Water Resources Development Directorate Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Water Resources Development Directorate - WRDD Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date2 Sep 2024
Closing Soon21 Oct 2024
Tender Amount₹ 73,18,713 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in gravel / moorum / kankar / compact moorum /very much weathered rock / sticky soil mixed with moorum or ghooting for WDS / WHS / RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1000 m including spreading , leveliing disposed spoils at disposed area. ( mode of measurement : pre work and postwork)

21686.4

2450563

113

... More
Excavation in soft weather rock / solt laterite rocks for WDS / WHS/RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1000 m including spreading, leveliing disposed spoils at disposed area. (mode of measurement : pre work and post work)

10843.2

1463832

135

... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete Depth of excavation not exceeding 1,500 mm.

152.1

18140

119.27

... More
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)

22.78

13498

592.57

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

119.51

35135

294

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes With local hard blackstone variety chips (crusher broken)

30.57

128944

4218

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25 mm to 30 mm thick wooden shuttering without staging in foundation.

101.82

20669

203

... More
Brick work with 1st class bricks in cement mortar (1:6) In foundation and plinth

15.98

71989

4505

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface] 20 mm thick plaster With 1:4 cement mortar

174.2

30136

173

... More
Neat cement punning about 1.5 mm. thick in wall dado, floor, drain, door and window sill etc. complete.

174.2

5922

34

... More
Suppplying RC spun pipe (NP2) and matching collar as per specition including loading, unloding carriage and stacking properly at site as per instruction of Engineer in charge inclusive of all taxes.

-

-

-

... More
600 mm dia pipe

25

32900

1316

... More
600 mm collar

8

3520

440

... More
300 mm dia pipe

25

13250

530

... More
300 mm collar

8

1888

236

... More
Labour charge for laying, fitting and fixing in position RC spun pipe (NP2) with collar in canal banks, roads, including caulking the joints of collars as when and necessary with cement mortar (prop. 1 : 2) jute and bitumen etc. as approved including preparing sub-grade, curing including cost and carriage of sand, cement etc. complete (excluding cost and carriage of pipes and collars from Departmental stack yard).

-

-

-

... More
600 mm dia pipe

25

3400

136

... More
300 mm dia pipe

25

1875

75

... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis ofmeasurement of finished quantity of work) With earth obtained from excavation of foundation

9.42

730

77.54

... More
Construction of display board made with 250mm thick 1st class brick work in cement mortar (4:1) of size 1500mmx1200mm,foundation consisting of 150mm thick sand filling below the jhama brick flat soling,13mm thick(4:1) both side cement plaster up to G.L, painting with best quality synthetic enamel paint of approved make & brand including painting block letters & digits(Size above 4 cm & up to 5cm) with black japan or any approved paint as per direction of E.I.C in accordance with supplied specific approved drawing including necessary earth work in excavation in all sorts of soil,filling in foundation with earth in all respect with all costs of labour and materials.

1

6665

6665

... More
Add GST for hole work value @ 12% or as applicable as per Govt. rule.

6441637

772996

0.12

... More
Add Labour well fare Cess @1% of Gross Bill Value

7214633.44

72146

0.01

... More
Performing activities for Institutional Development by formation and subsequent strengthening of registered WUA through creation of mass awareness and capacity building amoung them to achieve success and sustainability of Sub-Project. (Annexure -I for Details of activities and releated cost thereof enclosed as additional document) . Including all Taxes

1

31933

31933.33



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.