Water Resources Development Directorate Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Water Resources Development Directorate - WRDD Tender
Civil And Construction
Eprocure
Opening Date28 Jan 2021
Closing Date12 Feb 2021
Tender Amount₹ 7,90,804 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 16,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_WRDD_320586_1Bid Award Id
ViewTender No
WBWRDD/EEAM/CNS/eNIT-42/20-21Tender Authority
Water Resources Development Directorate ViewPurchaser Address
-Website
http://http://www.wbwridd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. (a) upto 150 mm. Thick.
4.86
-
939
... More
Earth work in filling in trenches after laying pipe lines (PVC,RCC,ACP etc.) with good earth obtained from excavation of field trences in layer not exceeding 225 mm , including watering & ramming etc. layer by layer complete. (payment will be made on the basis of measurement of finished quantity of work)
432
-
99.01
... More
Laying of P.V.C. pipes of different diameters within field trenches in curve / straight line using P.V.C. fittings, viz. Bend, Tee, Reducer etc. and making leak-proof joints with couplers after roughening the surface with wire brush and emery paper and applying solvent cement (The rate is inclusive of transport of pipes, fittings and solvent cement to be supplied by Deptt.) all complete as per direction of Engineer-in-Charge. b) 200 mm dia
300
-
10.84
... More
c) 140 mm dia
420
-
10.14
... More
Earth work in filling in trenches after laying pipe lines (PVC,RCC,ACP etc.) with good earth obtained from excavation of field trences in layer not exceeding 225 mm , including watering & ramming etc. layer by layer complete. (payment will be made on the basis of measurement of finished quantity of work)
416.12
-
66.01
... More
Earth work filling in foundation or plinth by Silver sand in layers not exceeding 150 mm as directed and consolidated the same by through saturation with water ramming complete including the cost of supply of sand.
105.6
-
77.54
... More
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidated the same by through saturation with water ramming complete including the cost of supply of sand.
7.2
-
951.83
... More
Single brick flat soling of picked Jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
48.16
-
357
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 metre using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of
Engineer-In-Charge.
13.28
-
334
... More
Ordinary Cement concrete (Mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement , if any, in ground floor as per relevant IS codes.(a) Pakur vareity
5.44
-
5367.5
... More
Brick work with Ist class brick in cement mortar (1 : 6) . (a) In foundation and plinth
3.15
-
5292
... More
Brick work with Ist class brick in cement mortar (1 : 6) . (a) In superstructure ground floor
9.6
-
5514
... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
16
-
722
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (c) 15 mm thick plaster.
145.6
-
144
... More
Neat cement punning about 1.5 mm. thick in wall dado,floor, drain, door and window sill etc. complete.
145.6
-
34
... More
Labour Charges for fitting, fixing and laying, where necessary of following M.S / G.I. / E.R.W. pipes and accessories (to be supplied departmentally) including transportation of the same cutting, threading, jointing and making leak-proof threaded / flanged joint at site, by using socket / rubber insertion, nuts and bolts etc. maintaining proper alignment and level - all complete - as per direction of Engineer-in-Charge. (i) 150 mm. dia. ERW pipe.
240
-
134.84
... More
Labour charges for fitting, fixing 150 mm. Dia. Alfa-Alfa valve with 140 mm. dia.P.V.C. pipe with the help of flanged P.V.C. tail-piece by joining the P.V.C.End of Tail-piece and riser pipe with coupler and flanged end of Tail-piece and Alfa-Alfa valve with rubber insertion, nuts and bolts etc. complete.
16
-
112.21
... More
Removing of Chokage due to sludge, mud, sand or any other foreign materials deposition from the underground 450/ 300 / 225/150 mm dia. R.C.C. Pipe Line with split bamboo, wire brush, coir rope etc. Along with suitable cleaning agent as necessary as per direction of E.I.C. (This item includes cost of earth cutting & back filling of trenches and required materials for cleaning but excluding the cost for taking out 1 full length of RCC Pipe by dismantling of 2 nos. of Collars & refitting the RCC pipe with new two nos. collar) (a) 450 mm dia RCC pipe
300
-
46.2
... More
Repairing of leakages in collar joints of R.C.C. Pipe line by opening the joints fully by chipping out the old morter, cleaning the pipe recesses and collar properly, and thereafter positioning and levelling the pipes and collar, filling the annual spaces of joints with jute braiding dipped in cement slurry and grouting with (1:2) cement morter mixed with approved quality water proofing compound (5% by wt. of cement) and curing all complete as per direction of Engineer-in-Charge. (a) 450 mm dia. R.C.C. Pipe
30
-
118.81
... More
(b) 225 mm dia RCC pipe
25
-
67.89
... More
Testing of pipe line system against leakages by filling the distribution chamber with water and supplying water through the entirepipe line net work for at least 4 (four) hour by running the departmental Diesel Engine pumping set, including supplying necessary fuels & lubricants and hiring and transporting tools and plants all complete as per direction of Engineer-inCharge.
1
-
4987.26
... More
Carriage charge @ 4% on all items from Sl. No-1.01 to 1.22 excluding Sl. No- 1.01, 1.02, 1.03,1.05,1.09,1.25
1
-
9204.7
... More
GST @ 12% on every item from Sl No.1.03 to 1.24
1
-
40239.95
... More
Cess @ 1% on every item from Sl. No. 101 to 1.26
1
-
7687.53