

84

... More
2) In first floor(Two coat)

315

29206

92.72

... More
3) In 2nd floor

98

9941

101.44

... More
Removing loose scales, blisters etc. from old painted surface and thoroughly smoothening the surface to make the same suitable for receiving fresh coat of paint.

3625

79750

22

... More
a ) Priming one coat on timber or plastered or surface with synthetic oil bound primer of approved quality including smooth ening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)

173

6574

38

... More
b ) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)

550

15950

29

... More
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary.(a) On timber or plastered surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)

173

13494

78

... More
(b) On steel or other metal surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)

550

42350

77

... More
Supplying best Indian sheet glass panes set in putty and fitted and fixed with nails and putty complete. (In all floors for internal wall & upto 6 m height for external wall)(i) 3 mm thick (weighing 7.4 kg/Sq.m)

175

83475

477

... More
Renewing worn out putty of glass panes :(a) Panes not exceeding 0.2 Sq.m

53.42

1869

35

... More
Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in- Charge prior to execution will be necessary).

1500

16500

11

... More
Easing and oiling, cleaning collapsible gate and repairing to locking arrangements.

21

336

16

... More
Easing, oiling and adjusting the steel shutters including scraping all members and fitting so as to make the shutters easily operable (no extra payment will be made for taking out and fixing glass, if necessary).

50

2000

40



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.