Water Resources Development Directorate Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Water Resources Development Directorate - WRDD Tender
Civil And Construction
Drainage Work
Pipe Line Project
Eprocure
Opening Date12 Dec 2024
Closing Date20 Dec 2024
Tender Amount₹ 1,94,564
Costs
EMD
₹ 3,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wrdd/eeam/blg/np/nit No.-16(e)/2024-25(sl.10)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRDD_782930_10Tender No
WRDD/EEAM/BLG/NP/NIT NO.-16(e)/2024-25Tender Authority
Water Resources Development Directorate ViewPurchaser Address
-Website
http://http://wbwridd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity).
0.01
48741
438.67
... More
Earth work in filling in trenches after laying pipe lines (PVC, RCC, ACP etc.) with good earth obtained from excavation of field trenches in layers not exceeding 225 mm, including watering and ramming etc. layer by layer complete. (Payment will be made on the basis of measurement of finished .quantity of work.)
489.87
66
32336.32
... More
Single brick flat soling of picked Jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand.
11.97
324
3878.28
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge
3.26
328
1069.28
... More
Ordinary Cement concrete (Mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement , if any, in ground floor as per relevant IS codes.
(i) Pakur variety
1.91
3956
7555.96
... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor
4.05
682
2762.1
... More
Brick work with 1st class bricks in cement mortar (1:6)
(a) In foundation and plinth
4.59
4966
22793.94
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor)
(i) With 1:6 cement mortar
(a) 15 mm thick plaster
80.88
144
11646.72
... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
Cement 0.152 cu.m per100 sq.m.
80.88
34
2749.92
... More
Labour charges for fitting and fixing 150 mm dia. Alfa Alfa valve with 160 mm dia P.V.C riser pipe with the help of flanged P.V.C Tail piece by joining the P.V.C End of Tail Piece and riser pipe with coupler and flanged end of tail piece and Alfa Alfa Valve with rubber insertion, nuts and bolts etc. complete.
7
112
785.47
... More
Repairing of leakages in collar joints of R.C.C. Pipe line by opening the joints fully by chipping out the old morter, cleaning the pipe recesses and collar properly, and thereafter positioning and levelling the pipes and collar, filling the annual spaces of joints with jute braiding dipped in cement slurry and grouting with (1:2) cement morter mixed with approved quality water proofing compound (5% by wt. of cement) and curing all complete as per direction of Engineer-in-Charge.
-
-
-
... More
(a) 450 mm dia. R.C.C. Pipe.
32
118
3801.92
... More
c) 225 mm dia
55
67
3733.95
... More
Labour Charges for fitting, fixing and laying, where necessary of following M.S / G.I. / E.R.w. pipes and accessories (to be supplied departmentally) including transportation of the same cutting, threading, jointing and making leak-proof threaded / flanged joint at site, by using socket / rubber insertion, nuts and bolts etc. maintaining proper alignment and level - all complete - as per direction of Engineer-in-Charge
-
-
-
... More
(i)(a) 150 mm. dia. ERW pipe.
48
134
6472.32
... More
xxviii) 150mm. dia. C.I. sluice valve.
4
54
218.76
... More
(xv) 150 mm. dia. 700 mm. long ERW short piece, one end to be flanged and welded
3
243
729.84
... More
Extra Carriage @ 4% on item no. 1 to 14 except item no. 1 & 4
1
3071
3071.59
... More
GST @18% on item no. 1 to 15
1
29385
29385.38
... More
Labour welfare cess @ 1% on item no. 1 to 16
1
1926
1926.37
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements