Water Resources Development Directorate Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Water Resources Development Directorate - WRDD Tender
Civil And Construction
Eprocure
Opening Date9 Sep 2024
Closing Soon18 Nov 2024
Tender AmountRefer Documents
Costs
EMD
₹ 22,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRDD_740643_1Tender No
2/24-25/WBADMIP/EE(DPMU)/PRLTender Authority
Water Resources Development Directorate ViewPurchaser Address
-Website
http://http://wbwridd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Excavation in gravel / moorum / kankar / compact moorum / very much weathered rock / sticky soil mixed with moorum or ghooting for WDS / WHS / RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1000 m including spreading , leveliing disposed spoils at disposed area. ( mode of measurement : pre work and post work)
2925.09
-
-
Excavation in soft weather rock / solt laterite rocks for WDS / WHS/RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1000 m including spreading, leveliing disposed spoils at disposed area. (mode of measurement : pre work and post work)
1462.54
-
-
Compaction of earthwork in embankment by watering, rolling with sheep foot Roller or loaded truck in layers of 25 cm. as per direction of the Engineer -in-Charge
600
-
-
Supplying, testing and installation of open Weave Jute Geo- textile (JGT )having overall weight of 500 gm/sq.m, thickness 6mm, width 1220 mm, Tensile strength 10KN/m (Warp direction) × 7.50KN/m (weft direction) on slopes of embankments dressed and cut to a gradientas per design and drawing for control of surfaces oil erosion on proposed bank slope of embankment including the cost of preparation of sub-grade and excavating the trenches of 500mm deep and spade- width wide where necessary, and filling the trenches with earth duly secured to sub-grade by U shape MS staples (11gauges) or wooden or plastic pegs at an interval of 450 mm, providing side lapping of 100 mm and horizontal lapping of 300 mm as per direction complete.The rate is inclusive of all incidental charges, transportation by all means to the worksite, all leads and lifts complete. (Payment will made on the basis of finished surface area of the slope).
300
-
-
Spillway for Construction of Goyalapara (202,205,206,207,209) WDS
-
-
-
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm.
6.13
-
-
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
8.91
-
-
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25 mm to 30 mm shuttering without staging in foundation
24.8
-
-
Providing and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in single row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD drawing and Technical specifications. for 600 mm dia pipe
7.5
-
-
Ordinary Cement Concrete (mix1:2:4) with garaded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any in ground floor as per relevant IS code.a) Pakur variety
2.74
-
-
Outlet for Construction of Goyalapara (202,205,206,207,209) WDS
-
-
-
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm.
1.31
-
-
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
3.8
-
-
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25 mm to 30 mm shuttering without staging in foundation
10.94
-
-
Supplying, fitting and fixing PVC pipes for underground work of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted including cost of all materials ,jointing materials, cutting pipes, making threads ,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.)
PVC Pipes 200 mm dia
7
-
-
Ordinary Cement Concrete (mix1:2:4) with garaded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any in ground floor as per relevant IS code.a) Pakur variety
1.89
-
-
Chute for Construction of Goyalapara (202,205,206,207,209) WDS
-
-
-
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm
3.86
-
-
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
16.1
-
-
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25 mm to 30 mm shuttering without staging in foundation
28.89
-
-
Ordinary Cement Concrete (mix1:2:4) with garaded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any in ground floor as per relevant IS code.a) Pakur variety.
6.03
-
-
Supplying, fitting and fixing including transportation of sign board for identifying the exact location of scheme , the board will be made 1.5 mm thick MS plate of size 1000 mm x 750 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding and pasting printed digital display and bottom end of the stands pipe will be grouted in 1:2:4 CC as per drawing and direction of E.I.C.
1
-
-
Painting with best quality synthetic enamel paint of approved make and brand including smoothing surfacing by sand papering etc. including using approved putty etc. on the surface if necessary.(a) On timber or plaster surface (iv) Two coats (with any shade except white)
Inlet Wall face
8
-
-
Painting of Block letters or digit in Black Japan or any approved paint. Size above 7.5 cm and upto 10 cm
Writing of staff gauging in Feet for measuring water Depth of WDS in block letters on chute wall face
50
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%