West Bengal Mayel Lyang Lepcha Development Board Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

West Bengal Mayel Lyang Lepcha Development Board Tender

Works
Eprocure
Opening Date10 Sep 2019
Closing Date23 Sep 2019
Tender Amount₹ 20,79,783 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(a) Depth of excavation not exceeding 1.500 mm.

-

-

-

... More
RETAINING WALL

108.88

-

119.27

... More
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.

-

-

-

... More
RETAINING WALL

178.49

-

64

... More
Stone Boulder 150 mm of N. Bengal variety

-

-

-

... More
RETAINING WALL

26.77

-

1526.4

... More
(I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor

-

-

-

... More
(B) With N.B. Variety stone metal.

-

-

-

... More
(a) 1:3:6 proportion

-

-

-

... More
RETAINING WALL FLOOR

26.77

-

5971.2

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks ofapproved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)

-

-

-

... More
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.

-

-

-

... More
RETAINING WALL

466.71

-

334

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.

-

-

-

... More
(ii) River Bazree

-

-

-

... More
RETAINING WALL

93.48

-

7238.4

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.

-

-

-

... More
(a) For works in foundation and upto roof of groundfloor/upto 4 m

-

-

-

... More
(i) Tor steel/Mild Steel

-

-

-

... More
I. SAIL/ TATA/RINL

-

-

-

... More
Pls. Ref. to attached copy -

11.29

-

88513.2

... More
Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc.layer by layer complete .(payment to be made on the basis of measurement of finished quantity of work).

-

-

-

... More
(a) With earth obtained from excavation of foundation.

-

-

-

... More
RETAINING WALL

271.3

-

77.54



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.