Technical Education And Training Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Technical Education And Training Department Tender

Goods
Laboratory Equipment and Services
Eprocure
Opening Date3 Sep 2021
Closing Date25 Sep 2021
Tender Amount₹ 35,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Study the effect of tilt angle on solar cell parameters (Voc, Isc, Vmp, Imp, Mpp, Fill factor, Efficiency)

5

-

-

... More
Assemble and Dismantle the solar PV system. 

1

-

-

... More
Set up for performance analysis of single phase bridge inverter with R-L load and voltage control by single pulse width modulation.

5

-

-

... More
Study of solar smart metering system and its troubleshooting.

5

-

-

... More
Experiment to run water pumping system using solar power.

3

-

-

... More
Solar street lighting system for DC supply.

5

-

-

... More
Identify different components of solar street lighting system for AC supply.

1

-

-

... More
Assemble the components of solar home lighting system & study the system.

3

-

-

... More
Setup to measure beam, diffuse and global radiation on horizontal and tilted surface using Pyranometer and plot radiation vs. time characteristics for certain duration.

1

-

-

... More
Datalogger

1

-

-

... More
Multimeter

10

-

-

... More
Setup for characterization of a solar flat plate collector and evaluate its parameters.

3

-

-

... More
Setup for characterization of evacuated tube collector and evaluate its parameters.

3

-

-

... More
Setup for characterization of a solar concentrating collector and evaluate its parameters.

3

-

-

... More
Setup to measure thermal performance of a solar cooker with varying reflector.

5

-

-

... More
Setup to measure the parameters of a Solar dryer.

3

-

-

... More
Setup to plot and analyse the characteristics curve of strain gauge.

5

-

-

... More
Setup to plot and analyse the characteristics curve of LVDT with distance as input.

5

-

-

... More
Setup to plot the load cell characteristics using different load as input.

5

-

-

... More
Setup to measure level of a tank using Gauge glass, Differential Pressure Transmitter.

1

-

-

... More
Setup to measure level of a tank using Displacer, Ultrasonic level meter.

1

-

-

... More
Setup to measure the flow of liquid using Rotameter, and Differential Pressure Transmitter. 

1

-

-

... More
Setup to measure the temperature using Pt100 and Thermocouple.

3

-

-

... More
Identification of different parts of C type burdon tube pressure gauge.

5

-

-

... More
Study of operation of dead weight tester and calibration of pressure gauge using it.

1

-

-

... More
Study & measure calorific value of solid fuel using Bomb Calorimeter.

1

-

-

... More
Study of different parts of Water Turbines such as Pelton Wheel, Francics and Kaplan.

1

-

-

... More
Study of schematic layout of a Hydroelectric Power Plant.

3

-

-

... More
Study of different parts of Vane pump / Gear pump generally used in Hydraulic System.

3

-

-

... More
Study the different parts of a Hydraulic Trainer System.

1

-

-

... More
Setup to determine Brake power, Indicated power, Efficiencies of Four stroke cycle Diesel Engine.

1

-

-

... More
Identify the different parts of a DC machine and make a report on it.

1

-

-

... More
Setup for speed control of a DC shunt motor below and above its rated speed.

1

-

-

... More
Identify the different parts of a single-phase transformer and a three-phase transformer (from a slide if machine is not available) & make a report on it.

1

-

-

... More
Identify the different parts of a 3-phase induction motor and make a report on it.

1

-

-

... More
Setup for No-load test and Blocked-rotor test of a 3-phase induction motor & determine equivalent circuit parameters. 

1

-

-

... More
3-phase, 5KVA, 415V VARIAC

3

-

-

... More
Setup to plot the O.C.C. of an alternator & observe the effect of excitation and speed on induced e.m.f. ii) Perform experiment to find the percentage regulation of 3-phase alternator by synchronous impedance method at various power factor and load. 

1

-

-

... More
Setup to synchronise two 3-phase alternators by –  a) Three lamp method or b) Synchroscope and to study the sharing of load between the alternators.

1

-

-

... More
Identify different parts of Permanent Magnet Synchronous Generator (PMSG) and make a report on it.

1

-

-

... More
Identify the different parts of an – a) Electromagnetic energy meter, b) Electronic energy meter make a report on it. 

3

-

-

... More
Setup to calibrate single phase energy meter using resistive or inductive loads.

3

-

-

... More
Setup to measure energy of 3- phase balanced load using Electronic Energy Meter.

3

-

-

... More
Setup to measure 3-phase power of balanced 3-phase load by 2-wattmeter method.

2

-

-

... More
Setup to measure current ratio, voltage ratio and polarity test of CT and PT.

2

-

-

... More
Set up a Small Wind Turbine (SWT) system and Identify its specified components.

1

-

-

... More
Setup to test the performance of Squirrel Cage Induction Generator (SCIG) – measurement of active and reactive power with respect to speed of SCIG and its analysis.

1

-

-

... More
Setup to test the performance of Permanent Magnet Synchronous Generator (PMSG) – a) No load test, b) Load test.

1

-

-

... More
Set up of a Anaerobic Digestion Biogas plant to i) Measure the calorific value of the Biogas. ii) Measure the yield of the Biogas changing the input parameters e.g. temperature, input raw materials. iii) Calculate the efficiency of the Biogas plant. iv) Set up of a gas cleaning system with H2S and H2O filter.

1

-

-

... More
Study the construction and operation of energy efficient lamps – CFL, LED, Fluorescent lamp.

3

-

-

... More
Setup to calculate power and energy consumed by a florescent lamp using electronic ballast and magnetic ballast.

5

-

-

... More
Setup to compare lighting energy consumption of a model room using only artificial lighting and artificial lighting integrated with natural daylighting. 

1

-

-

... More
Study the parts of a – i) Lead-Acid battery and experiment for Charging & Discharging characterization of the battery and measure its parameters.

3

-

-

... More
Study the parts of a Ni-Cd battery and experiment for Charging & Discharging characterization of the battery and measure its parameters. 

3

-

-

... More
Study the parts of a Li-ion Battery and experiment for Charging & Discharging characterization of the battery and measure its parameters. 

2

-

-

... More
Setup Connect lead-acid batteries in different connections to verify its Voltage & Ampere-hour.  

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.