West Bengal Agro Industries Corporation Limited Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
West Bengal Agro Industries Corporation Limited - WBAIC Tender
Civil And Construction
Civil Works Others
Coronavirus COVID 19
Eprocure
Opening Date4 Mar 2020
Closing Date17 Mar 2020
Tender Amount₹ 7,61,079
Costs
EMD
₹ 15,230Document Cost
₹ 1,000Tender Fee
Refer Documents
Summary
Aic/aed/niet-184/19-20/gr_21
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_WBAIC_276850_21Bid Award Id
ViewTender No
AIC/AED/NIeT-184/19-20Tender Authority
West Bengal Agro Industries Corporation Limited ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement andupto roof of ground floor/upto 4 m(i) Tor steel/Mild Steel JSW,JSPL etc
2.139
-
58880.53
... More
Brick work with 1st class bricks in cement mortar (1:6)())(b) In superstructure, first floor
24.96
-
5300
... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in first Floor
16.56
-
694
... More
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface andn application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinarycement). Using grey cement first floor
58.4
-
327.85
... More
Supplying 1.5mm thick M.S. sheet fitted and fixed on one or both faces of M.S./ W.I. gate etc. with point welding at not more than 150mm apart complete in all respect as per design including cost of all labour and materials.First floor
8.64
-
1320
... More
Supplying, fitting and fixing windows and ventilators with or without integrated grills conforming to IS 1038-1975 and manufactured from rolled steel sections conforming to IS 7452-1974 with non-friction projecting type, box type hinges, glazing clips, lugs locking bracket, handle plate etc, including hoisting in position, straightening if required, fixing lugs in cement concrete ( 1:2:4) with stone chips 20
mm down cutting holes and mending good damages to match with existing surface complete in all respect excluding glazing.Openable steel windows as per IS sizes with side hung shutters and horizotal glazing bars.First floor
11.94
-
2225.39
... More
M.S.or W.I. Ornamental grill of approved design joints
continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor)
(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.Fr fl
2.803
-
10121.21
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary[Excluding cost of chipping over concrete surface])At first Floor i)with 1:4 Cement Morter ,c)10 mm thk. Plaster
76.783
-
133
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary[Excluding cost of chipping over concrete surface])At first Floor i)with 1:6 Cement Morter ,c)20 mm thk. Plaster
112.2
-
170
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary[Excluding cost of chipping over concrete surface])At first Floor i)with 1:6 Cement Morter ,c)15 mm thk. Plaster
123.237
-
148
... More
Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
42.18
-
34
... More
Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC.Two Coats Solvent based interior grade Acrylic Primer
188.983
-
48.5
... More
Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface.
Two Coats
188.983
-
70
... More
Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured(matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC two coats first floor
123.237
-
45.81
... More
Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of EIC to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer premium 100%Acrylic Emulsion two coat
123.237
-
84.71
... More
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
24
-
29
... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :On steel or other metal surface :With other than hi-gloss of approved quality-Two coats (with any shade except white)
24
-
72
... More
supplying ,fitting & fixing UPVC pipes A-Type conforming to IS:13592-1992 with all necessary clamps nails,including making holes in wall,floor etc,cutting trenches in any soil through masonary concrete structures etc if necessary and mending good damages including joining with jointing materials spumYarn,Valamoid/Bitumen/M-Seal etc)completeA)UPVCPipe,ii)110 dia
27.6
-
251
... More
Plain Tee 110 mm dia
8
-
172
... More
shoe 110 mm dia
8
-
111
... More
Electrification
1
-
20000
... More
BALA cost
1
-
20755
... More
Sub Total
-
-
-
... More
GST 12%
1
-
80736.85
... More
CESS 1%
1
-
7535.44
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements