Water Resources Development Directorate Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Water Resources Development Directorate - WRDD Tender
Water Storage And Supply
Eprocure
Opening Date1 Jan 2021
Closing Date18 Jan 2021
Tender Amount₹ 12,75,091 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 46,400Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction Of Kanchdahari Water Harvesting Tank
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_WRDD_311955_11Bid Award Id
ViewTender No
WBWRIDD/EE(AI) /eNIT-11/ RIDF-XXVI /MID/2020-21Tender Authority
Water Resources Development Directorate ViewPurchaser Address
-Website
http://http://www.wbwridd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying RCC pipe with spigot socket. 600 mm dia.
40
-
2258
... More
Labour for loading RCC pipe into trucks, carts etc. at lifting point & unloading the materials at destination point & stacking the same in stackyard or go-down as per direction including carriage within a lead of 100 m (or part thereof) at each end.
40
-
35.83
... More
Carriage of R.C. pipe over pucca road upto 5 Km distance.
40
-
35.36
... More
Laying RCC pipe NP3 with spigot socket on first class bedding of grannular materials in single row including fixing with cement mortor 1:2 as per tchnical specification.
40
-
382
... More
Supplying, fitting and fixing including transportation of sign board for identifying the exact location of scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm x 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding and writting of both sides of Sign board. Base - Yellow, and words - Red. Both bottom end of the stands pipe will be grouted in 1:2:4 CC on a single brick flat soling. This will include one materials and labour complete as per drawing and direction of E.I.C.
1
-
3677.51
... More
Construction of Pucca Ghat : - Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixd soil but excluding lterite and sand stone), including removing, spreding or stcking the spoils as directed and including trimming the sides of trenches, levelling, dressing and ramming the bottoms, bailing or puming out water etc. as required complete. Depth of excavation not exceeding 1.5 mtrs & lead up to 15 . (not requiring shoring).
62.28
-
119.27
... More
Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consoidated the same by trough saturtion with water ramming complete including the cost of supply of sand.
13.53
-
375.21
... More
Single Brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
32.4
-
344
... More
Ordinary cement concrete (1:1.5:3) wih graded stone chips ( 20 m nominal size) excluding shuttering and reinforcement if any, as per relevent IS code.
43.56
-
5035
... More
Hire & Labour charges of shuttering with entering and ncessary staing upto 4 mtrs. Using approed stout props & thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works ( upto the roof of ground floor). 25 mm to 37.5 mm thick wooden shuttering.
244.14
-
321
... More
Reinforcement for reinfored concrete works in all sorts of structure including distribution brs, stirrups, binders etc. Including supply of rods, initial straightening of bend bars excluding coil brs and removal of loose rut (if necessary) cutting to requisite lenght, hooking, bending to correct shape, placing in proper position and binding with 1.626 mm (16 SWG) black annealed withe at every inter section ccomplet as per drawing and direction including cost of wire upto 1st floor level.
34.2
-
5336.8
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and racking out joints or roughening of concrete surface including throating, nosing and drip course as necessary at ground floor. With 1:6 cement mortar 20 mm thick plaster.
115.71
-
155
... More
Neat cement punning about 1.50 mm thick in wall dado, floor, drain door and window sill etc. Complete.
115.71
-
34
... More
Earth work in filling in foundation trenches or plinth with good earth in layer not exceeding 15 cm. Including watering & ramming etc. Layer by layer complete with earth obtained from exavation of field channel.
20.76
-
77.54
... More
Add GST for hole work value @ 12% or as applicable as per Govt. rule.
2049458.41
-
0.12
... More
Add Labour well fare Cess @1% of Gross Bill Value
2295393.41
-
0.01
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements