Water Resources Development Directorate Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Water Resources Development Directorate - WRDD Tender

Works
Civil And Construction
Excavation
Irrigation Work
Eprocure
Opening Date21 Dec 2023
Closing Date6 Jan 2024
Tender Amount₹ 38,56,471 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bailing out water by pump including all leads and lifts and including making all arrangements for disposal, where continuous flow or seepage of water is encountered and rating of pumps and hours of operation is specifically ascertained as per direction of the Engineer-in-charge.

811.19

18657

23

... More
Supplying ,loading ,unloading Class NP 2 RCC spun pipe as per specification including freight charges A) 30 cm bore dia , 2.5 m length.

8

14920

1865

... More
Supplying ,loading ,unloading Class NP 2 RCC collar as per specification including freight charges A) 30 cm bore dia

7

2065

295

... More
Laying of R.C.C. pipe with collar, lowering the same into the trench laying on the bed in trenches in prescribed gradient, depth and alignment, filling the end grooves with necessary bitumastic compound,filling caulking space with tarred gasket or with rubber gasket of appropriate size & covering with cement mortar (1:2) & testing the joints etc. complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in-charge. 30 cm dia.

20

3360

168

... More
Supplying, fitting and fixing including transportation of sign board for identifying the exact location of scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm x 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding and writting of both sides of Sign board. Base - Yellow, and words - Red. Both bottom end of the stands pipe will be grouted in 1:2:4 CC on a single brick flat soling. This will include one materials and labour complete as per drawing and direction of E.I.C.

1

3677

3677.51

... More
Excavation of Canal :-Earth work in Excavation in ordinary soil / mixed soil i.e. clay mixed with moorun, kankar, pebbles / silt dry or moist / slushy silt / sticky soil for WDS / WHS / RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment! disposal site within all lifts and lead upto 1000 m including spreading, leveliing disposed spoils at disposed area.

3852

377496

98

... More
Bailing out water by pump including all leads and lifts and including making all arrangements for disposal, where continuous flow or seepage of water is encountered and rating of pumps and hours of operation is specifically ascertained as per direction of the Engineer-in-charge.

303.75

6986

23

... More
Supplying ,loading ,unloading Class NP 2 RCC spun pipe as per specification including freight charges A) 30 cm bore dia , 2.5 m length.

10

18650

1865

... More
Supplying ,loading ,unloading Class NP 2 RCC collar as per specification including freight charges A) 30 cm bore dia

9

2655

295

... More
Laying of R.C.C. pipe with collar, lowering the same into the trench laying on the bed in trenches in prescribed gradient, depth and alignment, filling the end grooves with necessary bitumastic compound,filling caulking space with tarred gasket or with rubber gasket of appropriate size & covering with cement mortar (1:2) & testing the joints etc. complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in-charge. 30 cm dia.

25

4200

168

... More
Pilling Work:- Supplying 15 cm av. Dia Eucalyptus bullah pile at work site including dressing and making one end pointed.

1070

232190

217

... More
Labour for driving of 15 cm av dia. Eucalyptus bullah pile by monkey in all sorts of soil including hoisting and placing piles in position , protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliance and all tackles.

669

70245

105

... More
Supplying, fitting and fixing with iron nails half split Eucalyptus bullah walling piece and cross piece etc. complete with cost of all materials and carriage to site. (a) width of thiner end above 10 cm and less than 15 cm.

368

38272

104

... More
Cutting bullah by saw at level desired by EIC and marking the same by paint and stacking the same upto 60 m lead and all lifts complete.Bullah of dia upto 15 cm .

368

4784

13

... More
Fitting , fixing bitumen drum sheet to bullah pilling and walling piece including cutting straightening drum sheet fixing with country nails @ 20 cm c/c at top & bottom and bolts & nuts at top & bottom at every point of drum sheet with a laping of 15 cm , including supplying of drum sheet fixture all complete as direction of the EIC.

120

52440

437

... More
Coal tarring with 5 % pitch including cost of materials and labour complete as per direction of the EIC.

646

35530

55

... More
Construction Ghat:- Earth work in excavation of foundation trenches or drains in all sorts of soil ( including mixed soil but excluding laterite and sand stone), including removing, spreading, or stacking the spoils, as directed and including trimming the sides of trenches, levelling, dressing and ramming the bottoms, bailing or pumping out water etc.as required complete .Depth of excavation not exceeding 1.5 mtrs &lead upto 15 m.(not requiring shoring).

17.88

2132

119.27

... More
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidated the same by through saturation with water ramming complete including the cost of supply of sand.

3.88

1455

375.21

... More
Single brick flat soling of picked Jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

9

3096

344

... More
Ordinary Cement Concrete (1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, as per relevent IS codes.

13

81636

6279.75

... More
Hire & labour charges of shuttering with centering and necessary staging upto 4 mtrs using approved stout props & thick hard wood planks of approved thickness with required bracing for concrete slabs, bems, columns, lintels curved or straight including fitting fixing and striking out affer completion of works(upto the roof of ground floor).25mm to37.5mm thick wooden shuttering.

82.08

26347

321

... More
Reinforcement for reinforced concrete work in all sorts of structure including distribution bars, stirrups, binders etc. including supply of rods, initial straightening of bend bars excluding coil bars and removal of loose rust (if necessary) cutting to requisite length, hooking, bending to correct shape, placing in proper position and binding with 1.626 mm (16 SWG) black annealed wire at every inter section complete as per drawing and direction including cost of wire upto 1st floor level.

9.18

55082

6000.3

... More
Plaster (to wall, floor,ceilling etc) with sand and cement morter including rounding off or chamfering corners, as directed and racking out joints or roughening of concrete surface including throating, nosing and drip course as necessary at ground floor. (a) with (1:6) cement morter. (i) 20 mm.thick plaster.

46.44

7198

155

... More
Neat cement punning about 1.50mmthickin wall dado, floor, drain, door and window sill etc.complete.

46.44

1578

34

... More
Earth work in filling in foundation trenches or plinth with good earth in layer not exceeding 15 cm. Inlcuding watering & ramming etc. layer by layer complete with earth obtained form excavation of field channel.

5.96

462

77.54

... More
Construction of Pipe Culvert :- Earthwork in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite and sand stone), including removing, spreading or stacking the spoils, within a lead of 75 m as directed.The item includes necessary trimming the sides of trenches, levelling,dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1500 mm.

72

8587

119.27

... More
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below foundation trenches.

67

1608

24

... More
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidated the same by through saturation with water ramming complete including the cost of supply of sand. FINE SAND

31.6

18947

599.61

... More
Ordinary Cement Concrete (1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, as per relevent IS codes.

55.93

320784

5735.98

... More
Hire and labour charges for shuttering with centreing and necessary staging upto 4 metre using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs.....itting, fixing and striking out after completion of works .

142.1

50729

357

... More
Hire & labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus piling, strutting etc.) complete as per direction of the EIC for foundation excavation .

27

9909

367

... More
Supply and fitting of uPVC pipes of 50 mm dia (6kgf/cm2) for weep hole.

16.2

1008

62.23

... More
Earth work in filling in foundation trenches including all complete. Quantity 1/3 of earth work of foundation trenches

36

2791

77.54

... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design in Double RowProviding and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in double row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD(E) 900 mm dia

15

76245

5083

... More
Providing and laying boulders apron on river bed for protection against scour with stone bouldersweighing not less than 40 kg each complete as per drawing and Technical specification.Boulder Laid Dry Without Wire Crates.

18.14

21986

1211.8

... More
Add GST for hole work value @18% or as applicable as per Govt. rule.

3235837.43

582450

0.18

... More
Add Labour well fare Cess @1% of Gross Bill Value

3818288.17

38182

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.