Water Resources Development Directorate Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Water Resources Development Directorate - WRDD Tender
Civil And Construction
Excavation
Eprocure
Opening Date31 Jan 2025
Closing DateCancelled
Tender Amount₹ 32,26,577
Costs
EMD
₹ 64,532Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Niet_01 Of 2024-25 _gr. 2 (2nd Call)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WRDD_809710_1Bid Award Id
ViewTender No
NIeT_01 of 2024-25 _Gr. 2 (2nd Call)Tender Authority
Water Resources Development Directorate ViewPurchaser Address
-Website
http://http://www.wbwridd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
(I) Cement concrete with graded stone ballast (40 mm size) excluding shuttering.
In ground floor.(B) With N.B variety stone metal. (a) 1:3:6 proportion.
11.86
5971
70836.35
... More
Rubble masonry in cement (6:1) with hard dressed stones from approved quarries and clean,coares and washed sand including carriage of all materials to site. ii) In Road and Jhora work
45.68
4486
204974.97
... More
Ordinary cement concrete M-20 (mix 3:1.5:1) with graded stone chips (20mm down) excluding shuttring and reinforcement, if any, in ground floor as per IS - 456 - 2000. (ii) River bazree.
22.03
7238
159440.24
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4m. (i) Tor steel/Mild steel
1.58
75332
119025.19
... More
Hire and labour charge for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approvedthickness with required bracing for concrete slabs, beams,columns, lintels curved or staight including fitting fixing and striking out after complection of works. (upto roof of ground floor). (a) For works in foundation, basement and upto roof of ground floor/upto 4m.
303.46
400
121626.77
... More
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stoneboulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion
47.22
3964
187202
... More
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/ staging course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface]. (ii) With 1:4 cement mortar. (a) 20mm thick plaster
308.88
247
76355.14
... More
Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc.
288.88
40
11786.3
... More
Supplying, fitting and fixing G.I. pipes of ISI make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc.complete in all respect including cost of necessary fitting as required, jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the center line measurements of total pipe line including all specials. No seperate payment will be made for accessories, specials.). For exposed work.
d) (ii) 40 mm dia. medium quality
900
420
378432
... More
e) (ii) 50 mm dia. medium quality
600
540
324432
... More
g) ii) 80 mm dia. medium quality
1060
807
856310.4
... More
Supplying, fitting and fixing Gunmetal wheel valve of approved brand and make tested to 21 kg. per sq. cm.( for water lines only). ii) 80 mm
2
5591
11182
... More
iii) 50 mm
2
2277
4554
... More
iv) 40 mm
3
1590
4770
... More
v) 25 mm
20
778
15560
... More
Supply of G .I. Short piece of Tata make ( above 50 mm & upto 150 mm long). (i) 80 mm
4
299
1198.08
... More
ii) 50 mm
6
120
725.76
... More
iii) 40 mm
15
97
1468.8
... More
iv) 25 mm
40
70
2803.2
... More
Installation of M.S. Angle Support for water transmission line with C.C. block all complete.
45
1934
87030
... More
S/F/F Black Granite plaque including engraving of the scheme details as per direction of Engineer-in- Charge all complete
2
3848
7696
... More
S/F/F Display Board (size 1200mm X 750mm) made with M.S. Sheet supported on Angle Frame including painting and lettering all complete as per direction of Engineer-in - Charge.
1
16640
16640
... More
GST 18 % =
1
487316
487316.63
... More
GESS 1 % =
1
31946
31946.31
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements