The West Bengal Small Industries Development Corporation Limited Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

The West Bengal Small Industries Development Corporation Limited - WBSIDCL Tender

Electrical and Maintenance Works
Eprocure
Opening Date9 Jan 2020
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Wbsidcl/45 Elec Of 2019-20 Sl 5

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Origin : Manufactured in India

-

-

-

... More
Efficiency: = 17%

-

-

-

... More
Fill factor: = 70%

-

-

-

... More
Degradation warranty: =90% of design nominal power after 12 years, =80% of design nominal power after 25 years.

-

-

-

... More
Module frame: Non-corrosive and electrolytically compatible with the mounting structure compatible with the mounting structure

-

-

-

... More
Termination box: Thermo-plastic, IP 66, UV resistant

-

-

-

... More
Blocking diodes : Schottky type Each PV module must contain 3 nos of Bypass diodes

-

-

-

... More
Module minimum rated power The nominal power of a single PV module shall not be less than 330Wp.

-

-

-

... More
Potential Induced Degradation(PID) Test :Modules with PID testing certificate at following test conditions or better:

-

-

-

... More
a) Temperature: 65 ± 5°C

-

-

-

... More
b) Negative Voltage of 1000 volts

-

-

-

... More
c) Relative humidity: 70%

-

-

-

... More
d) Test period: 96 hours

-

-

-

... More
RF Identification tag for each solar module : Yes. Must be able to withstand environmental conditions and last the lifetime of the solar module.

-

-

-

... More
RF Identification tag data :

-

-

-

... More
a) Name of the manufacturer of PV Module

-

-

-

... More
b) Name of the Manufacturer of Solar cells

-

-

-

... More
c) Month and year of the manufacture (separately for solar cells and module)

-

-

-

... More
d) Country of origin

-

-

-

... More
e) I-V curve for the module

-

-

-

... More
f) Wm, Im, Vm and FF for the module

-

-

-

... More
g) Unique Serial No and Model No of the module

-

-

-

... More
h) Date and year of obtaining IEC PV module qualification certificate

-

-

-

... More
i) Name of the test lab issuing IEC certificate

-

-

-

... More
j) Other relevant information on traceability of solar cells and module as per ISO 9000 standard

-

-

-

... More
Power output rating :

-

-

-

... More
To be given for standard test conditions (STC). I-V curve of the sample module should be submitted.

-

-

-

... More
Compliance with standards abd codes :

-

-

-

... More
IEC 61215/ IS 14286, IEC 61730 Part 1 and 2

-

-

-

... More
Salt Mist Corrosion Testing As per IEC 61701

-

-

-

... More
Thickness : 4.0 mm minimum for 72 Cell PV Module.

-

-

-

... More
For further technical details please refer to "Technical Specification of SPV Modules" at page no.- 5 to 7 of Annexture-I

-

-

-

... More
S & I Hot dip galvanized MS Structured for mounting of about 47 nos. SPV Modules with galvanization thickness of minimum 85 micron as per following specificcaion.

1

-

-

... More
Wind velocity withstanding : capacity 200 km / hour

-

-

-

... More
Structure material : Aluminium alloy 6063-T6 with an L-angle profile size of not less than 50 x 50 x 6mm and U-profile channels of not less than 33 x 33 x 3 mm.

-

-

-

... More
Bolts, nuts, fasteners, panel mounting clamps : Stainless steel SS 304

-

-

-

... More
Mounting arrangement for RCC flat roofs : With removable concrete ballast made of pre-fabricated PCC (1:2:4), M15

-

-

-

... More
Mounting arrangement formetal sheet roofs Mounting directly on the sheet metal, ensuring stability and wind withstanding capacity, or penetrating the sheet metal and fixing to the sub-structure, ensuring that the roof remains water proof and ensuring stability and wind withstanding capacity.

-

-

-

... More
Mounting arrangement for elevated structure: The elevated structure has to be securely anchored to the supporting surface. Concrete foundation of appropriate weight and depth for elevated structure direct mounted directly on the ground bolted with anchor bolts of appropriate strength for elevated structures mounted on RCC surface.

-

-

-

... More
Mounting arrangement for ground installations: With removal concrete ballast made of pre-fabricated PCC (1:2:4), M15, assuring enough ground clearence to revent damage of the module through water, animals and other environmental factors.

-

-

-

... More
Installation: The structure shall be designed for simple mechanical on-site installation. There shall be no requirement of welding or complex machinery at the installation site.

-

-

-

... More
Minimum distance between roof edge/fence and mounting structure : 600 mm to 1000 mm as approved by EIC as per site condition.

-

-

-

... More
Access for panel cleaning and maintenance: All solar panel must accessible from the top for cleaning and from the bottom for access to the module-junction box.

-

-

-

... More
Panel tilt angle: North-south orientation with a fixed tiltangle depending on the location. The tilting angle range in Karakal will be 10.5 to 11 degrees, south facing.

-

-

-

... More
For further technical details please refer to "Technical Specification of SPV Modules" at page no.- 9 to 10 of Annexture-I

-

-

-

... More
S & Macking of necessary concrete foundation column for module mounting structure as mention below

-

-

-

... More
Ordinary cement concreate M-15 (1:2:4) with graded stonechips (20 mm) excluding suttering & reinforecement if any in ground floor as per relevant IS code.

1.98

-

-

... More
For further technical details please refer to "Technical Specification of SPV Modules" at page no.- 10 to 11 of Annexture-I

-

-

-

... More
S & F 15 KW, 3-phase, 415 VAC adjastable up to (+ 12.5%,-20% VAC), 50 Hz AC Grid-Tied Inverter of following specifications and as required nessery conection and earthing attechment . ( Make- ABB / KACO/ SMA/ THEA) having the following specification:

1

-

-

... More
Total output power (AC) : To match solar PV plant capacity while achieving optimum system effiency (DSP Band inverters to ensure higher efficiency)

-

-

-

... More
Input DC voltage range: 200V - 950V

-

-

-

... More
Maximum point (MPPT) tracking : Yes

-

-

-

... More
Number of independent MPPT inputs : Minimum 3 nos.

-

-

-

... More
RFI : To minimize the both conducted and radiated RFI emissions

-

-

-

... More
Internal Consumption Night : 1.5 Watt

-

-

-

... More
Regulation : Naximum 5% against input voltage and load variation

-

-

-

... More
Dielectric strength : 1.1 KV between input/output with ground with EMI protections & 1.5 KV between input and output

-

-

-

... More
Instrumentation : Input Voltage & Current, Output Voltage & Current , Frequency.

-

-

-

... More
Status Indication : Input, Output, Inverter (On/Trip/Fault/Off)

-

-

-

... More
Fault Indication : Visual indication with blinking super glowing LED audio

-

-

-

... More
Degree of Protection : IP65

-

-

-

... More
Cooling : Fan forced

-

-

-

... More
Power Switching : High Efficiency IGBT

-

-

-

... More
Power Control : Phase controlled pulse width modulation

-

-

-

... More
Earthing Provisions : AC bypassing to earth on Inverter and DC inputs

-

-

-

... More
Surge rating : 150% of rated output for 30 seconds

-

-

-

... More
Grid Acceptable Range : AC Voltage +/- 17%, +/- 3

-

-

-

... More
Operation AC voltage : Three phase 415 V ( + 12.5%, -20 %)

-

-

-

... More
Operating Frequency range : 47.5 - 52.5 Hz With range for grid voltage and frequency parameters

-

-

-

... More
Nominal frequency : 50 Hz

-

-

-

... More
Power factor of the inverter :. 0.98 at nominal power

-

-

-

... More
Total harmonic distortion : Less than 3 %

-

-

-

... More
Built - in Protection :i. Input over voltage ii. Reverse-polarity protection iii. Reverse current to PV array protection, over voltage, iv. Under voltage protection v. Over current vi. DC inject protection to grid vii. Over current viii. Over and under grid frequency protection ix. Anti-Islanding protection (As per VDE 0126-1-1/IERC 60255.5 or equivalent standards. Testing as per IEC)

-

-

-

... More
Operating ambient temprature range: - 10 degree C to + 60 degree C

-

-

-

... More
Humidity : 0 - 95% Rh

-

-

-

... More
No load losses : less than 1% of Rated output

-

-

-

... More
Self commutated IGBT base invertors with pulse width modulation invertor on/off Switch to be provided

-

-

-

... More
For further technical details please refer to "Technical Specification of SPV Modules" at page no.- 11 to 12 of Annexture-I

-

-

-

... More
S & Laying of sutable size of wires & Cables including Wiring materials as per following specification.For dc cable ; suitable size of tinned annealed stranderd flexible copper conductor as per IS 694 (make: Polycab / LAP / LEONY as approved by EIC).For ac cable: 1.1 KV, excellent resistance to heat, fire, oil, coil,abrasion,UVradiation,armoured /unarmoured as per requiredment stranderd flexible copper/armoured AL. pvc insulated as per following specifications. .(Make: RR Cable /polycab/havell's as approved by EIC)

1

-

-

... More
General Test & Measuring Methods - IEC 61427

-

-

-

... More
PVC insulated cables for working Voltages upto & including 1100V - IS 694/IS 1554

-

-

-

... More
PVC insulated cables for working Voltages upto & including 1100V, UV resistant for outdoor installation - IS/IEC 69947

-

-

-

... More
DC Cable

-

-

-

... More
Conductor: Tinned annealed stranded flexible copper

-

-

-

... More
Insulation: PVC

-

-

-

... More
Standard : IS 694

-

-

-

... More
Make: Polycab / LAPP / Top Solar / Nexans / Schneider or equivalent as approved by EIC.

-

-

-

... More
AC Cable

-

-

-

... More
Rated Voltage : 1.1 KV

-

-

-

... More
Construction: Excellent resistance to Heat, Fire, Oil, Cold, Water, Abrasion, UV radiation

-

-

-

... More
Type: Armored or Unarmored as per requirement

-

-

-

... More
Conductor: Stranded flexible Copper /Armored aluminum

-

-

-

... More
Insulation: PVC

-

-

-

... More
Standard: IS 1554

-

-

-

... More
Make: Polycab / LAPP / Havell’s / RR Cable or euivalent as approved by EIC.

-

-

-

... More
For further technical details please refer to "Technical Specification of SPV Modules" at page no.- 18 to 20 of Annexture-I

-

-

-

... More
S & Fixing PV Array Junction Box (AJB) IP65 withstand voltage 1000VDC, as per following specifications incl. nessery conection and earthing attechment.

1

-

-

... More
Maximum Roof space utilization : 12 sqm / kwp for true south

-

-

-

... More
Degree of Protection: IP65

-

-

-

... More
Design Factor of Safety: 1.5

-

-

-

... More
Material: Polycarbonate

-

-

-

... More
Withstanding Voltage : 1000V

-

-

-

... More
With standing Temperature : 100 degree C

-

-

-

... More
Accessories mounting arrangement : As suitable

-

-

-

... More
Number of Strings entry : As may be required

-

-

-

... More
Cable Entry and Exit

-

-

-

... More
Position : Bottom at cable entry and exit

-

-

-

... More
Cable Entry and Exit connector type : MC4(PVArray String cable)

-

-

-

... More
Cable gland : Earthing cable entry

-

-

-

... More
Fuse with fuse holder

-

-

-

... More
Position : Positive and negative terminal for each series string

-

-

-

... More
Type: Glass fuse, for PV useonly

-

-

-

... More
Rating : Current: Minimum 1.25 times the rated shortcircuit current of the series string

-

-

-

... More
Earthing Provision : Terminal blocks will have to be provided for Earthing

-

-

-

... More
The footing base of the structure should be painted by good quality (IS approved) water proofing bituminous paint.

-

-

-

... More
For further technical details please refer to "Technical Specification of SPV Modules" at page no.- 16 to 18 of Annexture-I

-

-

-

... More
S & F Grid Interfacing LT Panel / ACDB as per following specifications with Energy meter including nessery conection and earthing attechment.

1

-

-

... More
MCB

-

-

-

... More
Make : ABB / L & T / Siemens / Schneider / Havells / Crabtree or equivalent

-

-

-

... More
Type : 4 Pole

-

-

-

... More
Rating : 415V, 16A

-

-

-

... More
Bus Bar

-

-

-

... More
Rating :3 Ø with Neutral, 415V 16A

-

-

-

... More
Type : Aluminum

-

-

-

... More
Indicator : Provided

-

-

-

... More
Earthing Provision: Terminal Blocks will be provided for Earthing

-

-

-

... More
Enclosure

-

-

-

... More
Degree of Protection : IP 42/43

-

-

-

... More
Type :Sheet Steel, Powder coated. Horizontal / Vertical Enclosure dust and Vermin proof

-

-

-

... More
Type of Fixing: Wall Mounted

-

-

-

... More
Accessories mounting arrangement : DIN Rail or as Suitable

-

-

-

... More
For further technical details please refer to "Technical Specification of SPV Modules" at page no.- 15 to 16 of Annexture-I

-

-

-

... More
Earthing with 40 mm dia GI pipe (ISI medium as approved by EIC) 4.5 Mts.long and 25mm x 5 mm GI strip (Hot Dip) as a earth lead and earth continuity conductor including others accessories and providing masonary incluser with cast iron cover plate having locking arrangement,watering pipe using charcoal or coke and solt as required as per povisions of IS 3043 and nessesary provision shall be made for bolted isolating joint of each earthing pit for preodic cheeking of earth resistance.

2

-

-

... More
For further technical details please refer to "Technical Specification of SPV Modules" at page no.- 11 of Annexture-I

-

-

-

... More
S & F Lightning Conductor Air Terminal made of 20 mm dia 1000 mm long GI pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mm dia 6 mm thick GI base plate at bottom incl. necessary holes etc. complete duly grouted on the parapet etc. in CC mortar ( 4:2:1). Necessary concrete foundation for holding the lightning conductor in position to be made after giving due consideration to maximum wind speed and maintenance requirement at site in future.

2

-

-

... More
Supply & fixing GI (Hot Dip) strips 25 mm x 6 mm thick for horizontal run on the Parapet/Roof/ Wall with GI Saddles 1100 mm apart incl. mending good the damages to building works

23.2

-

-

... More
Supply & fixing of GI (Hot Dip) strips 25 mm x 6 mm thick for vertical run on wall with GI saddles spaced not exceeding 1000 mm apart incl. mending good damages to building work

10.1

-

-

... More
For further technical details of Item no.-1.09 to 1.11 please refer to "Technical Specification of SPV Modules" at page no.- 21 of Annexture-I

-

-

-

... More
Connectivity arrangement i.e; connection of net metering system as follows with local DISCOm network and cordination with DISCOm as stated below.

1

-

-

... More
For Net metering system : The existing service connection energy meter is to be replaced by th e distribution licensee with a bidirectional energy meter of the same accuracy class as the existing service connection meter. If the existing service connection meter is already programmed for bidirectional energy recording there will be no need of replacing the matter.

-

-

-

... More
Installation, Testing and commissioning including Transposition charges.

1

-

-

... More
a) Type Test Certificates shall be provided for the solar modules and the solar grid inverters to provide evidence of the complience with standards as specified this Technical Specification. Client reserves the right to ask for additional test certificates or (random) tests to establish compliance with specified standards.

-

-

-

... More
For further technical details please refer to "Technical Specification of SPV Modules" at page no.- 8 of Annexture-I

-

-

-

... More
Five (5) years Annual Maintenance as per follows.

5

-

-

... More
Preventive/Routine Maintenance : This shall include activities such as routine checking the health of the SPV Power plant, tightening of all electrical connections, changing of tilt angle of module mounting structure and any other activity that may be required for proper functioning of the SPV Power Plant as a whole. Conducting of O & M training for the technicians of customers.

-

-

-

... More
Breakdown/Corrective Maintenance : Whenever a complaint is lodged by the user, the bidder shall attend to the same within a reasonable period of time of 48hours and in any case the breakdown shall be corrected within a period not exceeding 72hours from the date of complaint.

-

-

-

... More
a) Adequately trained manpower, specifically trained by the bidder for carrying out the service activities

-

-

-

... More
b) The suppliers should provide generation data on annual basis for the initial 2 years. The security money will be released based on performance of the plant in respect of generation

-

-

-

... More
c) Adequate spares and manpower for ensuring least downtime of an individual system.

-

-

-

... More
d) Provision for Module cleaning and further technical details please refer to "Technical Specification of SPV Modules" at page no.- 24 to 25 of Annexture-I

-

-

-

... More
S & F other accessories are as follows.

-

-

-

... More
Danger Board of Size 200 mm x 300 mm

1

-

-

... More
S/I in position approved make dry chemical powder fire extinguisher of following capacity complete with chromium plated gun metal union (cap), fitted with braided hose and open nozzle with initial charge of dry chemical powder and gas cartridge complete with bracket and fixing screws. The extinguisher is internally and externally coated with lead tin alloy through hot dip process and cylinder bearing no. IS:15638/2006 and the gas cartridge bearing with ISI certification mark. Make:- Minimax/ Surex/ Deflame/ Fire Shield or approved by EIC. 5 KGS Capacity.

2

-

-

... More
S/I in position approved make carbon dioxide 4.5 Kgs capacity fire extinguisher, made of high pressure with wheel type valve with one meter long braided high pressure discharge hose which should have a minimum of bursting pressure of 14.0 N/Sqmm and fitted with ABS discharge born and handles (non- conductor), complete with bracket and steel handle on the body fully charged with ISI certification mark ISI:15638/2006. Make:- Minimax/ Surex/ Deflame/ Fire Sheild or approved by EIC.

2

-

-

... More
GI bucket as per IS, capacity 9 Ltrs filled with sand. (Fire Shield/ Minimax Make).

2

-

-

... More
For further technical details please refer to "Technical Specification of SPV Modules" at page no.- 22 to 23 of Annexture-I

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.