Sundarban Affairs Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Sundarban Affairs Department - SAD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date5 Sep 2024
Closing Date1 Oct 2024
Tender Amount₹ 68,66,813 
Notes
Download

Costs

Summary

Wbsdb/ee/ced-iii/ Niet-06/2024-25/11

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour for laying brick edging(75 mm wide) with old or new departmental bricks laid true to line and level including carriage of bricks within a lead of 150 metres cutting necessary trench in soil laying the bricks and repacking the trench on both sides and ramming complete. b) On end edging(250mm)depth

263

3117

1185

... More
Brick edging 75 mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or hard metalied surface, laying the bricks and repacking the trench (on both sides of the edging) with spoils and ramming the same thoroughly complete as per direction. (b)Brick-on-end edging (250 mm) depth.

217

19341

8913

... More
Labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used

431

31597

7331

... More
Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction. (f)Soling with one brick on edge laid in Herring bone bond pattern over a layer of flat brick(thickness 75 mm. plus 125 mm)

485.26

432852

892

... More
Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length).

6783

196707

29

... More
Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) Where boats are not necessary.

4470

49170

11

... More
Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.)

684

15048

22

... More
Supplying empty Cement bags in good condition.

4397

14510

330

... More
Filling empty Cement Bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of filling materials, (Earth or sand) and gunny bags.

4397

15390

350

... More
Earthwork from borrowpits for making embankments or for repairs to embankment within an initial lead of 30m. And initial lift of 1.50m including breaking clods and depositing the same in layers not exceeding 25 Cm layers and rough dressing etc. complete as per profile

2907

235467

81

... More
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of B) Beyond 1.00 Km. and upto 2.00 km

820

186140

227

... More
Providing and laying nominal mix Cement concrete (with mix proportion 1:1.5:3) / M-20 grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm of Pakur or other approved variety including Screening and cleaning of aggregates, if necessary, both of approved quality and cement, as necessary, compacting by vibrator or other suitable means, cost of curing with water, cost for quality control, sampling, testing etc. and including placing a Separation membrane of impermeable PVC sheet 125 micron thick transparent or white in colour laid flat with minimum creases. Before placing the separation membrane, the sub-base shall be swept clean of all the extraneous materials. Wherever overlap of plastic sheets is necessary, the same shall be at least 300 mm and any damaged sheathing shall be replaced at the Contractor's cost. Including carriage of all materials to site but excluding the cost of staging, shuttering and and reinforcement if any

666.6

4399560

6600

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen by weight

822.5

16450

20

... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction (b) Where staging is not required

528

112992

214

... More
Fine dressing and making the crest to correct camber and grade by cutting and filling earth where necessary including extra earth

2640

15312

5.8

... More
Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.)

1

2186

2186

... More
GST as applicable - @ 18%

5761716

1037109

18

... More
Labour Welfare cess - @ 1%

6798825

67988

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.