Sundarban Affairs Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Sundarban Affairs Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date16 Mar 2024
Closing Date23 Apr 2024
Tender Amount₹ 30,87,978 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork in excavation In all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking A) Beyond 500 metre and upto 1.00 Km

232

50576

218

... More
B) Beyond 1.00 Km and upto 2.00 Km

174

39498

227

... More
C) Beyond 2.00 km upto 3.00 km

58

13630

235

... More
Labour for taking out brick-on-end edging including removing debris to flank or berm sorting out serviceable materials and stacking.

40

266

664

... More
Labour for taking out brick-on-edge of herring bone bond including removing debris to flank or berm sorting out serviceable materials and stacking. (b) Double brick flat soling

37

641

1732

... More
Labour for taking out old soling edging including removing debris(a) single brick flat soling.

37

363

981

... More
Box cutting in road embankment in all kinds of soil and spreading the soil uniformely over the flanks and consolidating and dressing the subgrade to correct camber and grade.

82.13

8246

100.4

... More
Labour for laying brick edging (75 mm wide) with departmental brick laid true to line and level including carriage of departmental bricks within a lead of 150 metres cutting necessary trench in soil or in hard metalled surface laying the bricks and repacking the trench (on both sides of the edging) with spoils and ramming the same thoroughly (a)single brick flat soling (250 mm. depth)

38

450

1185

... More
Brick edging 75 mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or in hard metalled surface, laying the bricks and repacking the trench (on both side of the edging) with spoils and ramming the same thoroughly complete as per direction.

18

1604

8913

... More
Labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used). (d) Soling or dry pavement with one brick-on-edge laid in herring bone pattern on a layer of brick flat (thickness 75 mm. plus 125 mm)

35.15

2577

7331

... More
Labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used). (a) single brick flat soling (75 mm thick )

1095

371205

339

... More
Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction. (f) Soling or dry pavement with one brick-on-edge laid in herring bone pattern over a layer of brick flat (thickness 125 mm plus 75 mm

20.35

18152

892

... More
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed. Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end. (i) 12.5 cm av. Diameter

1424.7

206582

145

... More
(ii) 10 cm av. Diameter

377.4

36230

96

... More
Coal tarring on wooden surfaces including cost of materials a) One Coat

658.8

14494

22

... More
Labour for fitting and fixing 10 cm to 13 cm dia Sal-bullah / Eucalyptus-bullah as ties and runners including necessary nails bolts and nuts

268

4288

16

... More
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles Note: 1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end. 2) For string staging under specific instruction of Engineer-in-charge or for driving from pontoon or boats, the rate will be enhanced by ` 4.00 per meter. 3) For driving done by pile engine set (without staging) under specific instruction of Engineer-in-charge, the rates will be enhanced by ` 4.00 per meter. 4) For driving done by pile engine set (with heavy staging or from specially made pontoon) under specific instruction of Engineer-in-charge, the rates will be enhanced by ` 7.00 per metre. (i) 12.5 cm av.diameter.

949.8

87382

92

... More
Supplying empty Cement bags in good condition

2010

6633

330

... More
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of filling materials, (Earth or sand) and gunny bags.

2010

7035

350

... More
Providing and laying nominal mix Cement concrete (with mix proportion 1:1½:3) with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm of Pakur or other approved variety including Screening and cleaning of aggregates, if necessary, both of approved quality and cement, as necessary, compacting by vibrator or other suitabfe means, cost of curing with water, cost for quality control, sampling, testing etc. and including placing a Separation membrane of impermeable PVC sheet 125 micron thick transparent or white in colour laid flat with minimum creases. Before placing the separation membrane, the sub-base shall be swept clean of all the extraneous materials. Wherever overlap of plastic sheets is necessary, the same shall be at least 300 mm and any damaged sheathing shall be replaced at the Contractor's cost, including carriage of all materials to site but excluding the cost of staging, shuttering and and reinforcement if any.

242.3

1599180

6600

... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction a) where staging is not requied

234.6

50204

214

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen by weight.

128

2560

20

... More
Fine dressing and making the crest to correct camber and gtrade by cutting and filling earth where necessary including extra earth.

468

2714

5.8

... More
Construction of Sign Board with 0.45 m X 0.60 m (height) granite slab of 15-18 mm thick. Engraving the lettering over it as directed by the E.I.C. fitting and fixing complete over brick masonary (with 4:1 cement mortar) plateform covered with 4:1 sand-cement plaster with net cement punning all complete as per direction & design supplied by the E.I.C.

1

6707

6707

... More
Add GST @ 18% (CGST+SGST)

2591020

466384

18

... More
Labour Welfare Cess @ 1%

3057404

30574

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.