Water Resources Development Directorate Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Water Resources Development Directorate - WRDD Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date14 Dec 2023
Closing Date26 Dec 2023
Tender Amount₹ 12,78,957
Costs
EMD
₹ 26,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_WRDD_621379_1Bid Award Id
ViewTender No
WBWRIDD/EE(AI)/PD/eNIT - 09/2023-24Tender Authority
Water Resources Development Directorate ViewPurchaser Address
-Website
http://http://www.wbwridd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
HDPE Tee with coupler (63 mm)
4
1472
368
HDPE Bend with coupler 90 degree (63mm)
4
1000
250
HDPE End Plug (63mm)
8
844
105.5
HDPE 63mm service saddle
36
13968
388
End Riser Pipe 3/4" diameter x 100 cm
36
6336
176
Sprinkler Nozzles Full Circle (1.7 to 2.8 Kg/cm2) 2050 LPH
36
22212
617
1 No. Clustered (2) 2HP Solar Photovoltaic Pumping System with Surface Pump
-
-
-
Solar Module: Supply, transport, installation and commissioning of ISI marked as per IS 14286 and IEC 61853(I), 61730(1&2), 61710 certified Solar Module of Multicrystaline/Monocrystalline/ Monocrystalline PERC/bifacial cell with min. efficiency of 15% and fill factor more than 70%, laminated between sheet of -Ethylene Vinyl Acetate (EVA) and high transmissivity 3.2/4.0 mm tempered glass, framed in anodized aluminium frame. The power output of individual PV modules used in the PV array, under STC, should be a minimum of 300 Watt peak, with adequate provision for measurement tolerances. Modules supplied with the SPV system should have warranty for output wattage, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. Necessary tesc certificate also to be supplied.
For 2 HP Off-grid Solar Water Pumping System with Polycrystalline SPV modules - 2150- 2400 Wp.
9100
269906
29.66
Module Mounting Structure ( For 1 HP, 2HP, 3HP, SHP and 10 HP Solar Water Pumping System): SvppIy, transportation & installation of G.I manual tracking structure made of MS hollow sections, pipes, plates, angles etc as per IS 1161/1239, 1079/206t, to hold min 300 Wp SPV Module as per drawing and specification of MNRE. The steel structure is to be protected with minimum 80 micron ga!vanisation (hot dip) and provided with fixed arrangement or dual axis manual tracking arrangement for three times in a day and seasonal tilting are to be regulated to face the sun optimally. (as per requirement)
The approximate weight of the Module Mounting Structure given in Clause no.5.1 should be followed.
1060
153700
145
Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concrete foundation for dual axis manual tracking SPV Module structure as per approved drawing.
For 7/8 module structure.
4
50800
12700
Power conditioning unit with IP54 enclosure :
Supply , transport , installation and commissioning of IP 54 protected enclosured Inverter Unit qualifying IEC 61683-Efficiency measurement and IEC 600682-Environment Standard , safety standard suitable for 3 Phase A.C. motor, IGBT based high voltage switching inverter with MPPT technology, to take care of the variation of Sun light and will be suitably mounted inside the metal enclosure. Inverter should have protection against Dry run, Over current, Under current, Over voltage, Under voltage, Short circuit etc. System should be able to run at low sunshine and minimum 7 to 8 hours a day run should be possible during normal sunshine. Inverter should have option to auto start for any short trip off due to low light/ cloudy situation except for dry run. Inverter should be provided with a display to show the various parameter by the user such as Voltage, Current, Solar panel DC voltage, Inverter IGBT temperature, Out put AC voltage, Output frequency, Pump flow (direct or calculated method), Irradiation etc . The system should be capable to store the data at a set interval and transfer it in a pendrive through USB port . It should also monitor and save total run time, total water pumped etc . There should be provision for interfacing GPRS based data transmission.
For 2 HP capacity Pump-motor set
4
128388
32097
Cable and Accessories :
Supplying, fitting and fixings of UV rated Copper Cable laid inside HDPE conduit and other accessories as per followings with necessary connection with the Solar PV Module, MPPT etc.
i. 4.0 Sq mm single core multi studs - 5 Mtrs (for 2HP) & 20 M (for 3/5 HP)
ii. Lugs, HDPE Pipe, Flexible Pipe, Saddle, Cable tie etc
For 1HP/2HP per structure
4
4536
1134
Earthing: Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below: By ISI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipments incl. drilling holes, with bolts, nuts, washers etc.
4
10644
2661
Connecting the equipments to earth busbar including S & F GI (Hot Dip) wire of 8 swg on wall/floor with staples buried inside wall/floor as required and making connection to equipments with bolts, nuts, washers, cable lugs etc. as required and mending good damages
80
1092
13.65
a) lighting System at S¢heme: (with lighting Pole) :
Dusk to dawn lighting arrangement of at 4 mts height above ground level, with Hot dip galvanised 80 mm x 50 mm , medium duty pipe, wlth 12 V, 15Ah 2-in-I Lithium ion/ Ferro- Phosphate battery with in-built 7-11watt LED lamp , 50 Wp solar panel to cover the scheme area. The lighting system should be warranted for 5 years from the date of installation.
4
76120
19030
Lightning protection |PoIe mounted): Lightning protection with 1.5“ G.I pipe of 4 mts + 0.75 mts height with base flange in proper RCC You ndation and S & F Lightning Conductor Air Terminal made of 20 mm dia 1000 mm long GI pipe (III Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot oip) wire and BS mm dia 6 mm thick GI base plate at bottom incl. necessary holes etc. Earthing with 65 mm dia GI pipe (Medlum) 3.0 Mts. long and 1 x 19/10 stranded GI {Hot Dlp) wire (4 Mtg. longj, 20 mm dia x 125 mm long galvanized bolt, double nuts, double washers including Pocketing at both ends of stranded GI (Hot Oip) wire by crimping sockets/ thimbles and S & F 65 mm b'›a GI pipe (ISI-Medium) protection (3 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts. (Provision of one lightning protection for each structure)
4
26900
6725
Supply and installation of 3 phase electromotor pump-motor set suitable for Solar operation covering 5 years warranty for the following conditions including loading, unloading, transportation etc. 2 HP ISI marked as per IS 9079 surface mounted Monoblock Pump-motor set with 2.60 - 2.78 Lps discharge at 26 mts. total head suitable for 2.0 Ha CCA Sprinkler / Drip operation with foot valve, required quantity of flexible suction pipe(15m), Clamps, bend. footvalyes and all other accessories to complete connection of suction and delivery side .
4
113136
28284
Testing and commissioning of scheme after completion of all work
4
8000
2000
Construction of Pump-motor shed oi height 0.85m(as per drawing) with Hot dip Galvanised ISA 2SX25x3 & 1.5mm MS sheec Including foundation Base of 0.95m x 0.65m for Pump Unit ( BFS, .07Smm 1:2:4 PCC, 100mm 1:1.5:3 CC) - For 2HP and 3HP surface
4
19860
4965
Comprehensive maintenance charges for 4 years beyond 1 year warranty period (which cover monthly Inspection, Yearly training to WUA, to attend breakdown within 3 days and to keep the scheme in operation without lapse of time)
For 2 HP both for Submersible & Surface pump
Note: Total comprehensive maintenance charge is to be withheld in addition to Securirty Deposit. Comprehensive maintenance charges will be released @ i) Rs 0.80 for 2 HP, ii) Rs. 0.80 for 3 HP, iiT) Rs. 0.60 for 5 HP & 10 HP Submersible & Sunface per Wp per year at the end of each maintenance period i.e.at the end of tst year, 2nd year, 3rd year, 4th year & 5th year. In case the "Bidder” does not provide servlce during the warranty B comprehensive maintenance period, the amount so held up will be forfeited.
9100
36400
4
Insurance @ 2% for Item No. 2.1, 2.4, 2.8, and 2.10 for a period of 5 years.
Note:
1st year's Insurance charge is to be paid on production of Original Receipt of premium payment. Remaining 4 years Insurance payment is to be withheld which will be released during 2nd, 3rd , 4th & 5th year on production of Original Receipt of premium payment.
587550
11751
0.02
Supplying, fitting and fixing including transportation of sign board for identifing the exact location of MINI RLI scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of site 300 mm x 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-l) including cutting, welding LS and gritting of both sides of Sign board. Base - Yellow, and words - Red. Both bottom end of the stands pipe will be grouted in I:2:4 CC on a single brick flat soling. This will include one materials and labour complete as per drawing and direction of E.I.C.
1
3677
3677.51
Add 18 % GST on Sl. No. 1 to 2.15 above
1073130.51
193163
0.18
Add 1 % Labour Welfare Cess on Sl. No. 1 to 3.00 above
1266294
12662
0.01
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements