Water Resources Development Directorate Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Water Resources Development Directorate - WRDD Tender
Civil And Construction
Irrigation Work
Water Storage And Supply
Eprocure
Opening Date7 Jun 2024
Closing DateCancelled
Tender AmountRefer Documents
Costs
EMD
₹ 20,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRDD_690256_1Tender No
WRDD/KOLAID/01/2024-25Tender Authority
Water Resources Development Directorate ViewPurchaser Address
-Website
http://http://www.wbwridd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Dressing and chilchalling flanks or slope of embankment including filling with earth or cutting upto 150 mm. average thickness and ramming properly after sprinkling water.
1426.8
14268
10
For Surface Flow Minor Irrigation Scheme and Field Channel Works extra rate of 4 % should be allowed over the existing schedule rate excluding Earthwork i.e. item No. 4
4
886
22174
Pucca Ghat : Earth work in excavation of foundation trenches or drains in all sorts of soil ( including mixed soil but excluding laterite and sand stone), including removing, spreading, or stacking the spoils, as directed and including trimming the sides of trenches, levelling, dressing and ramming the bottoms, bailing or pumping out water etc.as required complete .Depth of excavation not exceeding 1.5 mtrs &lead upto 15 m.(not requiring shoring).
36.97
4409
119.27
Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidated the same by through saturation with water ramming complete including the cost of supply of sand.
8.04
10589
1317.14
Single brick flat soling of picked Jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
20.25
7310
361
Ordinary Cement Concrete (1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, as per relevent IS codes.
17.64
114404
6485.54
Hire & labour charges of shuttering with centering and necessary staging upto 4 mtrs using approved stout props & thick hard wood planks of approved thickness with required bracing for concrete slabs, bems, columns, lintels curved or straight including fitting fixing and striking out affer completion of works(upto the roof of ground floor).25mm to 30 mm thick wooden shuttering.
115.16
38578
335
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
II. JSW/JSPL/SHYAM/ SRMB/ BMASL/ ELECTRO STEEL/SSL
1.39
83307
60150
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] With 1:4 cement mortar. 20 mm thick plaster, in ground floor
90.5
17557
194
Neat cement punning about 1.50mmthickin wall dado, floor, drain, door and window sill etc.complete.
90.5
3077
34
Earth work in filling in foundation trenches or plinth with good earth in layer not exceeding 15 cm. Inlcuding watering & ramming etc. layer by layer complete with earth obtained form excavation of field channel.
12.32
955
77.54
Protection Work : Supplying Bamboo piles at work site, driving and fitting, fixing with iron nails and half split wailing post etc. & strengthening with earth filled gunny bags stacked at site.
(ii) 5cm-7.5 cm av. Diameter
136
149867
1101.97
For Surface Flow Minor Irrigation Scheme and Field Channel Works extra rate of 4 %
4
5994
149867.92
Display Board : Supplying, fitting and fixing including transportation of sign board for identifying the exact location of MINI RLI scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm x 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding LS 3,677.51 and writting of both sides of Sign board. Base - Yellow, and words - Red. Both bottom end of the stands pipe will be grouted in 1:2:4 CC on a single brick flat soling. This will include one materials and labour complete as per drawing and direction of E.I.C.
1
3677
3677.51
Extra carriage of materials by cart/boat/head load besides initial transport of construction materials by truck (from road to work site)4 % of Total.
4
147
3677.51
TOTAL WITHOUT GST AND LABOUR CESS
1
841610
1
Including GST @ 18%
18
151489
841610.24
Including Cess @ 1%
1
9931
993100.09