Water Resources Development Directorate Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Water Resources Development Directorate - WRDD Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date30 Aug 2024
Closing Date27 Sep 2024
Tender Amount₹ 13,85,904 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
75 mm dia Lay Flat Hose (Non ISI).

300

33600

112

... More
Drilling and Installation of STW (Solar):

-

-

-

... More
Drilling of bore hole of suitable diameter upto required depth by water jet system through any type of soil including hire and labour charges for boring pipes, scaffolding, other tools and plants etc. and taking out the same all complete and other incidental works in this connection. The bore hole should have minimum 65 mm gap in between outside of the tube well pipe and the bore. ii) for Lowering 100 mm dia tube well.

180

47185

262.14

... More
Labour charges for lowering of pipe, strainers, blank pipes etc. and fitting, fixing the same including cutting, threading where neccessary complete including bucket washing and other incidental works in this connection. i) 100 mm dia PVC Pipe bottom plug with cutter.

9

636

70.73

... More
ii) 100 mm dia ribbed screen/strainer.

36

2546

70.73

... More
iii)100 mm dia PVC blank pipe.

135

9548

70.73

... More
Supplying and filling up of the annular space between the Well Pipe and the bore hole by coarse sand of fineness modulus not less than 2 including watering as necessary as per direction of the Engineer-in-Charge.

6

5091

848.66

... More
Supplying, fitting and fixing including supplying of suitable jointing compound for fixing in position, threading, if necessary etc. all complete. (a) 100 mm. dia. CI cutter piece upto 450 mm. long with socket.

3

990

330.03

... More
c)250 x 50 x 6 mm thick, 80 mm dia, M S Supporting clamp with 2 nos 12 mm dia 65 mm long bolts, nuts,washer, on each side.

3

2970

990.1

... More
Washing and development by pumping with 30 cum per hour capacity pump for a period till sand free water comes out and the discharge is about 30 cum per hour, followed by final yield test; inclusive of all tools, plants and scaffolding and hire charge of centrifugal pump set and other fittings as necessary all complete.

3

4724

1574.73

... More
Labour charges for testing by 5 H.P. Pump Set at site for at least 1(one) hour including supplying necessary fuels and lubricants.

3

1669

556.34

... More
Charges for Mobilisation of drilling equipments, tools & plants etc and transportation of of departmental materials from any sub divisional store to work site and returning excess departmental materials if any, to the same sub divisional store after complete.

3

2630

876.94

... More
Add GST @18% on sl. No. 2.01 to 2.10

77992.98

14038

0.18

... More
Add Labour Welfare Cess @ 1% on sl. No.2.01 to 2.11

92031.72

920

0.01

... More
3 HP Solar Monoperc Pumping System with 3HP Surface Pump of STW (Solar):

-

-

-

... More
Solar Module: Supply , transport , installation and commissioning of ISI marked Solar Modules as per following specification: 1. Cell: Indigenous mono crystalline silicon SPV cells 2. Solar Module: Monocrystalline cell with PERC technology / module with bifacial cell. 3. Standards: ISI marked as per IS 14286 and having certification of IEC 61853(1), 61730(1&2), 61710 4.Modules must qualify to IS 170210 (Part 1) 5.Min. Efficiency: 19.5%. 6. Fill factor: More than 75% . 7. Module wattage mismatch in the SPV array: within ±3% 8. Wattage output warranty:Should not be less than 90% at the end of 10 years and 80% at the end of 25 years. 9.The power output of individual PV modules used in the PV array, under STC: minimum 300 Wp. Necessary test certificates also to be supplied. For detail information please see Cl. no. 2.1 of technical specification . c) For 3HP Off-grid Solar Water Pumping System with Monocrystalline / Monocrystalline PERC/bifacial SPV modules - 3200-3400 Wp.

9750

314827

32.29

... More
Module Mounting Structure ( For 1HP, 2HP, 3HP, 5HP and 10 HP Solar Water Pumping System): Supply, transportation & installation of G.Imanual tracking structure made of MS hollow sections, pipes, plates, angles etc as per IS:4923, IS:1161/1239, IS:1079/2062, to hold min300Wp SPV Module asper drawing and technica lspecification. The steel structureis to be protected with minimum 80 micron galvanisation (hot dip) and provided with fixed arrangement or dual axismanual tracking arrangement for three times in a day and seasonal tilting to face the sun optimity. The weight of the Module Mounting Structure holding 4 Modules should not be less than 280 Kgs, holding 6 Modules should not be less than 350 Kg (350 kg for 6 module structure 1 nos.)

1080

169560

157

... More
Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concrete foundation for dual axis manual tracking SPV Module structure as per approved drawing. For 6 module structure.

3

38091

12697

... More
Power conditioning unit with enclosure : Supply , transport , installation and commissioning of Solar Power conditioning Unit consisting of following components and features: 1)VariablefrequencyDrivewithinbuiltMPPT,voltagerange suitable for operating pump-motorset of 1HP to 20 HP,detail mentioned in 2) Power input : DC source for 1HP, 2HP and 3HP. 3) Power input : AC / DC source or hybrid for 5HP and above. 4) Incomer: DCMCB2 Pole16 amp up to7.5HP,25amp for 7.5HP and 10HP, 40 amp for15 to 20 HP as per IS / IE C609472 5) Incomer:ACMCB4 pole16 amp for 5.0HP,25 amp for 7.5HP and10HP,40 amp for 15 to 20 HPas per IS/IE C609472 6) Type II DC SPD of 40 KA. 7) Type II AC SPD of 40 KA for AC/ DC or Hybrid input. 8) Dual input (solar / Grid ) 25amp changeover switch for 5HP and 7.5 HP, 40 amp for 10 HP, 63 amp for 15 to 20 HP 9) Reverse protection diode 1600 VDC with heat sink. 10) Data Logger. 11) Remote monitoring system. 12) Should have built –in EMC filters . 13)IP 65 glands for cable in and out. 14) Min. IP 54 enclosure. c) For 3 HP capacity Pump-motor set with DC input.

3

120750

40250

... More
Cable and Accessories : Supplying, fitting and fixings of UV rated Copper Cable laid inside HDPE conduit and other accessories as per followings with necessary connection with the Solar PV Module, MPPT etc. i. 4.0 Sq mm single core multi studs- 5m(for 1HP/2HP/3HP) & 20m(for 5/10/15/17.5/20 HP) ii. Lugs, HDPE Pipe, Flexible Pipe, Saddle, Cable tie etc. a) For 1 HP / 2 HP / 3HP per structure.

3

3402

1134

... More
Earthing: Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below: By ISI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipments incl. drilling holes, with bolts, nuts, washers etc.

3

7983

2661

... More
Connecting the equipments to earth busbar including S & F GI (Hot Dip) wire of 8 swg on wall/floor with staples buried inside wall/floor as required and making connection to equipments with bolts, nuts, washers, cable lugs etc. as required and mending good damages.

30

390

13

... More
a) Lighting System at Scheme: (with lighting Pole) : Dusk to dawn lighting arrangement of at 4 mts height above ground level, with Hot dip galvanised 80 mm x 50 mm , medium duty pipe, with 12 V, 15Ah 2-in-1 Lithium ion/ Ferro- Phosphate battery with in-built 7-11watt LED lamp , 50 Wp solar panel (min 19% Eff.) to cover the scheme area. The lighting system should be warranted for 5 years from the date of installation.

3

57090

19030

... More
b) Lightning protection (Pole mounted): Lightning protection with 1.5"G.I G.I pipe of 4mts+ 0.75 height with base flange in proper RCC foundation and S & F Lightning Conductor Air Terminal made of 20 mm dia 1000 mm long GI pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mm dia 6 mm thick GI base plate at bottom incl. necessary holes etc. Earthing with 65 mm dia GI pipe (Medium) 3.0 Mts. long and 1 x 19/10 stranded GI (Hot Dip) wire (4 Mts. long), 20 mm dia x 125 mm long galvanized bolt, double nuts, double washers including socketing at both ends of stranded GI (Hot Dip) wire by crimping sockets/ thimbles and S & F 65 mm dia GI pipe (ISI-Medium) protection (3 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts. including connection to earth electrodes with 25 X 6mm G.I strip. (Provision of one lightning protection for each scheme as per drawing)

3

32049

10683

... More
Supply and installation of 3 phase electro motor pump-motor set suitable for Solar operation covering 5 years warranty for the following conditions including loading, unloading, transportation etc.:- b) 3 HP ISI marked 3 phase surface mounted Monoblock Pump-motor having discharge at required head as below::- i) Surface Pump-motor set for STW, ISi marked as per IS·: 9079 with di"hatge of 6.50-7.14 Lps at J6 mts. total head with foot valve, required quantity offlexible suction pipe( I Sm), clamps, bend, footvalves and all other accessories to complete connection of suction and delivery side.

3

120699

40233

... More
Testing and commissioning of scheme after completion of all work.

3

6000

2000

... More
a) Supply, fitting and Fixing of Pump-motor shed of height 0.85 m (as per drawing ) withHot dip Galvanised IS A 25 X 25 x 3 & 1.5mm MS sheet including foundation Base of 0.95 m x 0.65 m for Pump Unit ( BFS, .075mm 1:2:4PCC,100mm1:1.5:3CC)-For 2HP and 3HP surface pump.

3

14895

4965

... More
Comprehensive maintenance charges for 4 years beyond 1 year warranty period (which cover monthly inspection, Yearly training to WUA, to attend breakdown within 3 days and to keep the scheme in operation without lapse of time). b) For 3 HP both for Submersible & Surface pump. Note:1 Total comprehensive maintenance charge is to be withheld in addition to Securirty Deposit. Comprehensive maintenance charges will be released @ i) Rs 0.80 for 2 HP, ii) Rs.0.80 for 3 HP, iii) )Rs.0.60 for 5HP / 10HP / 15HP / 17.5HP and 20HP Submersible & Surface per Wp per year at the end of each maintenance period i.e.at the end of 1st year, 2nd year, 3rd year, 4th year& 5th year. In case the “Bidder” does not provide service during the warranty & comprehensive maintenance period, the amount so held up will be forfeited.

9750

39000

4

... More
Insurance @ 2% for a period of 5 years. Note:2 : 1st year's Insurance charge is to be paid on production of Original Receipt of premium payment. Remaining 4 years Insurance payment is to be withheld which will be released during 2nd, 3rd , 4th & 5th year on production of Original Receipt of premium payment.

613366.5

12267

0.02

... More
Supplying, fitting and fixing including transportation of sign board for identifying the exact location of MINI RLI scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm x 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding and writting of both sides of Sign board. Base - Yellow, and words - Red. Both bottom end of the stands pipe will be grouted in 1:2:4 CC on a single brick flat soling. This will include one materials and labour complete as per drawing and direction of E.I.C.

1

3677

3677.51

... More
Extra transportation @ 2% for item No 3.01 & 3.02.

484387.5

9687

0.02

... More
Add GST @18% on Sl. No. 3.01 to 3.16

950369.09

171066

0.18

... More
Add Labour Welfare Cess @ 1% on Sl. No. 3.01 to 3.17

1121435.53

11214

0.01

... More
Institutional development & Capacity building of Water Users Association of STW(Solar):

-

-

-

... More
Campaigning in the command area of clustered STW Sub-projects by community workers for mass awareness , capacity building to achieve sustainability of Sub-projects. Cost include wage payment to community workers, transportaton, leaflet etc. Charge of the campaigning is to be paid on production of good quality of photograph of the campaigning with beneficiaries.

2

5200

2600

... More
Demarcation of command area, selection of beneficiaries and preparation of land schedule within one cluster having CCA 36 Ha.

1

5000

5000

... More
Meeting Cost for WUA formation, cost including Refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charges

1

3000

3000

... More
Registration Cost for WUA under suitable act ( Society ) deed writing including registration charge, conveyance cost & opening of Bank A/C etc.

1

1200

1200

... More
Livelyhood plan / Micro plan formulation cost for minor irrigation scheme, cost including refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charge (rate on meeting). One training immediately after formation of WUA & remaining 03 nos training from each season Kharif, Aman & Rabi). Note: Charge of 1st training is to be paid on production of attendence sheet of the training, remaining 3 nos training charges will be released after completion of 1 year with security deposit on production of attendence sheets of remaining 3 nos training. In case the ''Agency'' does not provide service during the maintanance period, the amount so held up will be forfeited.

4

12000

3000

... More
Meeting and onsite demonstration for operation & maintenance of tubewells, water manangement and mode of collection of water tax, building of corpus fund etc.

2

6000

3000

... More
Supply of IEC Materials ( Leaflet, poster, notebook )= 8 meetings, for Sl. No- 4.02 and Sl.No - 4.04.

100

3500

35

... More
Documentation Cost for activities of WUA Scheme - by still photography, report booklet etc in both hard and soft copy.

1

1000

1000

... More
Impact study & monitoring of scheme by site visit of 2 Community workers during 3 years' period. Note: The ''Agency'' have to submit attendence sheet and if does not provide service during the 3years period, the amount so held up will be forfeited. Note: Charge of the impact study & monitoring to be withheld in addition to security deposit and will be released after completion of the 03 years.

9

10800

1200

... More
Institutional development & Capacity Building cost of 36 HA CCA of WUA from Sl. No. 4.01 to 4.09.

47700

47700

1

... More
Final Estimated cost of 18 HA CCA (1 Cluster with 3 Nos STW(S).

1325

23850

18



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.