West Bengal Minorities Development And Finance Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
West Bengal Minorities Development And Finance Corporation - WBMDFC Tender
Eprocure
Opening Date18 Feb 2019
Closing Date12 Mar 2019
Tender Amount₹ 2,05,92,916
Costs
EMD
₹ 4,11,858Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_MDFC_217061_1Bid Award Id
ViewTender No
SA-1of 2018-19Tender Authority
West Bengal Minorities Development And Finance Corporation ViewPurchaser Address
-Website
http://http://www.wbmdfc.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
4th floor wall panelling Wall Vertical & Horizontal member size 65mm X 40mm
2.979
-
95114.69
... More
5th floor wall panelling Wall Vertical & Horizontal member size 65mm X 40mm
4.096
-
95397.49
... More
6th floor wall panelling Wall Vertical & Horizontal member size 65mm X 40mm
3.869
-
95680.29
... More
Painting with oil type wood preservative of approved brand & make (b) two coats over wooden brand &make
1200.91
-
45.29
... More
Supplying, fitting and fixing boiling water proof ply conforming to IS: 710-1977 bonded with phenol formaldehyde synthetic resin conforming to IS: 848-1974 of approved make and brand fitted and fixed as per design as per approval and direction of Engineer-in-Charge.[excluding the cost of supporting frame work and eak wood batten/Lipping] n (iv)12mm, 2nd floor
606.6
-
1964.89
... More
3rd floor
363.3
-
1980.73
... More
4th floor
372.6
-
1996.57
... More
5th floor
885.6
-
2016.93
... More
6th floor
735
-
2037.29
... More
4mm for decoration work 2nd floor
363.96
-
1075.77
... More
4mm for decoration work 3rd floor
217.98
-
1091.61
... More
4mm for decoration work 4th floor
223.56
-
1107.45
... More
4mm for decoration work 5th floor
531.36
-
1127.81
... More
4mm for decoration work 6th floor
441
-
1148.17
... More
19mm , 2nd FloorDecoration work
114.25
-
2769.18
... More
19mm , 3nd FloorDecoration work
114.24
-
2785.01
... More
19mm , 4th FloorDecoration work
114.24
-
2800.85
... More
19mm , 5nd FloorDecoration work
114.24
-
2821.21
... More
19mm , 6nd FloorDecoration work
114.24
-
2841.57
... More
Scantling upto 50mm wide and 12mm thick (chamfering or rounding) for ceiling/partition battens including fitting, fixing in position with washers, coach screws etc. Complete. Ordinary teak 1st to 6th floor
325
-
117.65
... More
Supplying fitting, fixing decorative lamination conforming to IS: 2046 : 1995 as per approved make, brand, finish and thickness with fitting, fixing the same on Particle/MDF / Ply Boards with recommended / approved adhesive with proper clipping the sides for better attachment as per direction of Engineer-incharge. The rate includes the cost of labour, adhesive and all incidental charges thereof.Glossy/Matt/Suede excluding surface texture or metallic ustre..i) Thickness of laminate 1.5mm.12 mm ply
-
-
-
... More
2nd floor
606.6
-
938.9
... More
3rd floor
363.3
-
954.73
... More
4th floor
372.6
-
970.57
... More
5th floor
885.6
-
990.93
... More
6th floor
735
-
1011.29
... More
Supplying, fitting and fixing 8mm thick Laminated wooden Flooring Work conforming to EN13329:2006 with plank size not Iess than 1200mmX 190 mm (with unilin/tongue-groove
locking arrangement) having 0.2mm thk top abrasive layer over a decorative layer followed by a High-density fibreboard (HDF) having density 940 kg/m3 substrate core over a rasin saturated backing layer and installing through unilin or tongue- groove system (having locking strength not less than 1000 kg/m) over a 2 mm thk underlayer polyurethene foam on polythene sheet 250 micron, over a smooth, flat, hard subfloor free from moisture ( 8%), grease etc. complete in all respect with requisiteaccessories like end profile, transition profile,reducer 'T' profile etc. wherever required and preparation ofbase including all other incidental works as per direction & satisfaction of Engineer in charge. Cost of Laminate Floor Accessories only (Skirting,End edge, T-moulding,Reducer )shall have to be added separately, wherever required. 5th floor
55.08
-
1514.68
... More
Supplying Laminate Floor Accessories (Skirting, End edge, Tmoulding,Reducer) to 8mm thick Laminated wooden Flooring Work conforming to EN13329:2006 with plank size not Iess than 1200mmX 190 mm (with unilin/tongue-groove
locking arrangement) having 0.2mm thk top abrasive layer over a decorative layer followed by a High-density fibreboard (HDF) having density 840 kg/m3 substrate core over a rasin saturated backing layer and installing through unilin or tongue- groove system (having locking strength not less than 1000 kg/m) over a 2 mm thk underlayer polyurethene foam on polythene sheet 250 micron, over a smooth, flat, hard subfloor free from moisture ( 8%), grease etc. complete in all respect as per direction & satisfaction of Engineer in charge. Cost of labour charge for fitting & fixing of Laminate Floor Accessories only (Skirting,End edge, T- moulding,Reducer)shall have to be added separately, wherever required 5th floor
53
-
430.99
... More
Supplying bubble free float glass of approved make and brand conforming to IS: 2835-1987.xiii) 12mm thick cleared toughened glass coforming to IS: 2553-1992 (Part-II) 2nd floor to 6th floor
281.17
-
3659.43
... More
(b) Supplying, fitting fixing Godrej type hydraulic (oil check) floor door spring,
heavy duty double action with brass shoe, brass top centre aluminium top cover
etc. complete set as per direction of Engineer-in-charg 2nd floor to 6thn floor.
10
-
4041.78
... More
b) Supplying 'Godrej' mortice lock chromium plated with keys 6 levers including fitting & fixing complete. Door
10
-
2210.37
... More
ii) Godrej Hydraulic door closer fitted and fixed complete.(a) Heavy type
10
-
2334.8
... More
Labour charge for fabrication and installation of composite door, window , partitions made from annodized extruded alloy aluminium sections for the following units:-(C) Fully glazed single leaf reamless swing door made of anodized aluminium alloy extrusions fabrication after cutting to proper shape and size, drilling and aligning fitted with heavy duty hydrolic action floor spring with top pin assembly and fitted with inbuilt locking arrangement and all other necessary fittings, fixture, adhesives and joineries, cutting the glass to requisite shape and size mounting the edges for fitting the same with dry set neoprine/EPDM gasket. 2nd floor to 6th floor
61.5
-
1697.93
... More
French polishing to wood work including preparing surface [ordinary gloss) wall panelling
1777.86
-
528.27
... More
Polyurethane Polishing to woodwork with required colour as approved by Engineer-in-Charge with preparing surface including scaffolding and hire charges of compressor machine including cost of filler and hardener
material such as P. U. Sealing, P. U. Top coat (Matt/Glossy), Thinner, Spirit etc. and inclusive of all operation, material and labour complete asper direction of Engineer-in- Charge. Colour natural
1777.86
-
946.81
... More
M.F. suspended ceiling made with 12.5 mm thick Gypsum plaster Board including G.I. perimeter channel of 0.55 mm flush (having two flanges 20 mm and 30 mm respectively and web 27 mm ) along with perimeter of ceiling with G.I. intermediate channel of 0.9 mm thick size 45 mmx15mm placed at 750 mm c/c with G.I. ceiling angle of size 25 mmx10mmx0.55 mm thick fixed to the ceiling with G.I. Cleat and steel expansion fastener ceiling section 0.55 mm thick of size 51.50 mmx26mm fixed to the intermediate channels with the help of connecting clip and in the direction of perpendicular to the intermediate channel of 300 mm c/c 12.5 mm thick Gypsum plastered board are to be fixed under ceiling section as above by machine screws. The boards are to be joined and finished with jointing compound, paper tape and application of top coat etc. as per the direction of Engineer-in-charge. (The rate includes of cost of all materials including all taxes cost of accessories, fittings and fixtures, scaffolding and labour charges etc. 2nd floor to 6th floor.
1911.6
-
1311.06
... More
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
-
-
-
... More
a) In 2nd floor including roof.
6.34
-
562.21
... More
a) in 4th floor including roof.
5.47
-
731.89
... More
b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surface by sand papering etc. 2nd Floor to 6th Floor
1487.5
-
42.99
... More
A) Painting with best quality synthetic enamel paint of approved make
and brand including smoothening surface by sand papering etc. including
using of approved putty etc. on the surface, if necessary :a) On timber or plastered surface :With super gloss (hi-gloss) (iv) Two coats (with any shade except white
1487.5
-
91.63
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements