Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

University Of Calcutta - CU Tender

Works
Eprocure
Opening Date2 Nov 2021
Closing Date18 Nov 2021
Tender Amount₹ 13,90,140 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
50X1X.1 In 2nd Floor

5

-

2106

... More
50X1X.1 In 3rd Floor

5

-

2156

... More
50X1X.1 In 4t Floor

5

-

2206

... More
50X1X.1 In 5th Floor

5

-

2256

... More
50X1X.1 In 6th Floor

5

-

2206

... More
50X1X.1 In 7th Floor

5

-

2256

... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge Page No:-12,Item No-13,Pwd '17 40.00+(430*.02)

48.6

-

166

... More
Cleaning the concrete surface by removing dirt and debris, marking defectivelocations and removing loose concrete by careful stripping untill hard surfaceis exposed, cutting the concrete to regular shape, wire brushing the exposed surface and removing debris from site complete as per direction of the Engineer - in - Charge. Page No:-45,Item No-5,Pwd '17 430X40%

172

-

90

... More
Cleaning the exposed reinforcement preferably upto full diameter by wirebrush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymermodified anti corrosive protective coating formulated to inhibit the corrosionof reinforcement as permanufacturer'sspecification] Page No:-45,Item No-5,Pwd '17 172*20%

34.4

-

782

... More
Applying 2 coats of bonding agent with synthetic multi functional rubberemulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer's specification [Cement to be supplied by the Department] Page No:-45,Item No-8,a,Pwd '17 (same as item no-1)

432

-

88

... More
Cement concrete (1:1.5:3) with graded stone chips 5.6 mm size with hexagonal square mesh wire netting, I.R.C. fabric mesh or X.P. M. fitted and fixed after tying the existing reinforcement on concrete without distributing the same and with proper scarping and cleaning the reinforcement and disturbed concrete with wire brush etc. after applying a coat of cement including the cost of wire netting I.R.C or X. P. M. & cost of all handling and scaffolding complete as per direction of Engineer-in -charge.I)37.5 mm thick Page No:-41(19of96),Item No-33,Pwd '17(3rd corrigendum ) (same as item No-3)

172

-

593

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).With 1:3 cement mortar (a) 20 mm thick plaster Page No:-189,Item No-iii,a,Pwd '17 (3rd corrigendum ) Ground Floor: (50X1X2)+(50X1X.1)+(432/8)

159

-

205

... More
1st Floor: (50X1X2)+(50X1X.1)+(432/8)

159

-

209

... More
2nd Floor: (50X1X2)+(50X1X.1)+(432/8)

159

-

213

... More
3rd Floor: (50X1X2)+(50X1X.1)+(432/8)

159

-

217

... More
4th Floor: (50X1X2)+(50X1X.1)+(432/8)

159

-

222

... More
5th Floor: (50X1X2)+(50X1X.1)+(432/8)

159

-

227

... More
6th Floor: (50X1X2)+(50X1X.1)+(432/8)

159

-

232

... More
7th Floor: (50X1X2)+(50X1X.1)+(432/8)

159

-

237

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. In First floor Page No:-24 of 315 Item No-4,a ,pwd17 Ground Floor 50X1X.1

5

-

5460

... More
in 1st floor 50X1X.1

5

-

5480

... More
in 2nd floor 50X1X.1

5

-

5500

... More
in 3rd floor 50X1X.1

5

-

5520

... More
in 4th floor 50X1X.1

5

-

5540

... More
in 5th floor 50X1X.1

5

-

5560

... More
in 6th floor 50X1X.1

5

-

5580

... More
in 7th floor 50X1X.1

5

-

5600

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)Page No:-42 of 315 Item No-36,a,pwd17 (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. Ground Floor 50X1+(50X.1)+(1X.1X2)

55.2

-

335

... More
1st Floor 50X1+(50X.1)+(1X.1X2)

55.2

-

353

... More
2nd Floor 50X1+(50X.1)+(1X.1X2)

55.2

-

371

... More
3rd Floor 50X1+(50X.1)+(1X.1X2)

55.2

-

389

... More
4th Floor 50X1+(50X.1)+(1X.1X2)

55.2

-

411

... More
5th Floor 50X1+(50X.1)+(1X.1X2)

55.2

-

433

... More
6th Floor 50X1+(50X.1)+(1X.1X2)

55.2

-

455

... More
7th Floor 50X1+(50X.1)+(1X.1X2)

55.2

-

477

... More
Reinforcement for reinforced concrete work in all sorts of structuresincluding distribution bars, stirrups, binders etc initial straightening andremoval of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m i) Tor steel/Mild Steel Page No:-43(1of6),Item No-40,Pwd '17(10th corrigendum ) I. SAIL/ TATA/RINL Ground Floor (5X1%)X7850

392.5

-

60.58

... More
1st Floor (5X1%)X7850

392.5

-

61.06

... More
2nd Floor (5X1%)X7850

392.5

-

61.54

... More
3rd Floor (5X1%)X7850

392.5

-

62.02

... More
4th Floor (5X1%)X7850

392.5

-

62.58

... More
5th Floor (5X1%)X7850

392.5

-

63.14

... More
6th Floor (5X1%)X7850

392.5

-

63.7

... More
7th Floor (5X1%)X7850

392.5

-

64.26

... More
Supplying, fitting and fixing PVC pipes of approved make of Schedule 80(medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories,specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder batsclamps, including cutting pipes, making threads,fitting, fixing etc. complete in all respect including cost of all necessary fittings asrequired,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre linemeasurements of total pipe line including all specials. No separatepayment will be made for accesories, specials. Payment for painting willbe made seperately)Page No:-12 of 124,Item No-19,a.Pwd"17 100 mm dia

144

-

1134

... More
Applying epoxy based reactive joining agent for joining the old concrete with fresh concrete to be applied within manufacturer's specified time as permanufacturers specification. (0.4 Kg / m² of concrete surface).Page No:-45 of 315,Item No-7.Pwd"17 Same as item no-07

172

-

309

... More
Labour for taking out steel door and window frame for repairs and re-fixing the same (or replacement by new one) including mending good damages (excluding the cost of repair of damages) and applying a protective coat of paint.Page No:-113 of 315,Item No-20.Pwd"17

128

-

60

... More
Repairing steel shutter with new rivets including taking out and refixing, adjusting, welding, cleaning cutting holes, mending good damage to match with the existing one.. Page No:-113 of 315,Item No-22.Pwd"17 60X1.8X1.8

401

-

194.4

... More
Renewing steel plated or oxidised casement stay or peg stay of steel window frames including painting two coats with approved paint complete. Page No:-113 of 315,Item No-22.Pwd"17

70

-

60

... More
Renewing two point steel plated or oxidised handle of steel doors and windows as directed including painting complete. Page No:-113 of 315,Item No-22.Pwd"17

66

-

60

... More
Welding in M.S. structural work with gas or electric:weld

9

-

1000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.