State Water Investigation Directorate Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

State Water Investigation Directorate - SWID Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date6 Dec 2023
Closing Date15 Dec 2023
Tender Amount₹ 26,81,705 
Notes
Download

Costs

Summary

Construction Of Roof Top Rainwater Harvesting For Artificial Recharging To Ground Water Scheme At Iti Berhampur In The District Of Murshidabad During The F.y.2023-24

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour charges for fitting and fixing high density polythene pipes or PVC pipes for above ground work including cost of jointing meterials, paints etc. fitting & fixing all necessary specials, cutting pipes, making threads, cutting holes in wall or R.C. floor where necessary and mending good all damages excluding the cost of masonry or concrete work, if necessary, but including the cost and fitting and fixing holder bat clamp ( any floor) or for underground works including cutting trenches up to 1.5 metre and filling the same complete as per direction of EIC. ( payment will be made on centre line measurment of the total pipe line including specials ) i) 110 mm OD

117

6786

58

... More
ii) 160mm OD

498

37350

75

... More
iii)Under ground 160 mm OD

527

50065

95

... More
Supplying fitting fixing C.I round gratings complete 150 mm dia.

95

8075

85

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 i) Couplar 160mm OD (Class-2)

55

11990

218

... More
ii)End Cap, Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785

7

3188

455.44

... More
iii)) Equal Tee Class-2 conforming to IS 10124(part-5)/ 1998 with latest amentments. a) 160x160x160

65

26325

405

... More
b) 110x110x110

65

22555

347

... More
iv) 87.5 degree bend (class-2) conforming to IS 10124 (part-8)/1988 with latest amendments. 160 mm OD

48

16224

338

... More
(v) Plain Tee(c) 160 mm

9

8282

920.32

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 (D) Solvent cement

50

21250

425

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 (A) (i) Single Socketed 3 Meter Length 160mm OD

1025

646775

631

... More
110 mm OD

117

33228

284

... More
i) Supply of UPVC Pipe vent cowl 110 mm dia.

65

2145

33

... More
ii) Supply of UPVC pipe clip 110 mm

130

2730

21

... More
iii) Supply of UPVC pipe clip 160 mm.

215

9245

43

... More
Supplying fitting fixing MS Brcket made of 50x50x6 mm Angle

210

54390

259

... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. Parapet wall

18

12186

677

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] floor. with (1:6) cement morter,15mm thick

38.5

5467

142

... More
Cement concrete in foundation, floor and all sorts of R.C.C works with approved graded stone chips (20mm size) excluding shuttering and reinforcement if any in ground floor. A) 1:1.5:3 proportion

1.13

6697

5953

... More
Earth work in excavation of field trenches as per design section and alignment for laying of pipe lines (PVC, RCC, ACP etc.) upto a depth of 1500 mm all 1 sorts of soils including removing, spreading or stacking extra earth as directed. The item includes necessary trimming of sides trenches, levelling, dressing and ramming the bottom as required complete.

5

495

99.01

... More
Earth work in filling in trenches after laying pipe lines (PVC, RCC, ACP etc.) with good earth obtained from excavation of field trenches in layers not exceeding 225 mm, including watering and ramming etc. layer by layer complete. (Payment will be made on the basis measurement of finished quantity of work.)

2.5

165

66.01

... More
Add GST @ 18% [Except Item No. 6 i), 6 iii) b), 7 & 8] i.e. [Rs. 11,23,264.69 -Rs.11990.00 -Rs.22555.00 -Rs.21250.00 -Rs.646775.00 - Rs. 33228.00] ie. On Rs.387486.69

1

69747

69747.6

... More
Add labour welfare cess @1%

1

11930

11930.32

... More
PART:B CONTROL UNIT Earth work in Excavation of foundation or drains in all sorts of soil (including mixed soil but excluding laterite and sand stone), including removing, spreading or stacking the spoils, as directed and including trimming the sides of trenches, levelling, dressing and raming the bottoms, bailing or pumping out water etc.as required complete. Depth of excavation not exceeding 1.5 metre (Not required sorting) lead upto 75 m.

12.12

1445

119.27

... More
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement. If any, in ground floor as per relevent IS code Pakur Variety.

2.77

14974

5402

... More
Single brick flat soling if picked jhama bricks including ramming amd dressing bed to proper level and filling joints with powdered earth or local sand.

9

2934

326

... More
Brick work in cement morter (1:4) with first class bricks including racking out joints, scaffolding and other incidental works etc. complete

8.91

46315

5197

... More
Filling in foundation or plinth by silver sand in finished quantity) layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)

2.42

1453

59961

... More
Ordinary Cement concrete in foundation, floor and all sorts of R.C.C works with approved graded stone chips (20mm size) excluding shittering and reinforcement if any in ground floor. A) 1:1.5:3 proportion.

1.2

7143

5953

... More
Reinforcement for reinforced cement works in all sorts of structure including distribution bars, stirrups, binders ctc. Including supply of rods, initial straightening of bend bars excluding coil bars and removal of loose rust (if necessary) cutting to requisite length, hooking, bending to correct shape, placing in proper position and binding with 1.626 mm(16 gauge) black annealed wire at every inter section complete as per drawing and direction including cost of wire up to 1st floor level.For Tor steel 0.8% of the volume of concrete

0.07

4351

60433

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 musing approved stout props and thick hard wood planks of approved thickness with reqired bracing for concrete slab, beams, column, lintels curved or straight including fitting fixing and stricking out after completion of works ( upto roof of ground floor). 25mm to 30mm thick wooden shuttering.

2.4

792

330

... More
Plaster ( to wall, floor, celling etc. ) with sand and cement morter including rounding off or chamfering corners, as directed and racking out joints or roughening of concrete surface including throating, nosing and drip course as necessary at ground floor. 15mm thick 1:4 proportion

61

9638

158

... More
Neat cement punning about 1.5mm thick in wall dado, floor,drain, door & window sill etc. complete

61

2074

34

... More
Add GST @18%

1

16401

16401.92

... More
Add labour welfare cess @1%

1

1075

1075.24

... More
Part - C : INSPECTION PIT Earth work in Excavation of foundation or drains in all sorts of soil (including mixed soil but excluding laterite and sand stone), including removing, spreading or stacking the spoils, as directed and including trimming the sides of trenches, levelling, dressing and raming the bottoms, bailing or pumping out water etc.as required complete. Depth of excavation not exceeding 1.5 metre (Not required sorting) lead upto 75 m.

15.6

1860

119.27

... More
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement. If any, in ground floor as per relevent IS code Pakur Variety.

3.2

17286

5402

... More
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand.

8.1

2640

326

... More
Brick work in cement morter (1:4) with first class bricks including racking out joints, scaffolding and other incidental works etc. complete.

8.28

43031

5197

... More
Filling in foundation or plinth by silver sand in finished quantity) layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)

3.12

1870

59961

... More
Ordinary Cement concrete in foundation, floor and all sorts of R.C.C works with approved graded stone chips (20mm size) excluding shittering and reinforcement if any in ground floor. A) 1:1.5:3 proportion.

1.47

8750

5953

... More
Reinforcement for reinforced cement works in all sorts of structure including distribution bars, stirrups, binders ctc. Including supply of rods, initial straightening of bend bars excluding coil bars and removal of loose rust (if necessary) cutting to requisite length, hooking, bending to correct shape, placing in proper position and binding with 1.626 mm(16 gauge) black annealed wire at every inter section complete as per drawing and direction including cost of wire up to 1st floor level. For Tor steel 0.8% of the volume of concrete

0.09

5559

60433

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 musing approved stout props and thick hard wood planks of approved thickness with reqired bracing for concrete slab, beams, column, lintels curved or straight including fitting fixing and stricking out after completion of works ( upto roof of ground floor). 25mm to 37.5mm thick wooden shuttering.

4.2

1386

330

... More
Plaster ( to wall, floor, celling etc. ) with sand and cement morter including rounding off or chamfering corners, as directed and racking out joints or roughening of concrete surface including throating, nosing and drip course as necessary at ground floor. 15mm thick 1:4 proportion.

87.1

13761

158

... More
Neat cement punning about 1.5mm thick in wall dado, floor,drain, door & window sill etc. complete.

87.1

2961

34

... More
Add GST @18%

1

17839

17839.71

... More
Add labour welfare cess @1%

1

1169

1169.5

... More
PART-D: RECHARGE CHAMBER Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.

70.38

8394

11927

... More
(b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring

62.17

11960

19238

... More
Hire & labour charges for shoring work (including necessary close plank walling framing, salbulla pilling strutting etc) complete as per direction of the Engineer- in- charge for foundation excavation. (Vertical surface area in contact with supported earth is to be measured).This item should be executed on specific direction of the Engineer-in charge. i)Depth upto 1.5m

52.8

19852

376

... More
ii)For additional depth beyond 1.5 m and upto 3 m

24.65

10572

429

... More
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)

7.04

4220

59961

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

46.92

15295

326

... More
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion

4.69

20433

4355

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety

6.6

39289

5953

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m i)Tor Steel (SAIL/TATA/RINL)

0.78

47016

60433

... More
Brick work with 1st class bricks in cement mortar (1:4), (a) In foundation and plinth.

22.8

118491

5197

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding /staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] a)15mm thick 1:4 proportion at inside & outside of the concrete wall.

148.1

23399

158

... More
Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc.

148.1

5035

34

... More
Supply of gravel for use as pack in tube well of 2 mm to 4 mm. size(as per IS: 4097) and gravel treatment of tubewell including screening, washing, cleaning Cu.M. 2227.25 etc. of the gravels at the site, all complete as per direction of the Engineer-in-charge

28

75572

2699

... More
Supply of course sand ( fineness modules not less than 2) including cleaning, screening etc. at site and placing in layers in the recharge pit as per direction of E.I.C.

14

13328

952

... More
Add GST @ 18%

1

74306

74306.08

... More
Add Labour Welfare Cess @ 1%

1

4871

4871.18

... More
PART-E: RECHARGE WELL Drilling of bore hole of suitable diameter upto required depth by water jet system through any type of soil including hire and labour charges for boring pipes, scaffolding, other tools and plants etc. and taking out the same all complete and other incidental works in this connection. The bore hole should have minimum 65 mm gap in between outside of the tube well pipe and the bore. iii) for lowering 150 mm dia GI/PVC pipe

260

147100

565.77

... More
Labour charges for fitting, fixing & jointing thread to thread with solvent cement the P.V.C. pipes (Housing pipe, Blank Pipes, Strainers, bottom plug etc.) and lowering the same carefully into the bore hole down to the required depth complete in all respects as per direction of the Engineer-in-charge. a) 150 mm DN dia. blank pipe, Bottom Plug & Screen /Slotted Pipe.

248

36012

145.21

... More
Supply of casing pipes ISI marked, IS-12818, 150 MM N.B. 7.5 mm Medium

164

184336

1124

... More
Supply of casing pipes ISI marked, IS-12818, 150 MM dia 7.5 mm thick screen ribbed (medium)

84

152796

1819

... More
Supplying, fitting, fixing the following fittings of PVC-U conforming to IS: 12818 & lowering in position etc. as directed by the Engineer-in-Charge. (i) 150 mm Dia. UPVC end cap

8

2187

273.46

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 xv) Vent Cowl (c) 160 mm PWD S&D B-II Soil pipes & fittings.

4

228

57

... More
Supplying, fitting, fixin including suppling of suitable joining compound for fixing in position, threading, if necessary etc. all complete. 80mmx 150 mm .MS heavy type belmouth reducing socket(6mm. Thick)

4

2979

744.93

... More
Supply of approved quality PEA shaped gravel of 2 mm to 4 mm. size and gravel treatment of tubewell including screening washing, cleaning etc. of the at the site complete as per direction of Engineer - in- Charge. (i) For sites within 4 Km. from all weather metal road.

19.51

52657

2699

... More
Washing and development by pumping with 30 cum per hour capacity pump for a period till sand free water comes out and the discharge is about 30 cum per hour, followed by final yield test; inclusive of all tools, plants and scaffolding and hire charge of submersible pump, generator etc. all complete

4

18255

4563.88

... More
Charges for Mobilisation of drilling equipments, tools and plants etc. and transportation of departmental materials from Subdivisional store to work site and returning excess departmental materials if any, to Sub-divisional store after completion of work.

4

7241

1810.46

... More
Making arrangement and showing verticality test & sounding test including cost/ hire charges of necessary tools & plants, scaffolding, labour etc all complete as per direction of Engineer-in- charge.

4

3432

858.08

... More
Add GST @18% (Except Item No.3 & 4)

1

48616

48616.08

... More
Add Labour Welfare Cess @1%

1

6558

6558.36

... More
PART-F: PIZOMETRIC TUBE Supply of G.I. Pipes of TATA make of different dia. Including necessary socket. i)50 mm. dia. Medium quality.

12

4824

402

... More
ii)40 mm dia Medium quality

46

13386

291

... More
Supplying GI pipes strainer with Brass net & jacketted of approved quality. (Heavy Type)40 mm dia

3.6

3506

974

... More
Supplying, fitting and fixing steel cutter piece upto 450 mm long with socket. 40 mm dia

1

124

124

... More
Supply of G.I. reducing socket with I.S.I. mark (v) 50 mm

1

101

101

... More
Supplying, fitting and fixing plug of approved make conforming to I.S.specifications. 50 mm dia .

1

71

71

... More
Labour charges for boring tubewell as required dia. by water jet system through any type of soil strata including hire and labour chaarges for boring pipes scaffolding tools and plants as necessary and taking out them and lowering pipes strainers blind pipes etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tubewell should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore for depth upto 150 m.i)For 50 mm. dia. Pipe.

12

1776

148

... More
ii)For 40 mm. dia. Pipe.

52

4680

90

... More
Supplying, fitting & fixing of M.S supporting clamps in two halves of 250 mm x 65 mm x 8 mm size with two (2) nos. of bolt of 12 mm dia, 65 mm long with necessary nuts, washers etc. provided on either side of the clamp i.e. total 4 nos. of bolts with nuts, springs and flat washers for holding & supporting 50/80 mm tube well assembly on concrete block.

1

707

707.21

... More
Supplying and filling up of the annular space between the Well Pipe and the bore hole by coarse sand including watering as necessary as per direction the Engineer-in-Charge.

1.5

1077

718.53

... More
Cement Concrete (1:2:4) Base Block of (600x600x300mm) for fixing base of P-tube.

1

754

754.36

... More
Charges for Mobilisation of drilling equipments, tools & plants etc. and transportation of departmental materials from SUb-divisional store to work site and returning excess departmental materials if any, to sub-divisional store after completion of work for new p-tube, withdrawal & re-sinking etc.

1

707

707.21

... More
Pumping with hand pump for at least 3 hours till sand free water is available from piezometric tubes including carrying, loading, un-loading & hiring charge ofpump etc. complete. i) Hand pump (Shallow well reciprocating pump) when water level is within atmospheric suction limit from GL.

1

660

660.07

... More
Add GST @ 18%

1

5827

5827.51

... More
Add Labour Welfare Cess @ 1%

1

382

382.03

... More
PART-G: DISPLAY BOARD Earth work in Excavation of foundation or drains in all sorts of soil (including mixed soil but excluding laterite and sand stone), including removing, spreading or stacking the spoils, as directed and including trimming the sides of trenches, levelling, dressing and raming the bottoms, bailing or pumping out water etc.as required complete. Depth of excavation not exceeding 1.5 metre (Not required sorting) lead upto 75 m.

0.23

27

11927

... More
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement. If any, in ground floor as per relevent IS code Pakur Variety

0.09

480

5402

... More
Single brick flat soling if picked jhama bricks including ramming amd dressing bed to proper level and filling joints with powdered earth or local sand.

0.51

167

326

... More
Brick work in cement morter (1:4) with first class bricks including racking out joints, scaffolding and other incidental works etc. complete.

0.77

4001

5197

... More
Plaster ( to wall, floor, celling etc. ) with sand and cement morter including rounding off or chamfering corners, as directed and racking out joints or roughening of concrete surface including throating, nosing and drip course as necessary at ground floor. 15mm thick 1:4 proportion.

5.85

924

158

... More
White washing including cleaning and smoothening surface thoroughly. All floors. (c) Three coats (on new works only).

5.18

103

2001

... More
Colour washing with any shade with Stainers, as required including cleaning and smoothening surface thoroughly : (ii) External surface (Ground floor). (b) Two coats (on new works only). (i) Other than yellow, pink.

5.18

110

2135

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.

1.15

39

34

... More
Providing and fixing machine cut, mirror polished, Italian Marble stone (Imported quality, such as Perlato, Bottichino, Crema, Antique Beige, Dark Emperadore, Red Verona, Black Marquino etc.) in dado/wall laid in required pattern in linear portion of the building all complete as per architecturaldrawings with Italian Marble stone slab laid over 15 mm (average) thick base of cement morter 1 : 2 (1 cement : 2 coarse sand) including making suitable arrangements to hold the stones properly by brass / copper hooks applying white cement slurry @ 4.4 kg/sq.m the back site of marble and pointing with cement morter (1:2)(1 Cement : 2 Marble dust) admixed with pigment to match the marble shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge including cost of materials, labours, scaffolding, staging, curing complete. [White cement, Pigment to be supplied by the Agency]. [This work should not be executed without specific permission of Superintending Engineer] a) Light Beige Colour (such as Perlato, Bottichino, Crema). i) 18 mm thick Italian Marble stone slab.

0.07

372

5479

... More
Painting block letters or digits in Black Japan or any approved paint as per direction. b) Size above 2.5 cm. and upto 4 cm. NB.: The above rates will be enhanced by 100% if the letters are engraved and painted. L.S. 150 Nos

150

2400

16

... More
Add GST @18%

1

1552

1552.95

... More
Add Labour Welfare cess @ 1%

1

101

101.8

... More
PART-H: TOP COVER OF RECHARGE CHAMBER M.S.works in framed gratings of window etc. made of round or square bars of 8 mm and frame work or M.S. flats/ angl 65x 65x6 mm (with the bars securely fixed to the flat bar frame) with or without intermediate flat bar stiffener and fixed with necessary screws etc. complete, as directed. In Ground floor.

2.96

26072

8823

... More
Supplying, fitting, fixing in position netting with PVC Coated Crinkle mesh of approved colour with wooden or steel or concrete frame work including cost of galvanised bolts, nuts, screws, nails, spacers, shape welding etc complete but excluding the cost of supporting frame works, battens etc. a) 25 mm x 25 mm x 8 g.

16.13

11384

706

... More
Priming one coat on steel or other metal surface with synthetic enamel (Oil bound primer of approved quality including smoothening surfaces by sand papering etc.

16.13

467

29

... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc.including using of approved puttyetc.on surface if necessary. On steel or other metal surface with super gloss (high gloos) (Two coat) with any shade except white.

16.13

1273

79

... More
Add GST @18%

1

7055

7055.75

... More
Add Labour Welfare cess @ 1%

1

462

462.54



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.