The Durgapur Projects Limited Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

The Durgapur Projects Limited - DPL Tender

Works
Machinery and Tools
Eprocure
Opening Date24 Feb 2024
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Boiler tube leakage repairing including necessary alignment of coils, supply of all consumables including electrodes, filler rods, S.R and radiography(100%), with supply & erection of scaffolding with material(sky-climber compatible for Unit#8 will be supplied by DPL. Erection of sky-climber is the responsibility of the party. For attending tube repairing/alignment etc, erection of scaffolding with material to be done up to roof tube as per requirement if sky-climber is not available or out of order of not approachable.), supply of T&P, casting of refractory ( up to 1 MT), manpower etc. as per requirement.(per joint)

-

-

-

... More
Water wall tube joint. (U#7 & 8)

60

-

-

... More
Economizer tube joint. (U#7 & 8)

30

-

-

... More
Roof tube joint. (U#7 & 8)

10

-

-

... More
Screen tubes/cage tubes/LTSH & Economizer Hanger Tube/Steam cooled Wall Joint (U#7 & 8)

50

-

-

... More
All Re-heater joint (U#7 & 8)

100

-

-

... More
Super heater joint(expect LTSH) (U#7 & 8)

50

-

-

... More
Division panel joint (U#7 & 8)

10

-

-

... More
Second pass enclosure wall tube joint (U#7 & 8)

80

-

-

... More
Removal, fabrication and fitting of guard tube and guard plate. (U#7 & 8)

50

-

-

... More
Coal Mill overhauling as per scope of work in annexure II(a) including all consumables ( including hard face electrode), man power, T&P, scaffolding with material, measuring instrument, re-alignment and trial run etc. (U#7 )

5

-

-

... More
Coal Mill overhauling as per scope of work in annexure III(a) including all consumables ( including hard face electrode), man power, T&P, scaffolding with material, measuring instrument, re-alignment and trial run etc. (U#8 )

5

-

-

... More
Coal mill –mini overhauling as per scope of work in annexure II (b) in case of mill internal troubles like roller jamming/ mill internal liner/ static or rotary nozzle ring replacement. (U#7)

5

-

-

... More
Coal Mill gear box as per scope of work in Annexure- II (c)- replacement including all consumables, T&P, manpower, measuring instrument, scaffolding with material, re- alignment of motor with and trial run (U#7)

1

-

-

... More
Coal Mill gear box as per scope of work in Annexure- III (b)- replacement including all consumables, T&P, manpower, measuring instrument, scaffolding with material, re- alignment of motor with and trial run (U#8)

1

-

-

... More
ID Fan runner Patch & Rebladding – necessary plate cutting & welding, hard facing, bearing checking, static balancing , alignment ( both fan & Voith coupling and motor & Voith coupling) all consumables including hard facing rod, T&P, manpower etc with trial run. (U#7&8)

4

-

-

... More
Manual cleaning of chocked A.P.H basket including ash removal, all consumables, T&P, manpower etc. on the basis of no of basket. (U#7&8)

10

-

-

... More
Coal carrier Pipe Bend replacement during Unit running/ shut down condition- erection of scaffolding with material, dismantling of bend , alignment, rectification of leakage including supply of electrode, T&P, manpower and all other consumables etc. (U#7&8)

15

-

-

... More
Coal carrier Straight Piece replacement during Unit running/ shut down condition- erection of scaffolding with material, dismantling of Straight Piece , alignment, rectification of leakage including supply of electrode, T&P, manpower and all other consumables etc. (U#7&8)

30

-

-

... More
Replacement of coal burner- Dismantling of -coal nozzle tip, P.A duct for coal burner, and coal carrier pipe attached with coal burner, reach rod arrangement. Replacement of- P.A duct, nozzle tip, diversion plate and others, alignment, T&P, manpower and all other consumables including necessary Nut and bolt with washer, gasket etc. (U#7&8)

2

-

-

... More
Repair & replacement of coal burner- Dismantling of- coal nozzle tip, P.A duct for coal burner, coal carrier pipe attached with coal burner, reach rod arrangement. Necessary cutting and grinding of coal burner. Repair of -P.A duct, nozzle tip diversion plate and others. Hard facing (hard facing electrode to be supplied by party), alignment, T&P, manpower and all other consumables including necessary Nut and bolt with washer, gasket, electrode etc. (U#7&8)

2

-

-

... More
Repairing / servicing of L.V.F.O Oil burner total assembly- Necessary cutting and replace of guide tubes,F.O diffuser cone with flexible Hose repairing/change –if reqd.,ash & Clinker cleaning, alignment, T&P, manpower and all other consumables including necessary Nut and bolt with washer, gasket, electrode etc. (U#7&8)

6

-

-

... More
Repairing / servicing of L.D.O Oil burner total assembly- Necessary cutting and replace of guide tubes,L.D.O nozzle repairing/change –if reqd.,ash & clinker cleaning, alignment, T&P, manpower and all other consumables including necessary Nut and bolt with washer electrode etc., gasket, (U#7&8)

6

-

-

... More
De-metering of boiler tubes- (U#7&8)

500

-

-

... More
P.M.I of material – per day. (U#7&8)

2

-

-

... More
Ash cleaning &tit bit repairing of pent house , dead chamber ,duct, buck stay etc during shut down/running condition as per direction of EIC. (U#7&8)

10

-

-

... More
APH gear box replacement including all consumables, Replacement of bearing, T&P, manpower, measuring instrument, scaffolding with material, re- alignment of motor with and trial run. (U#7)

1

-

-

... More
APH gear box replacement including all consumables, Replacement of bearing, T&P, manpower, measuring instrument, scaffolding with material, re- alignment of motor with and trial run. (U#8)

1

-

-

... More
Drop test for calibration of coal feeder- Dismantling/fitting coal feeder to mill inlet drop pipe, fitting/dismantling of coal carrier pipe for drop test, transportation of coal(mill to weigh bridge & weigh bridge to C.H.P. yard),preparation of chart, T&P, manpower and all other consumables including necessary Nut and bolt with washer electrode etc., gasket etc. (U#7&8)

1

-

-

... More
Repairing of Duct in different areas of Boiler. Scope of work stated in Annexure-II(D) (U#7&8)

3

-

-

... More
Assembly of roller journal assembly/RJA repairing (per roller journal basis) (U#8)

15

-

-

... More
BHEL/DEC make gravimetric coal feeder overhauling including consumable, T&P, man power etc. for removal of coal, inside thorough cleaning, servicing/replacement and complete fitting of one set feeder body liner, bunker O/L gate, feeder I/L and O/L gate, servicing/changing of belt, head pulley, tail pulley, weigh span rollers, inlet span roller, scrapper, feeder bottom plate, clean out conveyer and gear box, motor to gear box alignment for main motor, gear box oil replacement for main motor gear box and C.O.C. gear box up to trial run/changing of bottom plate, bearing and associate job (u#7 & #8)

10

-

-

... More
Replacement of APH Support Bearing with all associate work (Special jack for lifting the assembly is in party scope). (U#7) (300 MW)/ (U#8) (250 MW)

1

-

-

... More
Dismantling and lifting/pulling of LTSH module and placed in position after repairing (One module consist of two upper coil and two lower coil) of#7

4

-

-

... More
Dismantling and lifting of Economizer module and placed in position after repairing (One module consist of two upper coil and two lower coil) of#7 & #8.

4

-

-

... More
Stress relieving as per schedule (U#7&8)

2

-

-

... More
Fabrication of different size high pr bend(cold bend) (U#7&8)

25

-

-

... More
High pr welding above 100 NB and upto 150 NB diameter steam pipe at different position of (U#7 )

1

-

-

... More
High pr welding above 150 NB and upto 200 NB diameter steam pipe at different position. (U#7&8)

1

-

-

... More
Radiography of welding joints as per schedule for header area ( U#7 & 8)

1

-

-

... More
High pr. Welding above 200 NB and upto 300 NB diameter steam pipe at different position

1

-

-

... More
Replacement of feeder to mill SS drop pipe (Both Upper & Lower), dresser coupling and gasket with necessary scaffolding. Replacement/ patch work of centre feed pipe. Completion time 02 days (U#8)

6

-

-

... More
Fabrication of mill upper journal liner plate/guard plate complete set by 8 mm/10 mm MS Plate. One set is equal to 06 numbers. (Of #8)

10

-

-

... More
Reclamation of feeder outlet chute (AFTER FEEDER OUTLET GATE) by SS plate and then outside MS plate patch welding. (U#7&8)

2

-

-

... More
Reclamation of feeder to mill SS drop pipe with flange require size SS plate/pipe and then outside MS plate Patch welding. Length of each pipe 3meter. (U#7&8)

2

-

-

... More
Sky climber fitting inside the boiler for tube and burner repair work (necessary scaffolding, tools and tackle in party scope including sky clamber dismalting) (U#7&8)

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.