West Bengal Electronics Industry Development Corporation Limited Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
West Bengal Electronics Industry Development Corporation Limited - WEBEL Tender
Software and IT Solutions
Eprocure
Opening Date12 Feb 2024
Closing Date4 Mar 2024
Tender Amount₹ 87,27,000
Costs
EMD
₹ 1,74,550Document Cost
₹ 1,000Tender Fee
Refer Documents
Summary
07 Webel Idm Solar Bn4 Bn9 2023 24 23
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WEBEL_666030_1Bid Award Id
ViewTender No
07/Webel/IDM/Solar/BN-4 BN-9/ 2023-24/23Tender Authority
West Bengal Electronics Industry Development Corporation Limited ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
PV Module mounting Galvanized MS Structure
-
-
-
The PV modules shall be mounted on the fixed metallic structure having adequate strength and appropiate design,which can withstand the load of the modules and high wind velocities.The array structure will be made of hot dip galvanized MS angles by approved drawing structure and bolting , clamping to the RCC/PCC foundation as Per TS . [Design to be approved by EIC before fabrication].
2262
-
-
PCC Structure for Module mounting GI structure.
-
-
-
Construction of a 400 mm x 400 mm pedestal with a suitable height(400 mm) using mixed concrete of M20 grade and well-graded stone chips of 20 mm nominal size is required to support the GI frame structure. The concrete should be placed in proper formwork compacting and curing the same completely. 4nos 12mm-200mm bolt and nut to be install at the time of casting in 250 mm square corner for holding GI structure. cutting water proofing layer if required before placing the concrete on RCC old roof. Proper chipping and application of concrete bond adhesive for bonding the new concrete with old RCC concrete to be applied as per specification and direction of the Engineer-in-charge, including hiring charges and all other incidental charges (Formwork) in this connection complete. "
130
-
-
SITC of PV DC Distribution box
-
-
-
a) An DC distribution box shall be mounted close to the inverter. The DC distribution box shall be of the thermo-plastic IP65/66 DIN-rail mounting type and shall comprise the following components, copper bus bar and cable terminations:
▪ Incoming positive and negative DC cables from the DC Combiner Box;
▪ DC circuit breaker,40A, 2 pole (the cables from the DC Combiner Box will be connected to this circuit breaker on the incoming side);
▪ DC surge protection device (SPD,1000V), as per IEC 60364-5-53;
.The Junction Boxes shall have suitable arrangement monitoring and disconnection for each of the groups.Voltage: Max. 1000V DC with all test certificate.
1
-
-
SITC of DC Combine box with 2 pole copper terminal and DC MCB of 50A for all input. This combine box shall be suitable for Outdoor use with DOP IP 66/67.
16
-
-
Solar Inverter/PCU
-
-
-
SITC of On Grid Solar Inverter/power conditioing unit (Rating: 70 KW/77KVA, 3Ph Inverter)0f 250-800 DC input voltage range and 415 VAC (+/- 10%),50Hz three phase otput voltage suitable to generate AC power with efficiency not less than 95%,Total harmonic distortion less than 3% and suitable for ambient tempertaure 0 to 50 degree C.The PCU shall be synchronized with the voltage and frequency level to suit the grid voltage frequency.The inverter shall be with MPPT facility and equipped wirh Bluetooth/Wi-fi/RS485 port facilities, must be capable of reverse power and single phase protection, over load protection, also nutral, body earthing arrangement and also remote monitoring and operating system as per TS.
1
-
-
SITC of GI pipe Earthings :
-
-
-
The Earthing with 50mm dia GI pipe of 3mtrs. Long including providing masonery Chember of size outer 86X86X54cm and inner 14X14cm with CI cover pit same of inner size, also provide salt, charcoal. Soil cutting and filling is in your own resposibility.
masonery enclosure to be plastered both side by 0.5 inch thick average and net cement finished only outer side.
2
-
-
SITC of copper Earthings :
-
-
-
The Earthing with copper plate size of 610x610x3mm having weight of 9.84kg and 1no 25x5mm copper flat of 3mtrs. Long including providing masonery Chember of size outer 86X86X54cm and inner 14X14cm with CI cover pit same of inner size, also provide salt, charcoal. Soil cutting and filling is in your own resposibility.
masonery enclosure to be plastered both side by 0.5 inch thick avarage and net cement finished only outer side. [
1
-
-
Supply and laying of 25X5mm copper flat for neutral Earthing will be fixed in wall or other areas by proper insulation post. Flat will be covered by sleev at soil.
70
-
-
Supply and laying of 25X5mm GI flat for body Earthing will be fixed in wall or other areas.
25
-
-
SITC of Remote Monitoring System (GPRS Type):
1
-
-
The RMS system is integrated or External unit.
The following parameters are accessible via the operating interface display in real time separately for solar power plant: AC Voltage., AC Output current, Output Power, DC Input Voltage, DC Input Current, Power produce, Protective function limits (Viz-AC Over voltage, AC Under voltage, Over frequency, Under frequency ground fault..
The data shall be recorded in a common work sheet chronologically date wise. The data file shall be MS Excel compatible. The data shall be represented in both tabular and graphical form.
Simultaneous monitoring of DC and AC electrical voltage, current, power, energy and other data of the plant for correlation with solar and environment data shall be provided.
-
-
-
Supply, Installation, Testing & Commissioning of Client PC:Processor: Intel core i9 up to 4.5 GHz, System Memory (RAM): 8 GB DDR4 (upgradable up to 64 GB), Optical Drive: DVD+RW, write to CD/DVD, SSD: 1TB (expandable), Network Interface Card (NIC): Dual NICs, Human Interface: keyboard and a mouse, Port:- USB, VGA, HDMI, Multi card reader, Ethernet port, Graphics Card : 8 GB Graphic Card, Two USB 2.0 ports • Two USB 3.0 ports, One VGA port (min)• One HDMI port(min), LAN port, Wi Fi, Original Operating System: Windows 11 Professional
1
-
-
All cable/wires shall be marked with good quality letter and number ferrules of proper sizes so that the cables can be identified easily. The IS 5578:1984 (First revision-2011)/ IEC 60391- 1972 shall be adhered to for guidelines for marking.
-
-
-
Supply of DC Cables 1100 voltage grade (Single Core Copper Tinned Solar DC Cable):
-
-
-
All DC cables shall be unarmored sunlight resistive halogen free in accordance with IEC 60754-1, Ozone resistance in accordance with EN 50396. Conductor shall be Electrolytic tinned copper Class 5, according to EN60228 or IEC 60228. Core insulation & outer sheath of the cable shall be as per XLPO (Electron beam cross linked polymer), fine wired in accordance to VDE 295 class5/IEC 60228 class 5, rated voltage shall be 1100/1500V & maximum permissible operating voltage shall be 1800V DC. Normal Operating temperature range shall be 40 deg C to +90 deg C with maximum permissible operating temperature 120 deg C, maximum short circuit temperature shall be 280 deg C. DC test voltage 15kV, type of insulation shall be according to IEC 605021, EN 50363-1. DC Cable shall be weather/UV resistive according to the HD 650/A1, Acid /brine resistance as per EN 60811-2-1, Flame resistance according to IEC 60323-1-2. Cable shall be rodent resistive. (First revision-2011)/ IEC 60391- 1972 shall be adhered to for guidelines for marking.
-
-
-
2.5sqmm
100
-
-
6sqmm
400
-
-
Laying copper wire (2Run) through 19mm UPVC conduit on surface or cable tray up to 35sqmm using by end termination,fittings and other accessories.
580
-
-
Supply of AC Cables(95 Sqmm 4 Core Aluminium XLPE Armoured cable ):
300
-
-
Laying cable up to 4cX95sqmm on surface, cable tray by fitting accessories
300
-
-
Cable end termination with Gland, copper Lugs, by proper arrangement.
-
-
-
for 4CX95sqmm
6
-
-
for 1CX2.5sqmm
15
-
-
SITC of Conventional Lightning Arrester (air terminals)
-
-
-
Air terminal should have 32mm dia and 2.5mtrs long as standerd design, to be installed by fusner or any solid arrengment over 20mtrs distance from each others. Also required connection to the building existing body eathing by copper conductor
4
-
-
Supply and laying of 25X5mm GI flat(down Conductor) for Ligting Arrester Earthing will be fixed in wall or other areas (from top to ground) as required as per IS 3043 & IS 2309 to complete the LA system.
100
-
-
SITC of 3phase power feeding Panel
-
-
-
A panel for required size of following electrical item-100A, 4P, Microprocessor based MCCB for incoming power, indication 3phase LED lamp, 3phase multifunctional meter with CT and remote monitoring arrangment with RS485. termination gland plate,Earthing arrangement in complete.
1
-
-
DG-SOLAR interlocking system by using 2.5sqmm wire control connection and installation of relay with necessary connection along with acessories as required in the existing main panel so that DG and Solar power never can run parellel in auto mode.
1
-
-
SITC of Bidirectional Energy Meter
-
-
-
SITC of Bidirectional Energy Meter for the measurment of export/ import energy. Approval/NOC from the concerned DISCOM(WBSEDCL/CESC) for installation of this meter to be arranged by the vendor before commissioning. For the connectivity, technical feasibility and synchronization of SPV source to the distribution netework power of the building to be ensured by the vendor.
1
-
-
SITC of DC MCB with additional arrangement as required.
-
-
-
6-32A SP DC MCB
10
-
-
6-32A DP DC MCB
11
-
-
40A DP DC MCB
10
-
-
SITC of 40A terminals with additional arrangement as required.
9
-
-
Note-The Contractor is liable to get all the materials approved by the Engineer In Charge. Any other item from the item lists left out from BOQ but essentially required for successful completion of the work may be raised for inclusion in the scope of work during pre-bid meeting. Otherwise bidder has to consider left out items deemed to be included in the scope of work. Bidders are advised to physically visit the site and participate in prebid meeting.
-
-
-
BN9 IT Park
-
-
-
Design, Supply, Installation, Testing & Commissioning of 80 kWp IOT enables On-Grid Roof top Solar Photovoltatic Plant with Mono Crystaline Silicon Solar Cells, Mounting Structure, Inverter, Protection System, Earthing & Lightning Arrestor etc. Complete in all respect with following details:-
-
-
-
SIT & C of Solar Photovoltaic Panels Halfcut 24 volts Mono PERC 540Wp (Each)
-
-
-
SIT & C of Solar Photovoltaic Panels Halfcut 24 volts Mono PERC 540Wp (Each)manufactured in India conforming to IS14286/IEC61215,IEC 61730-Part1 & part2. SPV module conversion efficiency shall not be less than 16.5%. PV modules used in solar power system must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years as per TS
150
-
-
PV Module mounting Galvanized MS Structure
2610
-
-
The PV modules shall be mounted on the fixed metallic structure having adequate strength and appropiate design,which can withstand the load of the modules and high wind velocities.The array structure will be made of hot dip galvanized MS angles by approved drawing structure and bolting , clamping to the RCC/PCC foundation as Per TS . [Design to be approved by EIC before fabrication].
-
-
-
PCC Structure for Module mounting GI structure.
180
-
-
Construction of a 400 mm x 400 mm pedestal with a suitable height(400 mm) using mixed concrete of M20 grade and well-graded stone chips of 20 mm nominal size is required to support the GI frame structure. The concrete should be placed in proper formwork compacting and curing the same completely. 4nos 12mm-200mm bolt and nut to be install at the time of casting in 250 mm square corner for holding GI structure. cutting water proofing layer if required before placing the concrete on RCC old roof. Proper chipping and application of concrete bond adhesive for bonding the new concrete with old RCC concrete to be applied as per specification and direction of the Engineer-in-charge, including hiring charges and all other incidental charges (Formwork) in this connection complete. "
-
-
-
SITC of PV DC Distribution box
15
-
-
a) An DC distribution box shall be mounted close to the inverter. The DC distribution box shall be of the thermo-plastic IP65/66 DIN-rail mounting type and shall comprise the following components, copper bus bar and cable terminations:
▪ Incoming positive and negative DC cables from the DC Combiner Box;
▪ DC circuit breaker,40A, 2 pole (the cables from the DC Combiner Box will be connected to this circuit breaker on the incoming side);
▪ DC surge protection device (SPD,1000V), as per IEC 60364-5-53;
.The Junction Boxes shall have suitable arrangement monitoring and disconnection for each of the groups.Voltage: Max. 1000V DC with all test certificate.
1
-
-
SITC of DC Combine box with 2 pole copper terminal and DC MCB of 50A for all input. This combine box shall be suitable for Outdoor use with DOP IP 66/67.
18
-
-
Solar Inverter/PCU
1
-
-
SITC of On Grid Solar Inverter/power conditioing unit (Rating: 100 KW/111KVA, 3Ph Inverter)0f 250-800 DC input voltage range and 415 VAC (+/- 10%),50Hz three phase otput voltage suitable to generate AC power with efficiency not less than 95%,Total harmonic distortion less than 3% and suitable for ambient tempertaure 0 to 50 degree C.The PCU shall be synchronized with the voltage and frequency level to suit the grid voltage frequency.The inverter shall be with MPPT facility and equipped wirh Bluetooth/Wi-fi/RS485 port facilities, must be capable of reverse power and single phase protection, over load protection, also nutral, body earthing arrangement and also remote monitoring and operating system as per TS.
-
-
-
SITC of GI pipe Earthings :
2
-
-
a) The Earthing with 50mm dia GI pipe of 3mtrs. Long including providing masonery Chember of size outer 86X86X54cm and inner 14X14cm with CI cover pit same of inner size, also provide salt, charcoal. Soil cutting and filling is in your own resposibility.
masonery enclosure to be plastered both side by 0.5 inch thick average and net cement finished only outer side.
-
-
-
SITC of copper Earthings :
1
-
-
a) The Earthing with copper plate size of 610x610x3mm having weight of 9.84kg and 1no 25x5mm copper flat of 3mtrs. Long including providing masonery Chember of size outer 86X86X54cm and inner 14X14cm with CI cover pit same of inner size, also provide salt, charcoal. Soil cutting and filling is in your own resposibility.
masonery enclosure to be plastered both side by 0.5 inch thick avarage and net cement finished only outer side.
-
-
-
Supply and laying of 25X5mm copper flat for neutral Earthing will be fixed in wall or other areas by proper insulation post. Flat will be covered by sleev at soil.
70
-
-
Supply and laying of 25X5mm GI flat for body Earthing will be fixed in wall or other areas.
115
-
-
SITC of Remote Monitoring System (GPRS Type):
1
-
-
The RMS system is integrated or External unit.
The following parameters are accessible via the operating interface display in real time separately for solar power plant: AC Voltage., AC Output current, Output Power, DC Input Voltage, DC Input Current, Power produce, Protective function limits (Viz-AC Over voltage, AC Under voltage, Over frequency, Under frequency ground fault..
The data shall be recorded in a common work sheet chronologically date wise. The data file shall be MS Excel compatible. The data shall be represented in both tabular and graphical form.
Simultaneous monitoring of DC and AC electrical voltage, current, power, energy and other data of the plant for correlation with solar and environment data shall be provided.
-
-
-
Supply, Installation, Testing & Commissioning of Client PC:Processor: Intel core i9 up to 4.5 GHz, System Memory (RAM): 8 GB DDR4 (upgradable up to 64 GB), Optical Drive: DVD+RW, write to CD/DVD, SSD: 1TB (expandable), Network Interface Card (NIC): Dual NICs, Human Interface: keyboard and a mouse, Port:- USB, VGA, HDMI, Multi card reader, Ethernet port, Graphics Card : 8 GB Graphic Card, Two USB 2.0 ports • Two USB 3.0 ports, One VGA port (min)• One HDMI port(min), LAN port, Wi Fi, Original Operating System: Windows 11 Professional
1
-
-
All cable/wires shall be marked with good quality letter and number ferrules of proper sizes so that the cables can be identified easily. The IS 5578:1984 (First revision-2011)/ IEC 60391- 1972 shall be adhered to for guidelines for marking.
-
-
-
Supply of DC Cables 1100 voltage grade (Single Core Copper Tinned Solar DC Cable):
-
-
-
All DC cables shall be unarmored sunlight resistive halogen free in accordance with IEC 60754-1, Ozone resistance in accordance with EN 50396. Conductor shall be Electrolytic tinned copper Class 5, according to EN60228 or IEC 60228. Core insulation & outer sheath of the cable shall be as per XLPO (Electron beam cross linked polymer), fine wired in accordance to VDE 295 class5/IEC 60228 class 5, rated voltage shall be 1100/1500V & maximum permissible operating voltage shall be 1800V DC. Normal Operating temperature range shall be 40 deg C to +90 deg C with maximum permissible operating temperature 120 deg C, maximum short circuit temperature shall be 280 deg C. DC test voltage 15kV, type of insulation shall be according to IEC 605021, EN 50363-1. DC Cable shall be weather/UV resistive according to the HD 650/A1, Acid /brine resistance as per EN 60811-2-1, Flame resistance according to IEC 60323-1-2. Cable shall be rodent resistive. (First revision-2011)/ IEC 60391- 1972 shall be adhered to for guidelines for marking.
-
-
-
2.5sqmm
120
-
-
6sqmm
440
-
-
35sqmm
50
-
-
Laying copper wire (2Run) through 19mm UPVC conduit on suface or cable tray up to 35sqmm using by end termination,fittings and other accessories.
600
-
-
Supply of AC Cables(95 Sqmm 4 Core Aluminium XLPE Armoured cable )
410
-
-
Laying of cable up to 4C X 95sqmm on surface, cable tray by fitting accessories
410
-
-
Cable end termination with Gland, Lux, by proper arrangement.
-
-
-
for 4CX95sqmm
6
-
-
for 1CX2.5sqmm
15
-
-
SITC of conventional Lightning Arrester (air terminals)
-
-
-
Air terminal should have 32mm dia and 2.5mtrs long as standerd design, to be installed by fusner or any solid arrengment over 20mtrs distance from each others. Also required connection to the building existing body eathing by copper conductor
4
-
-
Supply and laying of 25X5mm GI flat(down Conductor) for Ligting Arrester Earthing will be fixed in wall or other areas (from top to ground) as required as per IS 3043 & IS 2309 to complete the LA system.
80
-
-
SITC of 3phase power feeding Panel
-
-
-
A panel for required size of following electrical item-100A, 4P, Microprocessor based MCCB for incoming power, indication 3phase LED lamp, 3phase multifunctional meter with CT and remote monitoring arrangment with RS4858. termination gland plate,Earthing arrangement in complete.
1
-
-
DG-SOLAR interlocking system by using 2.5sqmm wire control connection and installation of relay with necessary connection along with acessories as required in the existing main panel so that DG and Solar power never can run parellel in auto mode.
1
-
-
SITC of Bidirectional Energy Meter
-
-
-
SITC of Bidirectional Energy Meter for the measurment of export/ import energy. Approval/NOC from the concerned DISCOM(WBSEDCL/CESC) for installation of this meter to be arranged by the vendor before commissioning. For the connectivity, technical feasibility and synchronization of SPV source to the distribution netework power of the building to be ensured by the vendor.
1
-
-
SITC of DC MCB with additional arrangement as required.
-
-
-
6-32A SP DC MCB
11
-
-
6-32A DP DC MCB
12
-
-
40A DP DC MCB
11
-
-
SITC of 40A terminals with additional arrangement as required.
10
-
-
Note-The Contractor is liable to get all the materials approved by the Engineer In Charge. Any other item from the item lists left out from BOQ but essentially required for successful completion of the work may be raised for inclusion in the scope of work during pre-bid meeting. Otherwise bidder has to consider left out items deemed to be included in the scope of work. Bidders are advised to physically visit the site and participate in prebid meeting.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements