Water Resources Development Directorate Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Water Resources Development Directorate - WRDD Tender
Electrical and Electronics
Solar Installation and Products
Eprocure
Opening Date25 Mar 2025
Closing Soon7 Apr 2025
Tender Amount₹ 14,88,135.63 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 29,800Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WRDD_829983_5Tender No
WBWRIDD/EE(AI) /e NIT- 23 / RIDF XXX / Jhargram / 2024-25Tender Authority
Water Resources Development Directorate ViewPurchaser Address
-Website
http://http://www.wbwridd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
HDPE Bend with coupler 90 degree (63mm)
4
280
1120
... More
HDPE End Plug (63mm)
8
118
944
... More
HDPE 63mm service saadfe
36
435
15660
... More
End Riser Pipe 3/4 " diameter x 100 cm
36
197
7092
... More
Sprinkler Nozzles Full Circle (1.7 to 2 8 Kg/cm2)2050 LPH
36
691
24876
... More
Solar Module: Supply, transport, installation and commissioning of ISI marcked as per IS 14286 and IEC 61853(1), 61730(1&2), 61710 certified Solar Module of Multicrystaline/ Monocrystalline/ Monocrystalline PER/ bifacial cell with minimum efficiency of 15 % and fill factor more thamn 70 %, laminated between sheet of - Ethylene Vinyl Acetate (EVA) & high transmissivity .2/4.0 mm tempered glass, framed in anodized aluminium frame. The power out put of individual PV modules used in the PV array, under STC, should be a minuimum of 300 watt peqak, with adequate provision for measurement tolerance . Modules supplied with the SPV system should have warranty for output wattage, whicdh should not ne less than 90% at the end of 10 years and 80% at the end of 25 yerars. Necessary ntest certificate also to be supplied. g) For 2 HP Off-grid Solar Water Pumping System with Polycrystalline SPV modules- 2150-2400Wp.
8800
32
284152
... More
Module Mounting Structure ( For 1HP, 2HP, 3HP,5HP,& 10HP Solar Water Pumping System): Supply, transport & instrallation of GI manual tracking structure made of MS hollow section, pipes, plates, angles etc as perb IS 1161/1239, 1079/2062, to hold min 300 Wp SPV Module as per drawing and specification of MNRE. The steel structure is to be proctected with minimum 80 micron galvanisation (Hot Dip) and provided with fixed arrangement or dual axis manual tracking arrangement for three times in a day and seasonal tilting are to be regulated to face the sun optimally.(As per requirement) The approximate weight of the Module Mounting Structure given in Clause no. 5.1 should be followed
1000
157
157000
... More
Foundation of Module Mounting Structure: Suitable and stable Reinforceed Cement Concrete foundation for dual axis manual tracking SPV Module structure as per drawing. a) For 4 module structure
4
11519
46076
... More
Power Conditioning unit with enclouser:
Supply , transport , installation and commissioning of Solar Power conditioning Unit consisting of following components and features: 1) Variable frequency Drive with inbuilt MPPT, voltage range suitable for operating pump-motor set of 1HP to 20 HP, detail mentioned in in Cl.6.1
2) Power input : DC source for 1HP, 2HP and 3HP.
3) Power input : AC / DC source or hybrid for 5HP and above.
4) Incomer: DC MCB 2 Pole 16 amp upto 5 HP, 25 amp for 7.5HP and 10 HP, 40 amp for 15 to 20 HP as per IS/IEC 60947-2
5) Incomer: AC MCB 4 pole 16 amp for 5.0 HP, 25 amp for 7.5HP and 10 HP, 40 amp for 15 to 20 HP as per IS/IEC 60947-2 6) Type II DC SPD of 40 KA. 7) Type II AC SPD of 40 KA for AC/ DC or Hybrid input. 8) Dual input (solar/Grid) 25 amp changeover switch for 5HP and 7.5 HP, 40 amp for 10 HP, 63 amp for 15 to 20 HP 9) Reverse protection diode 1600 VDC with heat sink.
10) Data Logger.
11) Remote monitoring system.
12) Should have built –in EMC filters .
13)IP 65 glands for cable in and out. 14) Min. IP 54 enclosure. For detail features, protections, RMS, Communication architecture, Security, Data storage, tolerance of various parameters, standards to be qualified, etc. please refer to Cl. 6.1 of technical qualification. Note: AC SPD, AC MCB and Selector switch to be provided only for item no. 3(g), to 3(l).
4
32097
128388
... More
Cable and Accessories: Supplying, fitting and fixings of UV rated Copper Cable laid inside HDPE conduit and other accessories as per followings with necessary connection with the Solar PV Module, MPPT etc.
i. 4.0 Sq mm single core multi studs - 5m(for 1HP/2HP/3HP) & 20m(for 5/7.5/10/15/17.5/20 HP)
ii. Lugs, HDPE Pipe, Flexible Pipe, Saddle, Cable tie etc
b) For 2 or more structure per structure with 9m distance between sturctures.
4
3434
13736
... More
Earthing: Earthing with 50mm dis GI pipe 3.64mm thick* 3.04Mts. Long and 1*4 SWG GI (Hot DIP) wire (4Mts. Long), 13 mm dia* 80mm long GI bolts, double nuts, double washers incl. S& F 15 mm dia GI pipe protection (1mts. Long ) to be filled with bitumrn partly under the groubnd level and partly above driven to anaverage depth of 3.64 Mts. below the ground level as below.earth Electrode and filled & reemaining and connecting to individual structure to earth electrode including S&F 20 mm * 3 mm galvanised (Hot DIp) MS flat on wall/ floor with GI saddles as requireed and connection to equipments incl. drilling holes, with bolts, nuts, washers etc.
4
2661
10644
... More
Connecting the equipments to earth busbar including S & F GI (Hot Dip) wire of 8 swg on wall/floor with staples buried inside wall/floor as required making connection to equipments with bolts,nuts, washers, cable lugs etc. as required and mending good damages
80
13
1040
... More
a) Lighting system at scheme : (with lighting pole): Dusk to Dawn lighting arrangement of at 4 mts height above ground level, with Hot Dip galvanised 80 mm * 50 mm, medium duty pipe, with 12 v , 15Ah 2-in-1 Lithium ion/Ferro-Phosphate battery with in-built 7-11 watt LED lamp, 50Wp solar panel to cover the scheme area. The lighting system should be warranted for 5 years from the date of installation.
4
19030
76120
... More
a) Lighting protection (Pole mounted): Lighting protection with 1.5" G.I pipe of 4mts + 0.75 mts height with base flange in proper RCC foundation and S & F Lighting Conductor Air Terminal made of 20 mm dia 1000 mm long GI pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot dip) wire at top duly soldered with 7/16 stranded GI(Hot dip) wire and 85 mm dia 6 mm thick GI base plate at bottom incl. necessary holes etc. Earthing with 65 mm thick GI base plate (Medium) 3.0 Mts. long and 1 *19/10 stranded GI (Hot dip) wire (4 mts. long) , 20 mm dia * 125 mm long galvanised bolt, double nuts, double washers including socketing at both ends of stranded GI (Hot Dip) wire by crimping sockets/ thimbles and S & F 65 mm dia GI pipe (ISI-Medium) protection (3 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts. (Provision of one lightning protection for each structure)
4
6725
26900
... More
Supply and installation of 3 phase electomotor pump-motor set suitable for solar operation covering 5 years warranty for the following conditions including loading, unloading , transportation ete : a) 2 HP ISI marked as per IS 9079 surface mounted Monoblock pump-motor set with 2.60-2.78 Lps discharge at 26 mts. Total head suitable for 2.0 Ha CCA sprinkler/ Drip operation with foot valve, required quantity of flexible suction pipe (15m), clamps, bend, footvalves and all other accessories to complete connection of suction and delivery side.
4
28284
113136
... More
Testing and commissioning of scheme after completion of all work.
4
2000
8000
... More
a) Supply, fitting and Fixing of Pump-motor shed of height 0.85 m (as per drawing) with Hot dip Galvanised ISA 25X25X3 & 1.5mm MS sheet including foundation Base of 0.95m X 0.65m for Pump unit (BFS, 0.75 mm 1:2:4 PCC, 100mm 1:1:5:3 CC)- For 2HP and 3HP surface pump.
4
4965
19860
... More
Comprehensive maintenance charges for 5 years (which cover monthly inspection, Yearly training to WUA, to attend breakdown within 3 days and to keep the scheme in operation without lapse of time) b) For 3 HP both for Submersible & Surface pump.
Note: 1 Total Comprehensive maintenance charge is to be withheld in addition to Security Deposit. Comprehensive maintenance charges will be released @ i) Rs 0.80 for 2 HP, ii) Rs. 0.80 for 3 HP, iii) Rs. 0.60 for 5 HP 7 10 HP submersible & surface per Wp per year at the end of each maintenance period i.e. at the end of 1st year, 2nd year, 3rd year, 4th year, & 5th year. In case the "Bidder" does not provide service during the warranty & comprehensive maintenance period, the amount so held up will be forfeited.
8800
4
35200
... More
Insurance @ 2% for item No. 2.01, 2.04, 2.08, and 2.1 for a period of 5 years. Note:2 1st year's insurance charge is to be paid on production of Original Receipt of premium payment. Remaining 4 years Insurance payment is to be withheld which will be released during 2nd, 3rd, 4th & 5th year on production of Original Receipt of premium payment.
601796
-
12035.92
... More
Remote monitoring for 5 years: Provision for remote monitoring for the pumps must be made in the pump controller through an integral arrangement having following basic functions:
a. Controller must be assigned with a unique serial number and its live status must be observed remotely on online portal through login credentials.
b. Live status must indicate whether controller is ON/ OFF. The parameters i.e. the water output, water flow rate, in fault condition, array input voltage/ current, power and motor frequency should at logged at an interval of 10 minutes c. Controller must have a back up to store the data locally ( at least for 1 year) supply & installation of GSM/GPRS based Data Transmitter or Modem and to provide remote monitoring service to transmit the parameters to central server from the solar pumping system with time stamp at user-defined interval and report generation at the buyer end. (Refer Technical Spec.)
4
21850
87400
... More
Cleaning and washing of modules once in a month with clear water to remove deposited dust and dirt on the module surface and keep the modules clean throughout the year. The activity to be performed for eight months in a year excluding four monsoon months. A log book should be maintained at thr site for the said purpose.
160
300
48000
... More
Supplying fitting and fixing including transprtation of sign board for identifying the exact location of MINI RLI scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm * 600 mm and fitted and fixed on 50 mm GI pipe of IS 1239/90 (part-1) including cutiing, welding LS and writing of both sides of sign board. Base-yellow, and words-Red. Both bottom end of the stands pipe will be grouted in 1: 2: 4 CC on a single brick flat soling. This will include one materials and labour complete as per drawing and direction of E.I.C
1
3677
3677.51
... More
Add GST @ 18% or as applicable as per Govt. rule.
1248645.43
-
224756.18
... More
Add Labour well fare Cess @1% of Gross Bill Value
1473401.61
-
14734.02
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%