West Bengal Industrial Infrastructure Development Corporation Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

West Bengal Industrial Infrastructure Development Corporation - WBIIDC Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date12 Jun 2023
Closing Date5 Jul 2023
Tender Amount₹ 21,31,924 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
AC Distribution board with fuses, MCB, isolators, breakers, Surge protection devices ,lugs,ties with other requisite materials etc. as required.

1

13109

13109.8

... More
Repairing of the Earthing Installations by using GI strip / GI wire as required as direction of EIC.

1

3575

3575.4

... More
Strengthening of the Galvanized Module Mounting spv Structures arrangement complete with mechanical protection incl S & F GI angle/ flat /channel and Reinstallation of the Solar Power Plant (10KWp) by using different accessories like PVC pipe, cable, cable tie, saddle, bend, nutbolt, hardware etc.

1

23836

23836

... More
Providing CC (6:3:1) base block (around the PV module structure) dimension 0.45x0.45x0.60 mt. above roof top, neatly cemented finish (3 mm thick), at the base structure (in lieu of CC muffing).

6

3630

605

... More
Installation, Testing and Commissioning of ON - GRID System Solar power plant 10KWp with Import-Export NET Metering System.

1

71508

71508

... More
AMC. Including monthly cleaning and periodic (monthly) maintenance of the above mentioned plant.

12

100116

8343

... More
PART-B: KALYANI PH_III: Supply of the following components/equipments of the ON - GRID System Solar power plant 10KWp with Import-Export NET Metering System. All the above materials must be of reputed make with IEC certifications as per MNRE and other relevant Rules and Regulations where applicable alongwith valid Warranty/Gurranty /Test Certificates etc. those are to be submitted at the time of installations. The total SPV plant have been fixed for three years warranty under the agency/bidder for trouble free operation (Make/Brand :- as approved by E-in- C). 1. Display repairing of Grid- interactive Solar Power Inverter suitable for 1x10KW SPV Plant & software upgradation.

1

35754

35754

... More
AC Distribution board with fuses, MCB, isolators, breakers, Surge protection devices ,lugs,ties with other requisite materials etc. as required.

1

13109

13109.8

... More
Repairing of the Earthing Installations by using GI strip / GI wire as required as direction of EIC.

1

1191

1191.8

... More
Strengthening of the Galvanized Module Mounting spv Structures arrangement complete with mechanical protection incl S & F GI angle/ flat /channel and Reinstallation of the Solar Power Plant (10KWp) by using different accessories like PVC pipe, cable, cable tie, saddle, bend, nutbolt, hardware etc.

1

23836

23836

... More
Installation, Testing and Commissioning of ON - GRID System Solar power plant 10KWp with Import-Export NET Metering System.

1

79850

79850.6

... More
AMC. Including monthly cleaning and periodic (monthly) maintenance of the above mentioned plant.

12

100116

8343

... More
PART C: ULUBERIA: Supply of the following components/equipments of the ON - GRID System Solar power plant 10KWp with Import-Export NET Metering System. All the above materials must be of reputed make with IEC certifications as per MNRE and other relevant Rules and Regulations where applicable alongwith valid Warranty/Gurranty /Test Certificates etc. those are to be submitted at the time of installations. The total SPV plant have been fixed for three years warranty under the agency/bidder for trouble free operation (Make/Brand :- as approved by E-in- C). 1. 1- Core x 4Sq.mm. PVC Cu cable (for Array interconnections and to inverter) of required length at site with MC-4 connector.

1

6674

6674.08

... More
AC Distribution board with fuses, MCB, isolators, breakers, Surge protection devices ,lugs,ties with other requisite materials etc. as required.

1

13109

13109.8

... More
Repairing of the Earthing Installations by using GI strip / GI wire as required as direction of EIC.

1

2383

2383.6

... More
Strengthening of the Galvanized Module Mounting spv Structures arrangement complete with mechanical protection incl S & F GI angle/ flat /channel and Reinstallation of the Solar Power Plant (10KWp) by using different accessories like PVC pipe, cable, cable tie, saddle, bend, nutbolt, hardware etc.

1

33370

33370.4

... More
Providing CC (6:3:1) base block (around the PV module structure) dimension 0.45x0.45x0.60 mt. above roof top, neatly cemented finish (3 mm thick), at the base structure (in lieu of CC muffing).

8

4840

605

... More
Installation, Testing and Commissioning of ON - GRID System Solar power plant 10KWp with Import-Export NET Metering System.

1

77467

77467

... More
AMC. Including monthly cleaning and periodic (monthly) maintenance of the above mentioned plant.

12

100116

8343

... More
PART D: FALTA -III: Supply of the following components/equipments of the ON - GRID System Solar power plant 10KWp with Import-Export NET Metering System. All the above materials must be of reputed make with IEC certifications as per MNRE and other relevant Rules and Regulations where applicable alongwith valid Warranty/Gurranty /Test Certificates etc. those are to be submitted at the time of installations. The total SPV plant have been fixed for three years warranty under the agency/bidder for trouble free operation (Make/Brand :- as approved by E-in- C). 1. Grid- interactive Solar Power Inverter suitable for 1x10KW SPV Plant , 415V ,50Hz AC with MPPT and associated control and protection devices all are integrated into the PCU.

1

126330

126330.8

... More
SPV Modules of suitable wattage fit for the plant, made of Multi/Poly Cristalline silicon solar cells. Module will be attain required output of the power plant(10KWp).

14

350389

25027.8

... More
1- Core x 4Sq.mm. PVC Cu cable (for Array interconnections and to inverter) of required length at site with MC-4 connector.

1

8938

8938.5

... More
5-Core 10Sq mm. PVC Cu cable (inverter to AC DB) of required length at site and 3.5C 16Sqmm PVC Al. Cable (ACDB to LT Panel/ Main Switch) of required length etc. at site.

1

2383

2383.6

... More
AC Distribution board with fuses, MCB, isolators, breakers, Surge protection devices ,lugs,ties with other requisite materials etc. as required.

1

13109

13109.8

... More
Supply and installation of Lightning Arrestor.

1

2383

2383.6

... More
Repairing of the Earthing Installations by using GI strip / GI wire as required as direction of EIC.

1

2383

2383.6

... More
Strengthening of the Galvanized Module Mounting spv Structures arrangement complete with mechanical protection incl S & F GI angle/ flat /channel and Reinstallation of the Solar Power Plant (10KWp) by using different accessories like PVC pipe, cable, cable tie, saddle, bend, nutbolt, hardware etc.

1

38137

38137.6

... More
Installation, Testing and Commissioning of ON - GRID System Solar power plant 10KWp with Import-Export NET Metering System.

1

113221

113221

... More
AMC. Including monthly cleaning and periodic (monthly) maintenance of the above mentioned plant.

12

100116

8343

... More
PART E: FALTA -IV: Supply of the following components/equipments of the ON - GRID System Solar power plant 10KWp with Import-Export NET Metering System. All the above materials must be of reputed make with IEC certifications as per MNRE and other relevant Rules and Regulations where applicable alongwith valid Warranty/Gurranty /Test Certificates etc. those are to be submitted at the time of installations. The total SPV plant have been fixed for three years warranty under the agency/bidder for trouble free operation (Make/Brand :- as approved by E-in- C). 1. Grid- interactive Solar Power Inverter suitable for 1x10KW SPV Plant , 415V ,50Hz AC with MPPT and associated control and protection devices all are integrated into the PCU.

1

126330

126330.8

... More
SPV Modules of suitable wattage fit for the plant, made of Multi/Poly Cristalline silicon solar cells. Module will be attain required output of the power plant(10KWp). This power plant require repairing of 7 modules and 5nos new PV modules.

1

125139

125139

... More
1- Core x 4Sq.mm. PVC Cu cable (for Array interconnections and to inverter) of required length at site with MC-4 connector.

1

8342

8342.6

... More
5-Core 10Sq mm. PVC Cu cable (inverter to AC DB) of required length at site and 3.5C 16Sqmm PVC Al. Cable (ACDB to LT Panel/ Main Switch) of required length etc. at site.

1

4767

4767.2

... More
AC Distribution board with fuses, MCB, isolators, breakers, Surge protection devices ,lugs,ties with other requisite materials etc. as required.

1

13109

13109.8

... More
Repairing of Lightning Arrestor by using requisite materials.

1

2383

2383.6

... More
Repairing of the Earthing Installations by using GI strip / GI wire as required as direction of EIC.

1

1191

1191.8

... More
Strengthening of the Galvanized Module Mounting spv Structures arrangement complete with mechanical protection incl S & F GI angle/ flat /channel inclusive of Mid clamp & Z clamp as required and Reinstallation of the Solar Power Plant (10KWp) by using different accessories like PVC pipe, cable, cable tie, saddle, bend, nutbolt, hardware etc.

1

25742

25742.88

... More
Installation, Testing and Commissioning of ON - GRID System Solar power plant 10KWp with Import-Export NET Metering System including all sorts of miscellanious materials.

1

125139

125139

... More
AMC. Including monthly cleaning and periodic (monthly) maintenance of the above mentioned plant.

12

100116

8343



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.