Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
West Bengal State Electricity Distribution Company Limited - WBSEDCL Tender
Eprocure
Opening Date17 Jan 2019
Closing Date5 Feb 2019
Tender Amount₹ 9,01,526
Costs
EMD
₹ 18,031Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction Of B.p Sheet Flume Line At Ch. 22,23 And 24 And Refurbishment Of Some Portion Of Rcc Flume Line At Ch 42. For Mungpoo Kali Khola Hep, Takdah Under Mini Micro Hydel Division
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_WBSED_207941_1Bid Award Id
ViewTender No
WBSEDCL/MMHD/eTend/Civ/1819/06Tender Authority
West Bengal State Electricity Distribution Company Limited ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement concrete with 30mm down graded shinglesexcluding shuttering. N.B. Variety . In ground floor (a) 1:3:6 proportion ( VP-34,It. -22, Bldg 04.06.18 )
14
-
4608
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm
nominal size) excluding shuttering and reinforcement,if any, in ground floor
as per relevant IS codes.(b) River bazree ( VP-24,It. -4b, Bldg 04.06.18 )
14
-
5309
... More
Controlled Cement concrete with well graded stone chips (20 mm graded nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation. [using concrete mixture] M 20 Grade (ii)N.B.Variety ( Stone Metal) ( VP-25,It. -6(ii), Bldg 04.06.18 )
8.5
-
6823
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in Foundation, basement and upto roof of ground floor/ upto 4m. (i) Tor steel/ Mild steel. (ii)Other than SAIL/TATA/RINL.( VP-43,It. -40, Bldg 04.06.18 )
1.4
-
70544
... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.(b) where staging is not require. (VP-322,It.-18.05, Rds. 09.10.18)
131
-
214
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar
including rounding off or chamfering corners as directed and
raking out joints including throating, nosing and drip course,
scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (iii) 1:4 cement mortar, (b) 15mm. thick plaster (VP-189,It. -1(ii)b, Bldg 04.06.18)
72
-
169
... More
Neat cement punning about 1.5mm thick in wall, dado, window
sill, floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m.(VP-192,It. -15, Bldg 04.06.18)
72
-
34
... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc.Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof.I) For structural members of specified sections weighing less than 22.5 Kg./m (VP-99,It. -1(i), Bldg 04.06.18)
0.6
-
74571
... More
Priming one coat on steel or other metal surface with synthetic oil
bound primer of approved quality including smoothening surfaces by
sand papering etc.(VP-200,It. -1(a), Bldg 04.06.18)
234
-
30
... More
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface : With other than hi-gloss of approved quality. (iv) Two coats (with any shade except white).(VP-200,It. -2(A)(b)(iv), Bldg 04.06.18)
234
-
72
... More
Weaving wire mattress as directed with wire of 4mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the Engineer-in-charge including cost of supply of G.I. wire. (With 100mm x 100mm mesh.)(VP-201,It. -18.30, Rds 09.10.18)
70
-
201
... More
Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge. [Analyes Rate]
22.5
-
1753.5
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. (a) upto 3m depth, (iv) Without pumping out water and shoring (VP-284,It. -12.019I,a,iv), Rds 09.10.18)
44
-
114
... More
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.[Analyes Rate]
115
-
282.1
... More
Applying epoxy based reactive joining agent for joining the old concrete with fresh concrete to be applied within manufacturer's specified time as per manufacturers specification. (0.4 Kg / m² of concrete surface).Note: Applicable only when the full diameter of reinforcement steel is exposed. (VP-45,It. -7, Bldg 04.06.18)
1
-
313
... More
ADD 1% Cess on all items
1
-
8926