Variable Energy Cyclotron Centre Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Variable Energy Cyclotron Centre - VECC Tender
Electrical and Electronics
Eprocure
Opening Date4 Sep 2024
Closing Date27 Sep 2024
Tender Amount₹ 1,44,00,000
Costs
EMD
₹ 2,88,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_VECC_822978_1Bid Award Id
ViewTender No
VECC/MEG/ESD/AC/NIT/B-43/1442 Dated- 02/09/2024Tender Authority
Variable Energy Cyclotron Centre ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Unloading, lifting, shifting of chiller and other items at AC Plant, VECC with necessary vehicle/Crane, riggers, including ground preparation with wooden slippers etc. as per site requirement and all other tools- tackles, lifting equipment etc. Placing of new chiller with proper safety at newly constructed foundation will be part of the contractor. Details as per WS-5 &Annexure-I.
1
-
-
Proving materials, labours, tools & tackles for construction of RCC chiller foundation as per OEM suggested drawing, specification and design. Scope of work includes dismantling of existing RCC foundation [approx. size 3.5m (L) x 2.7m (B) x 1.5m (H)]. Details as per WS-5 &Annexure-I.
1
-
-
Dismantling of 350mm Ø size existing old insulated chilled water MS pipeline with valves of AC Plant as per site and direction of engineer-in-charge. Details as per WS-5.
40
-
-
Dismantling of 150mm Ø size existing old insulated chilled water MS pipeline with valves of AC Plant as per site and direction of engineer-in-charge. Details as per WS-5.
108
-
-
Dismantling of 50mm Ø size existing old insulated chilled water MS pipeline with valves of AC Plant as per site and direction of engineer-in-charge. Details as per WS-5.
25
-
-
Dismantling of 350mm Ø sizes existing old condenser water MS pipeline with valves of AC Plant as per site and direction of engineer-in-charge. Details as per WS-5.
40
-
-
Dismantling of 300mm Ø sizes existing old condenser water MS pipeline with valves of AC Plant as per site and direction of engineer-in-charge. Details as per WS-5.
18
-
-
Dismantling of 250mm Ø sizes existing old condenser water MS pipeline with valves of AC Plant as per site and direction of engineer-in-charge. Details as per WS-5.
34
-
-
Dismantling of 100mm Ø sizes existing old condenser water MS pipeline with valves of AC Plant as per site and direction of engineer-in-charge. Details as per WS-5.
15
-
-
Dismantling of MS support structure ISMB, ISMC etc. of existing chilled/condenser water pipeline of AC Plant as per site and direction of engineer-in-charge. Details as per WS-5 &Annexure-I.
4500
-
-
Fabrication of MS support/fixtures of Chilled water and condenser pipelines etc. using ISMB, ISMC, MS plate, MS angle, MS Pipe etc. confirming to IS standard as per site requirement for proper laying of the pipelines. Above mentioned material will be supplied by the contractor. Details as per WS-5 &Annexure-I.
5600
-
-
Supply of MS ERW chilled water pipes Heavy Class conforming to IS3589/IS1239, complete with all fittings, bends, elbows, support and fixtures as required ,including insulation the pipes with 50 mm thick thermal insulation of TF quality Expanded Polystyrene (Thermocole) of 24Kg/m3 density and 12 mm thick sand cement (4:1) plaster trowelled smooth good finish and painted with one coat of primer and two coat of first quality synthetic enamel paint (approved color). Details as per WS-5 &Annexure-I. Sizes: 350mm Ø x 8mm thick (min.)
50
-
-
Installation, commissioning & testing of above mentioned item 1.14
50
-
-
Supply of MS ERW chilled water pipes Heavy Class conforming to IS3589/IS1239, complete with all fittings, bends, elbows, support and fixtures as required ,including insulation the pipes with 50 mm thick thermal insulation of TF quality Expanded Polystyrene (Thermocole) of 24Kg/m3 density and12 mm thick sand cement (4:1) plaster trowelled smooth good finish and painted with one coat of primer and two coat of first quality synthetic enamel paint (approved color). Details as per WS-5 &Annexure-I. Sizes: 250mm Ø x 6mm thick (min.)
20
-
-
Installation, commissioning & testing of above mentioned item 1.16
20
-
-
Supply of MS ERW condenser water pipes Heavy Class conforming to IS3589/IS1239, complete with all fittings, bends, elbows, support and fixtures as required. Details as per WS-5 &Annexure-I. Sizes: 250 mm Ø x 6mm thick (min.)
55
-
-
Installation, commissioning & testing of above mentioned item 1.18
55
-
-
Supply of Ø 25 mm heavy-duty SS 304 ball valves for drain points confirming B.S 5351 or equivalent Indian Standard including all kinds of fittings required for installation. Drain points will be provided in the supply and return lines of chillers and condenser pipe. Details as per WS-5 &Annexure-I.
8
-
-
Installation of above mentioned item 1.20
8
-
-
Supply of Ø 12 mm heavy-duty SS 304 ball valves for purging points confirming B.S 5351 or equivalent Indian Standard including all kinds of fittings required for installation. Purging points will be provided in the supply and return lines of chillers and condenser pipe. Details as per WS-5 &Annexure-I.
8
-
-
Installation of above mentioned item 1.22
8
-
-
Supply of 350 mm Ø Gear Operated C.I/CS Taper Plug Valve( Class 150) with flange end connection, female flanges and all fittings required for installation, complete with insulation in chilled water line as specified in WS-5 &Annexure-I.:
2
-
-
Installation, testing & commissioning of above mentioned item 1.24
2
-
-
Supply of 250 mm Ø wheel Operated C.I/CS Globe Valve( Class 150) with flange end connection, female flanges and all fittings required for installation, complete with insulation in chilled water line as specified in WS-5 &Annexure-I.:
1
-
-
Installation, testing & commissioning of above mentioned item 1.26
1
-
-
Supply of 250 mm Ø Gear Operated C.I/CS Taper Plug Valve( Class 150) with flange end connection, female flanges and all fittings required for installation, complete with insulation in chilled water line as specified in WS-5 &Annexure-I.:
4
-
-
Installation, testing & commissioning of above mentioned item 1.28
4
-
-
Supply of 50 mm Ø Ball Valve SS conforming to B.S 5351 or equivalent Indian Standard including female flanges required for installation. Details as per WS-5 and Annexure-I
2
-
-
Installation, testing & commissioning of above mentioned item 1.3
2
-
-
Supply of Magnetic flow meter 250 mm Ø flange connection type to capable to measure flow in range 0-300 M3/hr. with flow indicator to be installed at the outlet pipeline of the chiller including all required fittings as specified in WS-5 & Annexure-I.:
2
-
-
Installation, testing & commissioning of above mentioned item 1.32
2
-
-
Supply of Differential Pressure Water Flow switch suitable for Ø 250 mm MS pipe including all fittings and interlocking with chiller. Details as per WS-5 & Annexure-I.
2
-
-
Installation, testing & commissioning of above mentioned item 1.34
2
-
-
Supply of Digital Industrial Pressure gauge min. satisfying range 0-10 Kg/cm2 with SS-304 U-trap and 10 mm SS-304 ball valve including all fittings as required. Details as per WS-5 & Annexure-I.
4
-
-
Installation, testing & commissioning of above mentioned item 1.36
4
-
-
Supply of Digital Industrial Temperature gauge min. satisfying range 0-40˚C with 10 mm SS-304 ball valve including all fittings as required.. Details as per WS-5 & Annexure-I.
4
-
-
Installation, testing & commissioning of above mentioned item 1.38
4
-
-
L T Panel: Design, Manufacture, testing at works, supply of panel, fabricated from MS CRCA sheet 2 mm thick for load bearing panel wall and 1.6 mm thick for non-load bearing panel wall, cubicle, extensible type, totally enclosed, dust and vermin proof suitable for indoor use having IP42 protection or better with hinged and lockable doors with closed type panel keys, suitable for use at 415 volt 3 phase & neutral 50 Hz system and to withstand a symmetrical fault level of minimum 50 KA for 1 second at 415 volt. All live accessible parts shall be shrouded and all equipment shall be finger touch proof. DMC shrouds and bus bar supports shall be used. Details as per WS-5 &Annexure-I.
1
-
-
L T Panel: Installation, testing & commissioning at site ofabove mentioned item 1.4
1
-
-
Supply of 1C, 240 Sq.mm, PVC FRLSH insulated, unsheathed, un-armored, copper flexible cable required to connect the chiller to LT panel.
20
-
-
Laying & termination of above mentioned item 1.42
20
-
-
Supply of 150 mm x 50 mm x 2 mm sizes of perforated sheet steel hot dip galvanized cable trays with 50mm x 6mm GI earth strip on both sides of the tray as per instructions of E.I.C.
5
-
-
Installation of above mentioned item 1.44
5
-
-
Remote Monitoring of all parameters, Operation & logging of data of screw chilling package from AC Plant Operator Room through RS485 communication port including all hardware & software, PC & interface cable (required from chiller to operator room within 25M) complete in all respect. Details as per WS-5 &Annexure-I.
1
-
-
On-site training of minimum 12 personnel for a period of five working days during working hours in operation of the chiller plant.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements