Water Resources Development Directorate Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Water Resources Development Directorate - WRDD Tender

Works
Civil And Construction
Eprocure
Opening Date20 Sep 2024
Closing Date24 Oct 2024
Tender Amount₹ 24,40,162 
Notes
Download

Costs

Summary

Installation Of Solar-operated Mini Rli Scheme At Bhutkura-ii ( Mouza- Bhutkura, Jl No.- 52 And Plot No.-7415 ) In Dinhata-i Block.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
110 mm. dia P.V.C. pipe class-II ( with a loose matching coupler,class-II) marking IS No. 4985/ 1988 with latest amending with free solvent cement.

12

3408

284

... More
Supply of 160 mm OD, Class - Il Rigid PVC Pipes conforming to IS:4985 / 2000 ( with latest ammendments) and duly ISI marked with 1 (one no. loose coupler conforming to IS:10124/2009 part-2 ) 1988 duly ISI marked for every 6 m. Length, required Solvent Cement for each pipe as per IS: 14128/1994 ( with latest ammendments ) up to the destination point inclusive of all charges.

72

45432

631

... More
Coupler(Cl-II) for 140 mm. dia P.V.C. pipe ( extra) I.S. 10124/1988, Part- II with free solvent cement.

11

1430

130

... More
Coupler(Cl-II) for 110 mm. dia P.V.C. pipe ( extra) I.S. 10124/1988, Part- II with free solvent cement.

50

3350

67

... More
110mmx110mmx 110 mm. P.V.C. Tee with free solvent cement, IS 10124/2009 Part-5(Class-II)

9

3123

347

... More
140mmx140mmx 140 mm. P.V.C. Tee with free solvent cement, IS 10124/2009 Part-5(Class-II)

3

2136

712

... More
140x 110 Reducer(cl-II) with free solvent cement. IS 10124/2009 Part-3 with latest ammendment

4

1132

283

... More
140 mm. dia 90 degree bend (cl-II) ( IS. No. 10124/ 88 Part- 8 with latest amendment )

2

1294

647

... More
110 mm. dia 60 degree bend(cl-II) ( IS. No. 10124/ 88 Part- 8 with latest amendment )

2

756

378

... More
110 mm. dia 90 degree bend(cl-II) ( IS. No. 10124/ 88 Part- 8 with latest amendment)

17

6426

378

... More
140 mm. dia IS. NO. 10124/ 88 Part- 4 with latest amendment End cap.

1

330

330

... More
110 mm.dia IS.NO.10124/88 Part-4 with latest amendment.PVC End Cap.(Cl-III)

2

460

230

... More
110 mm. dia ( IS. No 10124/88 Part- 6 with latest amendment) F.T.P.(Cl-II)

9

2790

310

... More
140 mm. dia ( IS. No 10124/88 Part- 6 with latest amendment) F.T.P.(Cl-II)

2

924

462

... More
160 mm. dia ( IS. No 10124/2009 Part- 6 with latest amendment) F.T.P.(Cl-II)

3

2010

670

... More
ISI marked P.V.C.Flexible Hose pipe as per IS 15265 - 100 mm dia

20

15480

774

... More
Solvent cement extra (Medium duty)

5

2125

425

... More
G.I. Tripod Set and Inlet & Outlet Pipe Fittings (As per drawing)

1

202000

202000

... More
100 mm dia G.I E.R.W. Pipe with flange as per IS 1239 (Part-I)/2004 & 6392/1971, table 17 Specification.

12

29688

2474

... More
150 mm dia G.I E.R.W. Pipe with flange as per IS 1239 (Part-I)/2004 & 6392/1971, table 17 Specification.

12

45600

3800

... More
Supply of 150 mm dia C.I. Sluice valve with Hand wheel for water work as purpose confirming to ISI : 14846/2000 with latest ammendments. Parts of the valve shall be manufacture from basic materils and the valves should be tested for (Closed end test ) against Hydrostatic test requirement.

2

19900

9950

... More
100 mm dia C.I. Sluice Valve I.S.I. 14846/2000 Amd No. 1&2 mark and specification PN- 1.6 sluice valve .

2

12600

6300

... More
Supply and transportation of 100 mm dia Alfa Alfa type Valve as per the following technical Specifications and drawing:- 1.Spindle (Sq RH Thread) -S.S(410) 2.Top Cover:-G.I with 6 Nos Nut and Bolt 3.Body:-C.I( Grey FG 200,IS:210/78) 4.Galnd,Valve Seat:FG 200 The valve to be painted with one coat of Red Oxide primer and two coats of black japan paint.

9

29700

3300

... More
80X65mm M.S. flanged reducer.

2

598

299

... More
100X80mm M.S. flanged reducer.

4

7424

1856

... More
Foundation Bolt for Drop Pipe of Distribution Chember& engine manufactured from 20 mm nominal diameter M.S Rod as per IS 2062/1992. Total length of Bolt is 375+10 mm in length & 20 mm in nominal diameter with Nut & 2 Nos Washer (As per Anexure-E) theaverage weight of such Bolt. 1.5 Kg per bolt with tolerance in weight of each Bolt @ +/-10%.(Drop Pipe) & 1 kg for engine)

14

3220

230

... More
G.I Hexagonal Head Bolts & Nuts conforming to IS : 1363 (Part-I)/ 1992 of product Grade-C with latest amendments for Bolts & IS: 1363 (Part-3)/ 1992 of Product Grade-C with latest amendments for Nutrs Properties / class for Bolt - 4,6 & for Nut-4.5.

-

-

-

... More
M-20 X 80 mm

45

9000

200

... More
M-20 X 100 mm

8

1600

200

... More
M-16 X 65 mm

38

7600

200

... More
M-16 X 80 mm

10

2000

200

... More
M-16 X 50 mm

16

3200

200

... More
Foot valve leather washer 100mm dia.

2

400

200

... More
100 mm Dia Heavy Duty Hose (G.I ) Clamp,2 mm thickness,30mm width (I.S: 5612/1977 with latest ammendment).

20

1860

93

... More
Compresed Asbestos fibre jointing for Quadruped & Tripod set ( for raised surface of Flange as per IS-6392) 300mm.dia(Table-5).

2

1664

832

... More
Supply & transport of Rubber Insertion 5 mm thick with proper reinforcement 2 ply conforming to IS: 638/79 with ISI mark with latest ammendments suitable for raised surface of MS Flange as per IS: 6392/71 (Table-5,11 &17).

-

-

-

... More
150 mm dia Ruber Insertion(Table-17)

18

3420

190

... More
150 mm dia Ruber Insertion(Table-5)

8

1520

190

... More
100 mm dia Ruber Insertion(Table-17)

21

1575

75

... More
80 mm dia Ruber Insertion (Table-17)

11

660

60

... More
125mm dia Ruber Insertion (Table-17)

2

330

165

... More
65 mm dia Ruber Insertion (Table-17)

2

116

58

... More
Supply of 150mm dia. G.I 90 Degree MS bend both end flanged conforming to IS 1239(Part-2)/2011and Galvanization as per IS 4736 with latest amendments thereof (4.8mm thick wall thickness) .

4

32700

8175

... More
3C X 4 sqmm copper cable conforming to IS 694 .

3

717

239

... More
2 X 3C X 2.5 sqmm copper cable conforming to IS 694 in 25 mm GI conduit (ISI-Medium quality).

10

3260

326

... More
Supply of 80 mm dia C.I. Sluice valve with Hand wheel for water work as purpose confirming to ISI : 14846/2000 with latest ammendments. Parts of the valve shall be manufacture from basic materils and the valves should be tested for (Closed end test ) against Hydrostatic test requirement. .

1

4800

4800

... More
Installation of Solar Photovoltaic Installation for Water Pumping System of Solar MINI RLI Scheme

-

-

-

... More
Solar Module: Supply , transpot , installation and commissioning of ISI marked Solar Modules as per following specification: 1. Cell : Indigenous mono crystalline silicon SPV cells 2. Solar Module : Monocrystalline cell with PERC technology / module with bifacial cell . 3. Standards ISI marked as per IS 14286 and having certification of IEC 61853(1), 61730(1&2), 61710. 4. Modules must qualify to IS 170210 (Part 1) 5. Min. Efficiency : 19.5% . 6. Fill factor : More than 75% . 7. Module wattage mismatch in the SPV array within + 3% 8. Wattage output warranty : should not be less than 90% at the end of 10 years and 80% at the end of 25 years . 9 . The power output of individual PV modules used in the PV array , under STC : minimum 300 Wp , Necessary test certificates also to be supplied . For detail information please see CI. no 2.1 of technical specification . d)For 5 HP Off-grid/On-grid Solar Water Pumping System with Monocrystalline/ Monocrystalline PERC/ Bifacial SPV modules(5400-5800)Wp - 5400 Wp. (2 X 6 X 540 + 2 X 4 X 540 ) Wp.

10800

348732

32.29

... More
Power conditioning unit with enclosure : Supply,transport,installation and commissioning of Solar Power conditioning Unit consisting of following components and features:- 1)Variable frequency Drive with inbuilt MPPT,voltage range suitable for operating pump-motor set of 1HP to 20HP, detail mentioned in Cl.6.1 2) Power input :DC source for 1HP, 2HP and 3HP. 3) Power input : AC / DC source or hybrid for 5HP and above. 4) Incomer: DC MCB 2 Pole 16 amp upto 5HP,25 amp for 7.5HP and 10HP,40 amp for 15 to 20HP as per IS/IEC 60947-2 5) Incomer: AC MCB 4 pole 16 amp for 5.0 HP,25 amp for 7.5HP and 10HP,40 amp for 15 to 20 HP as per IS/IEC 60947-2 6) Type II DC SPD of 40 KA. 7) Type II AC SPD of 40 KA for AC/ DC or Hybrid input. 8) Dual input (solar/Grid) 25 amp change over switch for 5HP and 7.5 HP, 40 amp for 10 HP, 63 amp for 15 to 20 HP 9) Reverse protection diode 1600 VDC with heat sink. 10) Data Logger. 11) Remote monitoring system. 12) Should have built –in EMC filters 13) IP 65 glands for cable in and out. 14) Min. IP 54 enclosure. For detail features, protections, RMS,Communication architecture, Security,Data storage, tolerance of various parameters,standards to be qualified, etc.please refer to Cl. 6.1 of technical qualification. d) For 5 HP capacity Pump-motor set with DC input.

2

113764

56882

... More
Module Mounting Structure ( For 1HP, 2HP, 3HP, 5HP and 10HP Solar Water Pumping System): Supply, transportation & installation of G.I Manual tracking made of MS hollow sections, pipes, plates, angles etc as per IS: 4923, IS: 1161/1239, IS: 1079/2062, to hold min 300 Wp SPV Module as per drawing and technical specification of MNRE. The steel structure is to be protected with minimum 80 micron galvanisation(hot dip) and provided with dual axis manual tracking arrangement for three times in a day and seasonal tilting are to be regulated to face the sun optimally. The weight of the Module Mounting Structure holding 4 Modules should not be less than 280 Kg, holding 6 Modules should not be less than 350 Kg.

1260

197820

157

... More
Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concrete foundation for dual axis manual tracking SPV Module structure as per approved drawing. a) For 4 Module Structure:2 Nos b) For 6 Module Structure:2 Nos.

-

-

-

... More
For 4 Module Mounting Structure

2

21058

10529

... More
For 6 Module Mounting Structure

2

25502

12751

... More
Cable and Accessories: Supplying, fitting and fixings of UV rated Copper Cable laid inside HDPE conduit and other accessories as per followings with necessary connection with the Solar PV Module, MPPT etc. i. 4.0 Sq mm single core multi studs - 5 m (for 1HP/2HP/3HP) & 20 m (for 5HP/7.5HP/10HP/15HP/17.5HP/20HP) ii. Lugs, HDPE Pipe, Flexible Pipe, Saddle, Cable tie etc. b)For 5 HP Per Structure.

4

13736

3434

... More
Earthing: Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below: By lSI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S & F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipments incl. drilling holes, with bolts, nuts, washers etc.

4

10644

2661

... More
Connecting the equipments to earth busbar including S & F GI (Hot Dip) wire of 8 swg on wall/floor with staples buried inside wall/floor as required and making connection to equipments with bolts, nuts, washers, cable lugs etc. as required and mending good damages.

80

1040

13

... More
a) Lighting System at Scheme: (with lighting Pole) : Dusk to dawn lighting arrangement of at 4 mts height above ground Level with Hot Dip Galvanized 80 mm x 50 mm, medium duty pipe, with 12 V, 15Ah 2-in-1 Lithium ion/ Ferro- Phosphate battery with in-built 7-11 watt LED lamp, 50 Wp solar panel (Minimum 19 % Efficiency) to cover the scheme area. The lighting system should be warranted for 5 years from the date of installation.

1

19030

19030

... More
b) Lightning protection (Pole mounted): Lightning protection with 3" X 1.5" G.I pipe of 6m + 1 m height with base flange in proper RCC foundation and S & F Lightning Conductor Air Terminal made of 20 mm dia 1000 mm long GI pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mm dia 6 mm thick GI base plate at bottom incl. necessary holes etc. Earthing with 65 mm dia GI pipe (Medium) 3.0 Mts. long and 1 x 19/10 stranded GI (Hot Dip) wire (4 Mts. long), 20 mm dia x 125 mm long galvanized bolt, double nuts, double washers including socketing at both ends of stranded GI (Hot Dip) wire by crimping sockets/ thimbles and S & F 65 mm dia GI pipe (ISI-Medium) protection (3 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts. including connection to earth electrodes with 25 X 6mm G.I strip. (Provision of one lightning protection for each scheme as per drawing)

2

21366

10683

... More
Supply and installation of 3 phase AC electromotor pump-motor set with speed of 3000r.p.m (synchronous speed) suitable for Solar applications and shall have 60 months guarantee for the following conditions including loading,unloading, transportationetc.:-(Refer technical specification for more detail) d) 5 HP ISI marked 3 phase 415 V Pump-Motor set having discharge at required head as below:- i) Monoblock Surface Pump-motor set ISI marked as per IS: 9079 for mini RLI scheme with discharge of 13.8 LPS at 18 mts. total head with 100 mm dia. reinforced PVC suction pipe (20 m) and delivery pipe (10 m), foot valve, nipple, priming bend, Cable and all other required accessories to complete connection of suction and delivery side.

2

124812

62406

... More
Testing and commissioning of scheme after completion of all work.

2

4000

2000

... More
Comprehensive maintenance charges for 5 Years (which cover monthly inspection, Yearly training to WUA, to attend breakdown within 3 days and to keep the scheme in operation without lapse of time) c) For 5 HP both for Submersible & Surface pump Note: Total comprehensive maintenance charge is to be withheld in addition to Security Deposit. Comprehensive maintenance charges will be released @ i) Rs. 0.80 for 2 HP, ii) Rs. 0.80 for 3 HP, iii) Rs. 0.60 for 5 HP/ 7.5 HP/ 10 HP/ 15 HP/ 17.5 HP and 20HP Submersible & Surface per Wp per year at the end of each maintenance period i.e.at the end of 1st year,2nd year, 3rd year, 4th year & 5th year. In case the "Bidder" does not provide service during the warranty & comprehensive maintenance period, the amount so held up will be forfeited.

10800

32400

3

... More
Insurance @ 2% for Item No.2.01, 2.02, 2.08 & 2.10 for a period of 5 years. Note: Item 1st year's Insurance charge is to be paid on production of Original Receipt of premium payment. Remaining 4 years Insurance payment is to be withheld which will be released during 2nd, 3rd ,4th & 5th year on production of Original Receipt of premium payment.

1

12126

12126.76

... More
Supply fitting and fixing of Hot dip Galvanised ( min 80 micron) / Powder Coat painted/ Galvanized M.S Kiosk Box / Stainless Steel Kiosk of SS304 of 800(L) X 500(W) X 650(H) and total height with legs is 950 mm (above ground) including foundation (as per drawing) for mounting of motor-pump set including transportation,- For 5 HP Surface Pump.

2

28314

14157

... More
Remote monitoring for 5 years : Provision for remote monitoring for the pumps must be made in the pump controller through an integral arrangement having following basic functions:a.Controller must be assigned with a unique serial number and its live statusmust be observed remotely on online portal through login credentials.b.Live statusmust indicate whether controller is ON/OFF.The parameters i.e.the water output,water flow rate,in fault condition,array input voltage/current,powerand motor frequency should at logged at an interval of 10 minutes c.Controller must have abackup tostore thedata locally(at least for1year),D.supply& installation of GSM/GPRS based DataTransmitteror Modem and to provide remote monitoring service to transmit the parameters tocentral server from the solar pumping system with time stamp at user-defined interval and report generation at the buyer end.

1

21850

21850

... More
Extra rate for transportation @ 2% for item no. 2.01,2.03 as applicable

546552

10931

0.02

... More
Add GST @18% on sl. No.2.01 to2.16 ( Solar)

1007125.8

181282

0.18

... More
Add Labour Welfare Cess @ 1% on sl. No.2.01to 2.17 ( Solar)

1188408.44

11884

0.01

... More
Laying Water Transmission Arrangement of Solar Mini RLI Scheme.

-

-

-

... More
Earth work in excavation of field trenches as per designed section & allignment for laying of pipe lines (PVC, RCC, ACP etc) upto a depth of 1500 mm in all sorts of soils including removing spreading or stacking extra earth as directed. The item includes necessary trimming of sides trenches, levelling, dressing and ramming the bottom as required complete.

874.03

86537

99.01

... More
Laying of PVC pipes of different diameters within field trenches in curve/ straight line including using UPVC fittings, Viz. Horizontal and Vertical Bends, riser pipes, Tee Reducer etc.and making leak proof joints with couplers after roghening the surface with wire brush and emery paper and applying solvent cement (The rate is inclusive of transport of pipesfittigs and solvent cement to be supplied by deptt.) all complete asper direction of Engineer-In- charge

-

-

-

... More
i)140 mm. dia

263

2666

10.14

... More
ii)110 mm. dia

1224

10673

8.72

... More
iii)160 mm. dia

74

750

10.14

... More
Single brick flat soling of picked Jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand.

46.52

14979

322

... More
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand.

3.5

1509

43131

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. B) River Bazree.

15.17

61726

4069

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.

73.19

24006

328

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m. (i) Tor steel/Mild Steel. II) JSW/JSPL/SHYAM/SRMB/BMASL/ELECROSTEEL/SSL.

0.07

4534

64243

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor) [Excluding cost of chipping over concrete surface]. (ii) With 1:4 cement mortar.(b) 15 mm thick plaster.

99.34

15596

157

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.

99.34

3377

34

... More
Earth work in filling in trenches after laying pipelines (PVC, RCC, ACP etc) with good earth obtained from excavation of field trenches in layers not exceeding 225 mm, including watering & ramming etc. Layer by Layer complete. (Payment will be made on the basis of measurement of finished quantity of work)

841.38

55539

66.01

... More
Erection, fitting, fixing of set of M S Tripod inlet and outlet pipe fittings for Mini RLI Scheme.(Rate inclusive of transportation from departmental store to work site).

1

12466

12466.74

... More
Labour charges for fitting, fixing 110 mm dia Alfa-Alfa valve with 140 mm dia class-II, UPVC riser pipe with the help of FTP (flanged tail piece) by joining the PVC end of the tail piece and riser pipe with coupler and flanged end of tail piece Each and Flap valve with rubber insertion, nuts and bolts etc complete.(Rate inclusive of transportation from departmental store to work site).

9

975

108.44

... More
Testing of pipe line system against leakage by fillinh the distribution chamber with water and supplying water through the entire pipe line net work for atleast 4 (Four) hours including hiring and transport of suitable generstor , pump , tools and plants, fuel and lubricants and installation of the pump connecting the same with pipe line network making necessary electrical connection and dismantling all these after completion of test all complete as per direclion cf Engineer -in - Charge. For MINI RLI.

1

2494

2494.1

... More
Labour charges for fitting, fixing (150 x 140) mm dia M S reducer with 140 mm dia UPVC pipe with the help of FTP (flanged tail piece) by joining the PVC end of the tail piece and 140 mm dia UPVC pipe with coupler and flanged end of tail piece and expander with rubber insertion, nuts and bolts etc. complete. (Rate inclusive of transportation from departmental store to work site).

2

216

108.44

... More
Supplying, fitting and fixing including transportation of sign board for identifing the exact location of MINI RLI scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm × 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding and writting of both sides of Sign board. Base - Yellow, and ward Red. Both bottom end of the stands pipe will be grouted in 1:2:4 CC on a single brick flat soiling. This will include one materials and labour complete as per drawing and direction of EIC.

1

3677

3677.51

... More
Supplying 1 m × 0.6 m × 24 swg MS board containing list of spout wise water users by making numbers of spout as directed by EIC. The board should have base colour - Black and words - White to be fitted and fixed on the wall of the pump house.

1

942

942.95

... More
Labour Charges for fitting, fixing and laying, where necessary of following M.S / G.I. / E.R.W. pipes and accessories (to be supplied departmentally) including transportation of the same cutting, threading, jointing and making leak-proof threaded / flanged joint at site, by using socket / rubber insertion, nuts and bolts etc. maintaining proper alignment and level - all complete - as per direction of Engineer-in-Charge.

-

-

-

... More
xxviii)100mm /150mm. dia. C.I. sluice valve.

5

273

54.69

... More
(i)(b) 100 mm dia. NB ERW/MS Pipes

12

990

82.51

... More
(i) 150 mm. dia. ERW pipe.

12

1618

134.84

... More
Extra rates carriage 4% allowed for allexcept item no 3.01,3.10&3.13

160983.08

6439

0.04

... More
Add GST @18% on sl. No.3.01 to 3.18 ( WTA)

311993.7

56158

0.18

... More
Add Labour Welfare Cess @ 1% on sl. No.3.01 to 3.19 ( WTA)

368152.57

3681

0.01

... More
Institutional Development & Capacity building of Water Users Association of Solar Mini RLI Scheme

-

-

-

... More
Campaigining in the command area of Mini RLI Sub-project by community workers for mass awareness,capacity building to achieve sustainability of Sub-projects.Cost include wage payment to community workers,transportation,leaflet etc. Note- Charge of campaigning is to be paid on production of good quality of photograph of thecampainging with beneficiaries

2

5200

2600

... More
Demaracation of Command arae,selection of beneficiaries and preparation of land schedule within the command area of one Mini RLI having CCA 20Ha

1

3500

3500

... More
Meeting Cost for WUA formation,cost including Refreshment,Training materials,transport local conveyance,wage payment to community worker,renumeration to resource person and incidental charges

1

3000

3000

... More
Registration Cost for WUA under suitable act(Society) deed writing including registration charges,Conveyance Costs & Opening of Bank A/C etc

1

1200

1200

... More
Livelyhood plan / Micro plan formulation cost for minor irrigation scheme, cost including refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charge (rate on meeting). One training immediately after formation of WUA & remaining 03 nos training from each season Kharif, Aman & Rabi). Note: Charge of 1st training is to be paid on production of attendence sheet of the training, remaining 3 nos training charges will be released after completion of 1 year with security deposit on production of attendence sheets of remaining 3 nos training. In case the "Bidder" does not provide service during the maintanance period, the amount so held up will be forfeited.

4

12000

3000

... More
Meeting and Onsite demonstration for operation & maintenance of one Mini RLI water management and mode of Collection of Water Tax,building of Corpus Fund etc

2

6000

3000

... More
IEC Materials (Leaflet,poster,notebook)=8 meetings for Sl No4.0 2 and Sl -4.04

55

1925

35

... More
Documentation Cost for activities of WUA Scheme by still photography,report booklet etc in both hard and Soft Copy

1

1000

1000

... More
Impact study & monitoring of scheme by site visit of 2 Community Workers during 3 years period Note:- charges of all impact study and monitoring to be withheld in addition to security deposit and will be released after completion of the 03 year.

8

9600

1200

... More
Add GST @18% on sl. No.4.01 to 4.09 ( WUA)

1

7816

7816.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.