Water Resources Development Directorate Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Water Resources Development Directorate - WRDD Tender

Works
Civil And Construction
Irrigation Work
Water Storage And Supply
Eprocure
Opening Date7 Jun 2024
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dressing and chilchalling flanks or slope of embankment including filling with earth or cutting upto 150 mm. average thickness and ramming properly after sprinkling water.

1426.8

14268

10

... More
For Surface Flow Minor Irrigation Scheme and Field Channel Works extra rate of 4 % should be allowed over the existing schedule rate excluding Earthwork i.e. item No. 4

4

886

22174

... More
Pucca Ghat : Earth work in excavation of foundation trenches or drains in all sorts of soil ( including mixed soil but excluding laterite and sand stone), including removing, spreading, or stacking the spoils, as directed and including trimming the sides of trenches, levelling, dressing and ramming the bottoms, bailing or pumping out water etc.as required complete .Depth of excavation not exceeding 1.5 mtrs &lead upto 15 m.(not requiring shoring).

36.97

4409

119.27

... More
Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidated the same by through saturation with water ramming complete including the cost of supply of sand.

8.04

10589

1317.14

... More
Single brick flat soling of picked Jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

20.25

7310

361

... More
Ordinary Cement Concrete (1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, as per relevent IS codes.

17.64

114404

6485.54

... More
Hire & labour charges of shuttering with centering and necessary staging upto 4 mtrs using approved stout props & thick hard wood planks of approved thickness with required bracing for concrete slabs, bems, columns, lintels curved or straight including fitting fixing and striking out affer completion of works(upto the roof of ground floor).25mm to 30 mm thick wooden shuttering.

115.16

38578

335

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. JSW/JSPL/SHYAM/ SRMB/ BMASL/ ELECTRO STEEL/SSL

1.39

83307

60150

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] With 1:4 cement mortar. 20 mm thick plaster, in ground floor

90.5

17557

194

... More
Neat cement punning about 1.50mmthickin wall dado, floor, drain, door and window sill etc.complete.

90.5

3077

34

... More
Earth work in filling in foundation trenches or plinth with good earth in layer not exceeding 15 cm. Inlcuding watering & ramming etc. layer by layer complete with earth obtained form excavation of field channel.

12.32

955

77.54

... More
Protection Work : Supplying Bamboo piles at work site, driving and fitting, fixing with iron nails and half split wailing post etc. & strengthening with earth filled gunny bags stacked at site. (ii) 5cm-7.5 cm av. Diameter

136

149867

1101.97

... More
For Surface Flow Minor Irrigation Scheme and Field Channel Works extra rate of 4 %

4

5994

149867.92

... More
Display Board : Supplying, fitting and fixing including transportation of sign board for identifying the exact location of MINI RLI scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm x 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding LS 3,677.51 and writting of both sides of Sign board. Base - Yellow, and words - Red. Both bottom end of the stands pipe will be grouted in 1:2:4 CC on a single brick flat soling. This will include one materials and labour complete as per drawing and direction of E.I.C.

1

3677

3677.51

... More
Extra carriage of materials by cart/boat/head load besides initial transport of construction materials by truck (from road to work site)4 % of Total.

4

147

3677.51

... More
TOTAL WITHOUT GST AND LABOUR CESS

1

841610

1

... More
Including GST @ 18%

18

151489

841610.24

... More
Including Cess @ 1%

1

9931

993100.09



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.