West Bengal Housing Infrastructure Development Corporation Limited Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
West Bengal Housing Infrastructure Development Corporation Limited - HIDCO Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date13 Nov 2024
Closing Date27 Nov 2024
Tender Amount₹ 16,07,860
Costs
EMD
₹ 32,157Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HIDCO_769108_1Tender No
HIDCO/GM(E)IV/CN/NIT63/24-25Tender Authority
West Bengal Housing Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Ordinary Cement concrete (mix 1:2:4) with graded stone
chips (20 mm nominal size) excluding shuttering and
reinforcement,if any, in ground floor as per relevant IS codes.
a) Pakur Variety
17.2
5806
99849.57
Hire and labour charges for shuttering with centering and
necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(f) 25 mm to 30 mm shuttering without staging in foundation
178
209
37202.84
Ordinary Cement concrete (mix 1:1.5:3) with graded stone
chips (20 mm nominal size) excluding shuttering and
reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety
61.44
6355
390477.81
Reinforcement for reinforced concrete work in all sorts of
structures including distribution bars, stirrups, binders etc
initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground
floor/upto 4 m
(i) Tor steel/Mild Steel
I. SAIL/ TATA/RINL
9.65
60580
584354.68
Removal of rubbish,earth etc. from the working site and
disposal of the same beyond the compound, in conformity
with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
99.9
166
16583.4
Supplying and laying and spigotted RCC Pipes (NP3 Class)
conforming to IS : 458
1200 mm Dia RCC pipe
10
6195
61950
Lobour for laying and spigotted RCC Pipes (NP3 Class)
conforming to IS : 458
1200 mm Dia RCC pipe
10
236
2360
Priming one coat on timber or plastered surface with
synthetic oil bound primer of approved quality including
smoothening surfaces by sand papering etc.
64.17
38
2438.46
Painting with best quality synthetic enamel paint of
approved make and brand including smoothening surface by sand papering etc. Including using of approved putty etc. on the surface, if necessary :
(a) On timber or plastered surface :
With super gloss (hi-gloss) -
(iv) Two coats (with any shade except white)
64.17
81
5197.77
Supplying, speading and consolidating stone dust to a depth of 100mm and above at desired density and C.B.R as per specification with power roller to proper gradient and camber including watering as necessary and lighting, gauarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks and depressions by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants complete as per specification.
i) 190mm thick compacted thikness
6.61
2117
14001.37
Plaster (to wall, floor, ceiling etc.) with sand and cement
mortar including rounding off or chamfering corners as
directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).
[Excluding cost of chipping over concrete surface]
(b) 15 mm thick plaster
64.17
194
12448.98
Earth work in filling in foundation trenches or plinth
with good earth, in layers not exceeding 150 mm.
including watering and ramming etc. layer by layer
complete. (Payment to be made on the basis of
measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation
54
77
4187.16
Earth work in filling in compound, tank, low land,
ditches etc. with good earth, in layers not exceeding
150 mm. including breaking clods and consolidating
the same by ramming and dressing complete.
(Payment will be made on profile measurement before
and after the work)
(a) With earth obtained by fresh excavation upto 1800
mm. depth (including the cost of excavation from land
arranged by the Deptt. within a lead of 100 m.)
81
172
13946.58
Brick work with 1st class bricks in lime and surki mortar
(1:2) (1 lime putty/paste: 2 surki) lime to be slaked at site and the mortar to be prepared with such lime putty and first class surki made from kiln burnt bricks having its fineness modulus between 2 and 2.5 and which passes through B.S. sieve No 8 with correspondes to I.S sieve No 200 with considerable grinding and pugging it complete.
b) In Super structure, ground floor.
5.69
5798
32961.63
Add CGST @9% of total amount to Rs.13,51,143.21
1351143.21
-
121602.89
Add SGST @9% of total amount to Rs.13,51,143.21
1351143.21
-
121602.89
Add Construction Cess @1% of total amount to Rs.13,51,143.21
1351143.21
-
13511.43
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%