Water Resources Development Directorate Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Water Resources Development Directorate - WRDD Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date28 Mar 2025
Closing Date12 Apr 2025
Tender Amount₹ 57,22,989
Costs
EMD
₹ 1,14,460Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WRDD_831468_1Tender No
WBWRIDD/EE (AI) /BANKURA/e NIT 16/ RIDF/ 2024-25Tender Authority
Water Resources Development Directorate ViewPurchaser Address
-Website
http://http://www.wbwridd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Electrologging of bore hole of different dia tubewell for locating water bearing strata and saline aquifer, if any, after conducting relevant geophysical tests. All test reports and compiled data sheets should be submitted to Engineer-in-Charge (Cost is inclusive of all materials, labour & compilation of data sheets. The work should be done as per direction of Engineer-in-charge including compilation of data.)
6
8015
48090.48
... More
Labour charges for lowering of pipe, strainers, blank pipe etc. and fitting, fixing the same including cutting, threading where necessary complete including bucket washing and other incidental works in this connection. N.B. :- For lowering of PVC-U pipe rates for the item No. 3(iii) are to be reduced by 25%
-
-
-
... More
ii)100 mm dia UPVC Pipe with bottom cutter, Screen (Ribbed) pipes, blank pipe
504
70
35647.92
... More
iii) 150 mm dia UPVC Housing Pipe
288
102
29534.4
... More
Supplying, fitting and fixing including supplying of suitable joining compound for fixing in position, threading, if necessary etc. all complete.
-
-
-
... More
(c) 150 mm dia GI threaded top cap fixed in position.
6
565
3394.62
... More
(a) ii) 100 mm. dia. CI cutter piece upto 450 mm. long with socket.
6
330
1980.18
... More
(d) 80 mm dia plug of approved make conforming to I.S. Specifications.
6
150
905.22
... More
(e) (ii)100 mm x 150 mm UPVC reducing socket .
6
471
2830.68
... More
Supply of gravel for use as pack in the tube well of 2mm to 4mm size (AS PER is:4097) and gravel treatment of tubewell including screening washing, cleaning etc. of the gravels at the site all complete as per direction of Engineer-in-Charge . (i) For site at any district of West Bengal upto 60.00 kms distance from quarry.
72
2917
210060
... More
Washing and development by pumping with 30 cum per hour capacity pump for a period till sand free water comes out and the discharge is about 30 cum per hour, followed by final yield test; inclusive of all tools, plants and scaffolding and hire charge of submersible pump, generator etc. all complete.
6
4563
27383.28
... More
Charges for mobilisation of drilling equipments, tools & plants etc and transportation of departmental materials from sub-divisional store to work site and returning excess departmental materials if any, to sub divisional store after completion of work .
6
1810
10862.76
... More
Making arrangement and showing verticality test including cost/hire charges of necessary tools and plants, scaffolding, labour etc. – all complete as per direction of Engineer-in-Charge.
6
858
5148.48
... More
Supplying, fitting and fixing including transportation of sign board for identifying the exact location of MINI RLI scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm x 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding LS 3,677.51 and writting of both sides of Sign board. Base - Yellow, and words - Red. Both bottom end of the stands pipe will be grouted in 1:2:4 CC on a single brick flat soling. This will include one materials and labour complete as per drawing and direction of E.I.C
6
3677
22065.06
... More
Supplying, fitting & fixing of M.S. plate of size 20 cm x 20 cm, thickness 6 mm, make of two halves (20cm x 10 ern), placed over Housing Pipe of LDTW to rest the supporting clamps,with semi circular hole of 90 mm dia. at centre including locking arrangement between the two halves on both sides,including fitting, fixing of 25 mm dia. G.!. bend by making a hole on plate for passing submersible cable smoothly and complete in all respect.
6
382
2297.04
... More
Solar Module: Supply , transport , installation and commissioning of ISI marked Solar Modules as per following specification: (1). Cell: Indigenous mono crystalline silicon SPV cells. (2) Solar Module: Monocrystalline cell with PERC technology / module with bifacial cell. (3) Standards: ISI marked as per IS 14286 and having certification of IEC 61853(1), 61730(1&2), 61710 (4) Modules must qualify to IS 170210 (Part 1) (5).Min. Efficiency: 19.5%. (6) Fill factor: More than 75%. (7) Module wattage mismatch in the SPV array: within ±3% (8) Wattage output warranty:Should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (9)The power output of individual PV modules used in the PV array, under STC: minimum 300 Wp. Necessary test certificates also to be supplied. For detail information please see Cl. no. 2.1 of technical specification .
-
-
-
... More
d) For 5 HP Off-grid / On-grid Solar Water Pumping System with Monocrystalline/ Monocrystalline PERC/bifacial SPV modules - 5400-5800 Wp.
33000
32
1065570
... More
Module Mounting Structure : Supply , transportation & installation of G.I manual tracking / Fixed structure made of MS hollow sections, pipes, plates, angles etc as per IS:4923, IS:1161/1239, IS:1079/2062, to hold min 300 Wp SPV Module as per drawing and technical specification. The steel structure is to be protected with minimum 80 micron galvanisation(hot dip) and provided with fixed arrangement or dual axis manual tracking arrangement for three times in a day and seasonal tilting to face the sun optimally.
-
-
-
... More
The approximate weight of the Module Mounting Structure given in Clause no.5.1 should be followed.( 1 no. 6 module + 1 no. 4 module Fixed str.)
3780
157
593460
... More
Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concrete foundation for dual axis manual tracking SPV Module structure as per drawing.
-
-
-
... More
a) For 4 module structure
6
10512
63075.66
... More
b) For 6 module structure
6
12378
74270.76
... More
Power conditioning unit with enclosure :
Supply , transport , installation and commissioning of Solar Power conditioning Unit consisting of following components and features: (1) Variable frequency Drive with inbuilt MPPT, voltage range suitable for operating pump-motor set of 1HP to 20 HP, detail mentioned in in Cl.6.1. (2) Power input : DC source for 1HP, 2HP and 3HP. (3) Power input : AC / DC source or hybrid for 5HP and above. (4) Incomer: DC MCB 2 Pole 16 amp upto 5 HP, 25 amp for 7.5HP and 10 HP, 40 amp for 15 to 20 HP as per IS/IEC 60947-2 (5) Incomer: AC MCB 4 pole 16 amp for 5.0 HP, 25 amp for 7.5HP and 10 HP, 40 amp for 15 to 20 HP as per IS/IEC 60947-2 (6) Type II DC SPD of 40 KA. (7) Type II AC SPD of 40 KA for AC/ DC or Hybrid input. (8) Dual input (solar/Grid) 25 amp changeover switch for 5HP and 7.5 HP, 40 amp for 10 HP, 63 amp for 15 to 20 HP (9) Reverse protection diode 1600 VDC with heat sink. (10) Data Logger. (11) Remote monitoring system. (12) Should have built –in EMC filters. (13)IP 65 glands for cable in and out. (14) Min. IP 54 enclosure. For detail features, protections, RMS, Communication architecture, Security, Data storage, tolerance of various parameters, standards to be qualified, etc. please refer to Cl. 6.1 of technical qualification. Note: AC SPD, AC MCB and Selector switch to be provided only for item no. 3(g), to 3(l).
-
-
-
... More
d) For 5 HP capacity Pump-motor set with DC input
6
56882
341292
... More
Cable and Accessories :
Supplying, fitting and fixings of UV rated Copper Cable laid inside HDPE conduit and other accessories as per followings with necessary connection with the Solar PV Module, MPPT etc.
i. 4.0 Sq mm single core multi studs - 5m(for 1HP/2HP/3HP) & 20m(for 5/7.5/10/15/17.5/20 HP)
ii. Lugs, HDPE Pipe, Flexible Pipe, Saddle, Cable tie etc c) For For 5 HP per structure, 2 or more structure per structure with 9m distance between sturctures.
12
3434
41208
... More
Earthing: Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below:
By ISI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipments incl. drilling holes, with bolts, nuts, washers etc.
12
2661
31932
... More
Connecting the equipments to earth busbar including S & F GI (Hot Dip) wire of 8 swg on wall/floor with staples buried inside wall/floor as required and making connection to equipments with bolts, nuts, washers, cable lugs etc. as required and mending good damages.
120
13
1638
... More
a) Lighting System at Scheme: (with lighting Pole) :
Dusk to dawn lighting arrangement of at 4 mts height above ground level, with Hot dip galvanised 80 mm x 50 mm , medium duty pipe, with 12 V, 15Ah 2-in-1 Lithium ion/ Ferro- Phosphate battery with in-built 7-11watt LED lamp , 50 Wp solar panel (min 19% Eff.) to cover the scheme area. The lighting system should be warranted for 5years from the date of installation.
6
19030
114180
... More
b) Lightning protection (Pole mounted): Lightning protection with 3" X 1.5" G.I pipe of 6m + 1 m height with base flange in proper RCC foundation and S & F Lightning Conductor Air Terminal made of 20 mm dia 1000 mm long GI pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mm dia 6 mm thick GI base plate at bottom incl. necessary holes etc. Earthing with 65 mm dia GI pipe (Medium) 3.0 Mts. long and 1 x 19/10 stranded GI (Hot Dip) wire (4 Mts. long), 20 mm dia x 125 mm long galvanized bolt, double nuts, double washers including socketing at both ends of stranded GI (Hot Dip) wire by crimping sockets/ thimbles and S & F 65 mm dia GI pipe (ISI-Medium) protection (3 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts. including connection to earth electrodes with 25 X 6mm G.I strip. (Provision of one lightning protection for each scheme as per drawing)
6
10683
64098
... More
Supply and installation of 3 phase AC electromotor pump-motor set with speed of 3000 r.p.m(synchronous speed) suitable for Solar applications and shall have 60 months guarantee for the following conditions including loading, unloading, transportation etc.:- (Refer technical specification for more detail) d) 5 HP 3 phase AC Pump-Motor set having discharge at required head as below:-iii) Submersible Pump-motor set for LDTW with external part made of stainless steel of grade 304 or higher as per IS 6911 and IS 3444,with discharge of 7.5 Lps- 5.83 Lps at 30 mts.-35 mts. total head with cable(3m), cover plate, Socket, Flanged Nipple, Rubber Insertion, Nuts& bolts and all other accessories including transportation of Bend, Column Pipes, cable, sluice valve, lay flat hose pipe etc. from Deptt. Store to site within 100km. The pump motor should be tested as per IS 8034:2048(third revision)
6
46339
278034
... More
Testing and commissioning of scheme after completion of all works
6
2000
12000
... More
Cleaning and washing of modules once in a month with clear water to remove deposited dust and dirt on the module surface and keep the modules clean throughout the year. The activity to be performed for eight months in a year excluding four monsoon months. A log book should be maintained at thr site for the said purpose.(8 months for 5 years of 2 structure = 8 x 5 x 2 = 80)
480
300
144000
... More
Comprehensive maintenance charges for 5 years (which cover monthly inspection, Yearly training to WUA, to attend breakdown within 3 days and to keep the scheme in operation without lapse of time)c) For 5 HP both for Submersible & Surface pump Note:1- Total comprehensive maintenance charge is to be withheld in addition to Securirty Deposit. Comprehensive maintenance charges will be released @ i) Rs 0.80 for 2 HP, ii) Rs.0.80 for 3 HP, iii) Rs.0.60 for 5 HP / 7.5/ 10 HP / 15HP / 17.5HP and 20 HP Submersible & Surface per Wp per year at the end of each maintenance period i.e.at the end of 1st year, 2nd year, 3rd year, 4th year& 5th year. In case the “Bidder” does not provide service during the warranty & comprehensive maintenance period, the amount so held up will be forfeited.
33000
3
99000
... More
Remote monitoring for 5 years: Provision for remote monitoring for the pumps must be made in the pump controller through an integral arrangement having following basic functions:
a. Controller must be assigned with a unique serial number and its live status must be observed remotely on online portal through login credentials.
b. Live status must indicate whether controller is ON/ OFF. The parameters i.e. the water output, water flow rate, in fault condition, array input voltage/ current, power and motor frequency should at logged at an interval of 10 minutes c. Controller must have a back up to store the data locally ( at least for 1 year) supply & installation of GSM/GPRS based Data Transmitter or Modem and to provide remote monitoring service to transmit the parameters to central server from the solar pumping system with time stamp at user-defined interval and report generation at the buyer end. (Refer Technical Spec.)
6
21850
131100
... More
Insurance @ 2% for Item No. 1, 4, 8, and 10 for a period of 5 years. Note:2
Ist year's Insurance charge is to be paid on production of Original Receipt of premium payment. Remaining 4 years Insurance payment is to be withheld which will be released during 2nd, 3rd , 4th & 5th year on production of Original Receipt of premium payment.
1799076
-
35981.52
... More
Campaigning in the command area of clustered LDTW Sub- project by community workers for mass awareness capacity building to achieve sustainability of Sub-projects Cost include wage payment to community workers, transportaton, leaflet etc:
2
2600
5200
... More
Demarcation of command area, selection of beneficiaries and preparation of land schedule within one cluster having CCA 36Ha
1
5000
5000
... More
Meeting Cost for WUA formation, cost including Refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charges
2
3000
6000
... More
Registration Cost for WUA under suitable act (Society) deed writing including registration charge, conveyance cost & opening of Bank A/C, etc.
1
1200
1200
... More
Livelyhood plan / Micro plan formulation cost for minor irrigation scheme, cost including refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charge (rate on meeting)
6
3000
18000
... More
Meeting and onsite demonstration for operation & maintenance of tubewell, water manangement and mode of collection of water tax building of corpus fund etc.
3
3000
9000
... More
IEC Materials (Leaflet, poster, notebook ) = 8 meetings for SL-2 and SL-4
100
35
3500
... More
Documentation Cost for activities of WUA Scheme by still photography, report booklet etc in both hard and soft copy.
1
1500
1500
... More
Impact study & monitoring of scheme by site visit of 2 Community workers during 3 years period.
10
1200
12000
... More
PVC pipes of nominal dia 100 mm , wall thickness 5.0 mm , conforming to IS : 12818/1997 (medium casing) .
396
510
201960
... More
150 mm nominal dia 7.5 mm wall thick PVC Casing (medium casing) pipes as per IS : 12818/1997
288
1124
323712
... More
PVC Screen (Ribbed) Pipes of nominal dia 100 mm (O.D. 117 mm) , wall thickness 5.0 mm, conforming to IS : 12818/1997 .
72
817
58824
... More
80 mm (NB) MS /GI ERW 90 degree Bend as per IS 1239 (Part-II)/1992 with latest amendment, both end welded with flange as per IS 6392/1971, Table-17 with latest amendments. Both bend & flange are duly ISI certification marked.
6
2800
16800
... More
80mm dia 6 mm thick heavy duty M S supporting clamp with 2 nos. 12 mm dia 65 mm long bolts, nuts, washer on each side for holding Column Pipe.
12
2185
26220
... More
Lay Flat hose of 75 mm nominal size polyster reinforced lay flat hose (the hose should has, wall thickness 1.3 ± 0.3 mm working pressure 3.0 kg/m2 & brusting pressure (9 kg/m2). The Lay flat hose should have a standard length of 100/200 m roll.
600
112
67200
... More
3 Core 2.5 sqmm Flat Weather Proof Copper PVC insulated heavy cable as per IS Specification (Brimsin or of any other reputed brand as per direction of EIC).
288
163
46944
... More
a) 80 mm dia(NB) Column Pipe one end screwed and other end with standard flange (3m long) as per IS Specification (TOP)
6
5500
33000
... More
b) 80 mm dia(NB) Column Pipe both end screwed and one end socketed (3m long) as per IS Specification (BOTTOM)
66
4800
316800
... More
Add GST @ 18 % Value of Item No 1 to 33
3877005.26
-
697860.95
... More
Add L. W. CESS @ 1 % Value of Item No 1 to 43
5666326.21
-
56663.26
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%