West Bengal State Cooperative Marketing Federation Limited Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
West Bengal State Cooperative Marketing Federation Limited - BENFED Tender
Eprocure
Opening Date2 Jan 2019
Closing Date18 Jan 2019
Tender Amount₹ 52,17,831 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,04,357Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_SCMFL_204625_1Bid Award Id
ViewTender No
SCMF/ENG/WIF/ME/28/2018-19Tender Authority
West Bengal State Cooperative Marketing Federation Limited ViewPurchaser Address
-Website
http://https://www.benfed.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Centrifugal,end -suction pumpset,complete with 15hp,3phase,415V,1500RPM ,TEFC squirrel cage induction moto, base frame & coupling as specified.Capacity 48.5 l.p.s. at 16 m.w.c Make -Kirloskar/KSB.
2
-
-
Atmospheric type ammonia condensers made from50mm 'C' class TATA pipe and 150mm U-bends,6.0meter longX 12 nos pipehighcomplete with sprinkler pipis,sprinkler header,gas and liquid headers& valves,M.S channels& angles etc as specified.
16
-
-
After installation is complete , the condenser shall be connected with the oil separator on the gas side and the receiver on the liquid side. The condenser shall be tested with Nitrogen gas with test pressure up to 25kg/sq.cm . All leakages revealed during test shall be rectified to the satisfaction of the Engineer. Further test for leakages shall be conducted after charging ammonia gas into the system with sulphur fumes.
1
-
-
After completion of testing and rectification of all leakages, the surfaces of the condenser pipes shall be thoroughly cleaned including removal of rust. The condenser will then be painted with 1 coat of steel primer and 1 coat of bituminous black paint.
1
-
-
Supply & Fixing sheet metal(16SWG) iron clad 400A TPN Cubical busbar chamber on angle iron frame on wall including earthing attachment complete with cover of the busbar chamber & 3 nos indicator lamps should be fixed incl. Necessary connection arrangements. This box is to be painted with 2 coats of approved anti corrosive paint over one coat of Red oxide primer complete with mending good damages with original finish.
1
-
-
Shifting the existing oil separator from its present position and installed near the newly constructed condenser tank outside the plant room as per the direction of EIC
1
-
-
Supply and installation of oil separator as specified.
1
-
-
Refrigeration piping, 'C' class,(TATA) fittings & 'DANFOSS'/Super Freeze incliding supports etc,as specified.
-
-
-
I ) Refrigeration piping:
-
-
-
100mm n.b
14
-
-
80mm n.b
90
-
-
65 mm n.b
18
-
-
50mm n.b
120
-
-
25mm n.b
18
-
-
15mm n.b
15
-
-
Refrigeration valves,flanged type with companion flanges,bolts,nuts,washer & gaskets:
-
-
-
65mm globe
2
-
-
50mmglobe
4
-
-
100mm globe valve
1
-
-
80mm globe valve
3
-
-
Screw type 15mm globe/Angle
6
-
-
Supply & installation of G.I medium,jindal/Bansal make piping,pipe fittings,supports,valves etc as specified
-
-
-
150mm n.b piping
36
-
-
125mm n.b. piping
36
-
-
50mm n.b. piping
90
-
-
150mm C.I foot valve
1
-
-
125mm C.I gate valve
6
-
-
125mm C.I check valve
4
-
-
150mm C.I gate valve
2
-
-
50mm G.M Gate valve
7
-
-
1.1 kv grade PVC & A aluminium cable and cable terminal jointing as specified.
-
-
-
3 .5 core ,120mm2 PVC and aluminium cable
130
-
-
3x16 mm2 copper wire through PVC flexible pipe from busbar to 15 hp motor via starter
60
-
-
3x10 mm2 copper wire through PVC flexible pipe from busbar to 7.5 hp motor via starter
60
-
-
3 .5 core 120mm2,terminal jointing
4
-
-
3C 16 mm2,terminal jointing
4
-
-
Supply & installation of Pump distribution panel as specified.
1
-
-
Double loop earthing of motors from Earthing bas bar as specified.
-
-
-
6 S.W.G.G.I wire for 15hp & 7.5 hp motor &starter.
60
-
-
Supply & installation of Earth station as specified.
4
-
-
Dismantling & shifting the existing 7.5hp pumpset from its present position and installed near the newly constructed condenser tank inside the newly constructed plant room as per the direction of EIC as specified.
2
-
-
Dismantling the existing liquid lines of existing receiver and making new connection as specified.
1
-
-
Dismantling the existing receiver as directed by EIC.
1
-
-
Dismantling and shifting the existing DOL starter for 7.5hp pump set as specified.
2
-
-
Supply of anhydrous amonia gas
18000
-
-
Erection ,Testing & Commissioning of refrigaration plant,including trail run as specified
1
-
-
Hiring charge of DG set for erection and testing purpose.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements