Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Water Resources Development Directorate - WRDD Tender

Works
Civil And Construction
Excavation
Irrigation Work
Eprocure
Opening Date10 Sep 2024
Closing Date27 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Wbwrdd/ee(am)/hwh/enit 18/24-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in ordinary soil / mixed soil i.e. clay mixed with moorun , kankar, pebbles / silt dry or moist / slushy silt / sticky soil for WDS / WHS / RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1500 m including spreading, leveliing disposed spoils at disposed area. (mode of measurement : pre work and post work) a) For Excavation of Canal

32180.11

3153650

98

... More
b) For Cross Bandh

56.11

5498

98

... More
Dressing and chilchalling flanks or slope of embankment including filling with earth or cutting upto 150 mm. average thickness and ramming properly after sprinkling water.

23741.12

237411

10

... More
For Surface Flow Minor Irrigation Scheme and Field Channel Works extra rate of 4 % should be allowed over the existing schedule rate excluding Earthwork (for Item Sl No 1,2,3 & 6)

1

10035

10035.09

... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.

260.52

31072

119.27

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

15

5355

357

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes. a) Pakur Variety.

2.84

16998

5985.22

... More
Providing and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in single row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD. (D) 600 mm dia [ Ref: ₹ 382.00 + Analysis for cost of carriage & Materials attached]

20

59178

2958.92

... More
Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth .

1.28

7116

5560

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] With 1:4 cement mortar. 20 mm thick plaster, in ground floor

15.96

2952

185

... More
Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc. NOTE : Cement 0.152 cu.m. per 100 sq.m.

15.96

542

34

... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). (a) With earth obtained from excavation of foundation.

234.24

18162

77.54

... More
For Surface Flow Minor Irrigation Scheme and Field Channel Works extra rate of 4 % should be allowed over the existing schedule rate excluding Earthwork i.e.(for Item Sl No 9 - 14)

1

3685

3685.72

... More
Supplying Jhaw / Eucalyptus bullah piles at work site, driving and fitting, fixing with iron nails and half split wailing post etc. (ii) 10/12.5 cm av. Diameter

1

72087

72087

... More
Supplying Bamboo piles at work site, driving and fitting, fixing with iron nails and half split wailing post etc. & strengthening with earth filled gunny bags stacked at site. (ii) 5cm-7.5 cm av. Diameter

1

16500

16500

... More
For Surface Flow Minor Irrigation Scheme and Field Channel Works extra rate of 4 % (for Sl no 17-18)

1

3543

3543.48

... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.

0.54

64

119.27

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

1.2

428

357

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes. a) Pakur Variety.

0.09

538

5985.22

... More
Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth .

1.08

6004

5560

... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). (a) With earth obtained from excavation of foundation.

0.18

13

77.54

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] With 1:4 cement mortar. 20 mm thick plaster, in ground floor

4.1

758

185

... More
Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc. NOTE : Cement 0.152 cu.m. per 100 sq.m.

4.1

139

34

... More
18 mm. to 22 mm. thick, kota stone slab set in 20 mm thick (avg) cement mortar (1:4) in floor, stair & lobby including pointing in cement slurry with admixture of pigment matching the stone shade, including grinding & polishing as per direction of Engineer-in-charge to match with the existing work. [Slurry for bedding @ 4.4 kg/Sq.m and pointing @2.0 kg/Sq.m]

1

1015

1015

... More
Painting block letters or digits in Black Japan or any approved paint as per direction. c) Size above 4 cm. and upto 5 cm.

200

2000

10

... More
d) Size above 5 cm. and upto 7.5 cm

100

1100

11

... More
Extra carriage of materials by cart/boat/head load besides initial transport of construction materials by truck (from road to work site)4 % ( From Sl No 20-29 except sl No. 20,&24)

1

479

479.39

... More
GST @ 12% (For Sl No 1-30)

1

440375

440375.88

... More
Cess 1%(For Sl No 1-31)

1

41101

41101.75



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.