Water Resources Development Directorate Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Water Resources Development Directorate - WRDD Tender

Works
Civil And Construction
Eprocure
Opening Date3 Oct 2024
Closing Date19 Oct 2024
Tender Amount₹ 19,88,115.28 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Construction Of 1 No. Clustered (2) Solar Operated Light Duty Tubewell (ldtw) Scheme, Up To A Depth Of 150 Mtr. With Upvc Pipe At (i) Mouza -ghorataria

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). (J) Threaded End Cap 100 mm Dia.

2

290

145.14

... More
Casing Pipes lSI marked- IS12818 g). 150 x 100 Socket (CD)

2

2938

1469

... More
Supplying, fitting and fixing G.I. cap at top. (iii) 150 mm

2

1187

593.54

... More
3C Flat water proof CU.cables lSI marked-IS 694. b) 3C X 2.5 sq. mm

110

17930

163

... More
Galv. M S Column pipe, 1S1 marked -1239, Galv- IS4736.g) 80 mm dia both end screwed & one end socketted 3m long (bottom)

30

144000

4800

... More
Supplying 80 mm dia GI plain bend with ISI mark.

2

3452

1726.34

... More
GI. Holding Clamp- IS 1239, Galv- IS4736 c) 80 mm dia

2

4370

2185

... More
C.1. Sluice Valve with hand wheel, 151marked, I.S : 14846 C) 80 mm dia

2

9600

4800

... More
P.V.C.Flexible Hose pipe, lSI marked -IS 15265 c) 100 mm dia lay Flat Hose (Non-lSI)

200

34000

170

... More
Labour for boring through any type of soil for sinking tube well of required dia. with top enlargement by rig boring system (either by reserve circulation or by direct rotary method) including hire charges and labour for rig machine, tools and plants, staging, force pumping set and making arrangement for water required for boring etc. complete and lowering of pipes, strainers, blind pipes etc. complete. (a) For depth upto 250 metre for 100 mm dia. Tube well with top enlargement of 200 mm dia.(upto 50 metre). (i) First 50 metre

100

101400

1014

... More
(ii) Next 50 metre

100

88300

883

... More
(iii) Rest 50 metre

100

105500

1055

... More
Electrologging of bore hole of different dia tubewell for locating water bearing strata and saline aquifer, if any, after conducting relevant geophysical tests. All test reports, compiled data and raw data sheets should be submitted to the Engineer-in-Charge (Cost is inclusive of all charges for equipments, labour, data aquisition & compilation of data sheets as per direction of the Engineer-incharge

2

16030

8015.08

... More
b) Supply of gravel for use as pack in tube well of 2 mm to 4 mm. size(as per IS: 4097) and gravel treatment of tubewell including screening, washing, cleaning etc. of the gravels at the site, all complete as per direction of the Engineer-in-Charge. i) For site at any district of West Bengal upto 60 km distance from quarry.

13.55

39543

2917.5

... More
Washing and development by pumping with 30 cum per hour capacity pump for a period till sand free water comes out and the discharge is about 30 cum per Each 4563.88 hour, followed by final yield test; inclusive of all tools, plants and scaffolding and Tube-well hire charge of submersible pump, generator etc. all complete.

2

9127

4563.88

... More
Supplying fitting and fixing including transprtation of sign board for identifying the exact location of MINI RLI scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm * 600 mm and fitted and fixed on 50 mm GI pipe of IS 1239/90 (part-1) including cutiing, welding LS and writing of both sides of sign board. Base-yellow, and words-Red. Both bottom end of the stands pipe will be grouted in 1: 2: 4 CC on a single brick flat soling. This will include one materials and labour complete as per drawing and direction of E.I.C

2

7355

3677.51

... More
Mobilisation charges for transporting upto site including loading, unloading of all plants, machinaries and equipments required for drilling, development and testing of Tubewells and also the cost of construction of temporary roads over field and lor, culverts, repairing existing roads and I or culverts all complete, carrying materials on head load, carts or boats as the case may be :- (i) For sites within 4 km from all weather metal road.

2

15251

7625.64

... More
Solar Module: Supply, transport, installątion and commissioning of ISI marked Solar Modules as per following specification:1. Cell: Indigenous mono crystalline silicon SPV cells 2. Solar Module: Monocrystalline cell with PERC technology/module with bifacial cell. 3. Standards: 1st marked as per IS14286 and having certification of IEC 61853(1), 61730(1&2),61710 4.ModuIes must qualify to lS170210 (Part 1)5. Min. Efficiency: 19.5%. 6. Fill factor: More than 75%. 7. Module wattage mismatch inthe SPV array: within -t3% 8. Wattage output warranty: ShouId not be less than 90% at the end of10 years and 80'Xat the end of 25 years.9. The power output of individual PV modules used in the PV array, under STC: minimum 300 Wp. Necessary test certificates also to be supplied. For detail information please see CI. no. 2.1of technical specification d) For 5 HP Off- grid Solar Water Pumping System with Monocrystalline/ Monocrystalline PERC/ bifacial SPV modules-5400-5800Wp.

11000

355190

32.29

... More
Module Mounting Structure ( For 2HP, 3HP and 5HP Solar Water Pumping System): Supply , transportation & installation of G.I manual tracking structure made of MS hollow sections, pipes, plates, angles etc as per IS:4923, IS 1161/1239, 1079/2062, to hold min 300 Wp SPV Module as per drawing and specification of MNRE . The steel structure is to be protected with minimum 80 micron galvanisation (hot dip) and provided with dual axis manual tracking arrangement three times in a day and seasonal tilting are to be regulated to face the sun optimally. The approximate weight of the Module Mounting Structure given in Technical Specification Clause no. 5.1. - For 5 HP – should be 280 kg 1 no MMS of 4 Modules ( Manual Tracking Structure) & 350 kg 1 no MMS of 6 Modules ( Manual Tracking Structure)

1260

197820

157

... More
Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concrete foundation for dual axis manual tracking SPV Module structure as per approved drawing dated 22.05.24. a) For 4 module structure.

2

19726

9863.17

... More
Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concrete foundation for dual axis manual tracking SPV Module structure as per approved drawing dated 22.05.24. a) For 6 module structure.

2

22405

11202.77

... More
Power condltlonlng unit with enclosure: Supply, transport, installation and commissioning of Solar Power conditioning Unit consisting of following components and features: 1) Variable frequency Drive with In built MPPT, voltage range suitable for operating pump- motor set of 1HP to 20HP, detailmentioned Incl.6.1, 2) Power Input: DC source for 1HP, 2HP and 3HP. 3) Power input: AC/ DC source or hybrid for SHP and above. 4) Incomer: DC MCB 2 Pole 16 amp upto 5HP, 25 amp for 7.SHP and 10HP, 40amp for 15 to 20 HP as per IS /IEC 60947-2. 5) Incomer:AC MCB 4 pole16 amp for 5.0HP, 25amp for 7.5HP and 10HP, 40 amp for ISto20HP ar per IS/I EC 60947-1. 6) Type II DC SPD of 40KA. 7) Type II AC SPD of 40KA for AC/ DC or Hybrid Input. 8) Dual Input (solar/Grid) 25amp change over switch for SHP and 7.5HP, 40 amp for 10HP, 63 amp for1S to 20 HP. 9) Reverse protection diode 1600 VDC with heat sink. 10) Data Logger. 11) Remote menltoring system. 12) Should have built-In EMC filters. 13) IP 65 glands for cable In and out. 14) Min.IP54 enclosure. For detailfeatures, protections, RMS, Communication architecture, Security, Data storage, tolerance of various parameters, standards to beq ualified, etc. please refer to CI.6.1 of technical qualification. Note: AC SPD, AC MCB and Selector switch to be provided only for itemno.3(f)to 3(I). d) For 5 HP capacity Pump-motor set with DC input

2

113764

56882

... More
Cable and Accessories: Supplying, fitting and fixings of UV rated Copper Cable laid inside HDPE conduit and other accessories as per followings with necessary connection with the Solar PV Module, MPPT etc. i. 4.0 Sqmm single core multi studs- 5m (for1HP/2HP/3HP) & 20m (for 5/7.5/10/15/17.5/20HP) ii. Lugs, HDPE Pipe, Flexible Pipe, Saddle, Cable tie etc. b) For 5 HP per structure

2

6868

3434

... More
Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below: By ISI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipments incl. drilling holes, with bolts, nuts, washers etc.

2

5322

2661

... More
a) Lighting System at Scheme: (with lighting Pole): Dusk to dawn lighting arrangement of at 4 mts height above ground level, with Hod dip galvanised 80 mm x 50 mm, medium duty pipe, with 12 V, 15 Ah 2-in-1 Lithium ion/ Ferro- Phosphate battery with in-built 7-11 watt LED lamp, 50 Wp solar panel (min19% Eff.) to cover the scheme area. The lighting system should be warranted for 5 years from the date of installation.

2

38060

19030

... More
a) Lightning protection (Pole mounted): Lightning protection with1.5"G.I pipe of 4 mts+ 0.75mts height with base flange in proper RCC foundation and S&F Lightning Conductor Air Terminal made of 20mm dia 1000 mm long GI pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire attopduly soldered with 7/16 strandedGI (Hot Dip) wire and 85 mm dia 6mm thick GI base plate at bottom Incl. necessary holes etc.Earthing with 65 mm dia GI pipe Each (Medium) 3.0 Mts. long and 1x19/ 10 stranded GI (Hot Dip) wire (4Mts. long), 20 mm dia x 125 mm long galvanized bolt, double nuts, double washers Including socketing at both ends of stranded GI (Hot Dip) wire by crimping sockets/ thimbles and S & F 65 mm dia GI pipe (ISI-Medium) protection (3Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts.(Provision of one Iightning protection for each structure)

2

13450

6725

... More
Supply and installation of 3 phase AC electro motor pump-motor set with speed of 3000 r.p.m (synchronous speed) suitable for Solar applications and shall have 60 months guarantee for the following conditions Including loading, unloading, transportationetc.:- ( Refer technical specification for more detail ) d) 5 HP 3 phase AC Pump-Motor set having discharge at required head as below:- iii) Submersible Pump-motor set for LDTW with external part made of stainlesss teel of grade 30d or higher as per I56911 and IS3444, with discharge of 7.5 Lps- 5.83 Lps at 30 mts.-35 mts. total head with cable (3m), cover plate, Socket,Flanged Nipple,Rubber Insertion, Nuts & bolts and all other accessories including transportation of Bend, Column Pipes, cable, Set sluire valve, lay flat hose pipe etc. from Deptt.Store to site within t00 km.The pump motor should be tested as per IS8034: 2O08 (thlrd revision)

2

92678

46339

... More
Testing and commissioning of scheme after completion of all work

2

4000

2000

... More
Comprehensive maintenance charges for 5 years (which cover monthly inspection, Yearly training to WUA, to attend breakdown within 3 days and to keep the scheme in operation without lapse of time) a) For 2 HP both for Submersible & Surface pump Note:l Total comprehensive maintenance charge is to be withheld in addition to Securirty Deposit. Comprehensive maintenance charges will be released @ i) Rs 0.80 for 2 HP, ii) Rs. 0.80 for 3 HP, iii) Rs. 0.60 for 5 HP/ 7.5/ 10HP/ 15HP/ 17.5HP and 20HP Submersible & Surface per Wp per year at the end of each maintenance period i.e. at the end of 1st year, 2nd year, 3rd year, 4th year & 5th year. In case the "Bidder" does not provide service during the warranty & comprehensive maintenance period, the amount so held up will be forfeited.

11000

33000

3

... More
Insurance @ 2 % for Item No.1, 4, 7, and 9 for a period of 5 years. Note:2 1st year's Insurancecharge is to be paid on production of Original Receipt of premium payment. Remaining 4 years Insurance payment is to be withheld which will be released during 2nd, 3rd ,4th & 5th year on production of Original Receipt of premium payment.

599692

11993

0.02

... More
Add GST @ 18% or as applicable as per Govt. rule.

1296785.74

233421

0.18

... More
Add Labour well fare Cess @1% of Gross Bill Value

1530207.17

15302

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.