State Water Investigation Directorate Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

State Water Investigation Directorate - SWID Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date29 Oct 2024
Closing Date11 Nov 2024
Tender Amount₹ 7,52,235 
Notes
Download

Costs

Summary

Construction Of Roof Top Rain Water Harvesting And Artificial Recharging To Ground Water At Kalyani Mahavidyalaya.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of UPVC pipes- (B Type) & fittings conforming to IS-13592-1992. A. Pipes (Single Socketed) (a) 110 mm OD (Class II)

12

284

3408

... More
(b) 160 mm OD (Class II)

156

631

98436

... More
B. FITTINGS (a) Couplar 110mm OD (Class II)

10

67

670

... More
(b) Couplar 160mm OD (Class II)

15

218

3270

... More
(c) Plain Tee i) 160 mm OD

12

920

11043.84

... More
ii) 110 mm OD (Class II)

12

347

4164

... More
d) Reducing Tee (160 X 110 mm)

10

405

4050

... More
(e) Bend 45º (160 mm OD )

6

293

1758

... More
(f) Door Bend (160 mm)

6

369

2214

... More
g) Vent cowl 110 mm dia.

10

33

330

... More
h) Pipe clip 110 mm

10

21

210

... More
(i) Pipe clip 160 mm

10

43

430

... More
(j) Solvent Cement

5

425

2125

... More
SUPPLYING, FITTINGS & FIXING OF PVC HD-END CAP (PLAIN) AS PER IS 7834 ( HIGH DENSITY) i) 160 mm OD

2

455

910.88

... More
Supply fitting and fixing of MS Brakets made of 50X50X6 mm angles , priming painting including cutting hole and mending good damage for fixing of 160 mm OD UPVC pipes on walls all complte as per direction of Engineer-In charge.

64

262

16768

... More
Supplying, fitting, fixing C.I Grating (Heavy type). i) above 100 mm up to 150 mm squre or round

10

108

1080

... More
CI sluice valve with hand wheel, ISI marked IS:14846 150 mm . ( i) 150 mm Dia.

2

9950

19900

... More
Supply of PVC fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). (i) Flange 150 mm

2

591

1182

... More
Earth work in excavation of field trenches as per design section and alignment for laying of pipe lines (PVC, RCC, ACP etc.) upto a depth of 1500 mm all 1 sorts of soils including removing, spreading or stacking extra earth as directed. The item includes necessary trimming of sides trenches, levelling, dressing and ramming the bottom as required complete (a) Depth of excavation not exceeding 1,500 mm

27

99

2673.27

... More
Earth work in filling in trenches after laying pipe lines (PVC, RCC, ACP etc.) with good earth obtained from excavation of field trenches in layers not 2 exceeding 225 mm, including watering and ramming etc. layer by layer complete. (Payment will be made on the basis of measurement of finished quantity of work.)

25.8

66

1703.06

... More
Add GST @ 18% Except Item No. 2.A.a) &b); 2.B.a) &b); 2.c)ii) ; 3.j) & Item No. 7.

1

10430

10430.83

... More
Add Labour Welfare Cess @ 1%

1

2003

2003.53

... More
PART - B : CONTROL UNIT Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of execution not exceeding 1.5 meter (Not required sorting) lead upto 75 m.

2.18

11927

259.77

... More
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)

0.55

93621

511.17

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

3.63

361

1310.43

... More
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion

0.36

4761

1728.24

... More
Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth

2.3

5682

13040.19

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.

0.36

5959

2163.33

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m. i)Tor Steel ,

0.03

60150

1714.03

... More
Plaster ( to wall, floor, celling etc. ) with sand and cement morter including rounding off or chamfering corners, as directed and racking out joints or roughening of concrete surface including throating, nosing and drip course as necessary at ground floor. 15mm thick 1:4 proportion

7.56

167

1262.52

... More
Neat cement punning about 1.5mm thick in wall dado, floor,drain, door & window sill etc. complete.

7.56

34

257.04

... More
Add GST @ 18%

1

4004

4004.16

... More
Add Labour Welfare Cess @ 1%

1

262

262.5

... More
PART-C: RECHARGE CHAMBER Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.

31.65

11927

3774.45

... More
(b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring

31.12

19238

5986.67

... More
Hire & labour charges for shoring work (including necessary close plank walling framing, salbulla pilling strutting etc) complete as per direction of the Engineer- in- charge for foundation excavation. (Vertical surface area in contact with supported earth is to be measured).This item should be executed on specific direction of the Engineer-in charge. i)Depth upto 1.5m

27.6

386

10653.6

... More
ii)For additional depth beyond 1.5 m and upto 3 m

27.14

439

11914.46

... More
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)

3.17

93621

2963.1

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

21.1

361

7616.38

... More
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion

2.11

4761

10045.71

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety

2.39

5959

14249.36

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m i)Tor Steel,

0.28

60150

16902.15

... More
Brick work with 1st class bricks in cement mortar (1:4), (a) In foundation and plinth.

13.41

5682

76172.89

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding /staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] a)15mm thick 1:4 proportion at inside & outside of the concrete wall.

62.75

167

10479.25

... More
Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc.

62.75

34

2133.5

... More
Supply of gravel for use as pack in tubewell of 2 mm to 4 mm. size(as per IS: 4097) and gravel treatment of tubewell including screening, washing, cleaning Cu.M. 2227.25 etc. of the gravels at the site, all complete as per direction of the Engineer-in-charge.

10.5

3885

40797.75

... More
Supply of course sand ( fineness modules not less than 2) including cleaning, screening etc. at site and placing in layers in the recharge pit as per direction of E.I.C.

5.25

1430

7507.5

... More
Colour washing with any shade with Stainers, as required including cleaning and smoothening surface thoroughly (ii) External surface (Ground floor)(b) Two coats (on new works only).(ii) Yellow, pink.

21.7

21

466.55

... More
Add GST @ 18%

1

39904

39904.31

... More
Add Labour welfare Cess @ 1%

1

2615

2615.95

... More
PART-D:TOP COVER OF RECHARGE CHAMBER M.S.works in framed gratings of window etc. made of round or square bars of 8 mm and frame work or M.S. flats/ angl 65x 65x6 mm (with the bars securely fixed to the flat bar frame) with or without intermediate flat bar stiffener and fixed with necessary screws etc. complete, as directed. In Ground floor.

2.44

8823

21506.06

... More
Supplying, fitting, fixing in position netting with PVC Coated Crinkle mesh of approved colour with wooden or steel or concrete frame work including cost of galvanised bolts, nuts, screws, nails, spacers, shape welding etc complete but excluding the cost of supporting frame works, battens etc. a) 25 mm x 25 mm x 8 g.

12.19

706

8604.38

... More
Priming one coat on steel or other metal surface with synthetic enamel (Oil bound primer of approved quality including smoothening surfaces by sand papering etc.)

12.19

29

353.44

... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc.including using of approved puttyetc.on surface if necessary. On steel or other metal surface with super gloss (high gloos) (Two coat) with any shade except white.

12.19

79

962.81

... More
Add GST @ 18%

1

5656

5656.8

... More
Add Labour welfare Cess 1%

1

370

370.83

... More
PART-E: RECHARGE WELL Drilling of bore hole of suitable diameter upto required depth by water jet system through any type of soil including hire and labour charges for boring pipes, scaffolding, other tools and plants etc. and taking out the same all complete and other incidental works in this connection. The bore hole should have minimum 65 mm gap in between outside of the tube well pipe and the bore. iii) for lowering 100 mm dia GI/PVC pipe

133

262

34864.62

... More
Supplying fitting and fixing PVC Casing pipes ISI marked , IS-12818 (c) 100 mm dia 5 mm thick .(Part - I).

109

510

55590

... More
Supplying 100 mm dia. 5 mm thick screen Ribbed (Medium) of approved make with adapter conforming to IS specifications . 1) 100 mm dia

21

817

17157

... More
Labour charges for lowering of pipe, strainers blank pipe etc. and fitting, fixing the same including cutting, threading where necessary complete including bucket washinq and other incidental works in this connection 100 mm dia GI Blank pipe Bottom Plug with cutter, Brass Jacketted /stainless steel strainer.

130

70

9193.6

... More
Supply of gravel for use as pack in tube well of 2 mm to 4 mm. size(as per IS:4097) and gravel treatment of tubewell including screening, washing, cleaning etc. of the gravels at the site, all complete as per direction of the Engineer-in-Charge.

8.38

3885

32544.95

... More
Supplying, fitting and fixing including supplying of suitable joining compound for fixing in position, threading, if necessary etc. all complete (c) i) 100 mm dia G.I. threaded top/end cap fixed in position

2

139

278

... More
Washing and development by pumping with 30 cum per hour capacity pump for a period till sand free water comes out and the discharge is about 30 cum per hour followed by final yield test,inclusive of all tools,plants and scaffolding and hire charge of submersible pump , generator etc. all complete.

1

4563

4563.88

... More
Charges for Mobilisation of drilling equipments, tools and plants etc. and transportion of departmental materials from Sub-divisional store to work site and returning excess departmental materials if any, to Sub-divisional store after completion of work

1

1810

1810.46

... More
Making arrangement and showing verticality test & sounding test including cost/ hire charges of necessary tools & plants, scaffolding, labour etc all complete as per direction of Engineer-in- charge.

1

858

858.08

... More
Electrologging of bore hole of different dia tubewell for locating water bearingstrata and saline aquifer, if any, after conducting relevant geophysical tests. All test reports, compiled data and raw data sheets should be submitted to the EachEngineer-in-Charge (Cost is inclusive of all charges for equipments, labour, data aquisition & compilation of data sheets as per direction of the Engineer-incharge)

1

8015

8015.08

... More
Add GST @ 18% except item no. 45 & 46

1

16583

16583.16

... More
Add Labour Welfare Cess @ 1%

1

1814

1814.59

... More
PART-F: MS STRUCTURAL SIGN BOARD Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.

0.43

11927

51.52

... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding150 mm. including watering and ramming etc.layer by layer complete. (Payment to be made onthe basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.

0.09

7754

6.67

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

0.72

361

259.92

... More
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion

0.06

4761

290.42

... More
Brick work with 1st class bricks in cement mortar (1:4), (a) In foundation and plinth

0.17

5682

948.89

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding /staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] b) 15mm thick 1:4 proportion at the side of brick wall, inside & outside & top.

1.03

167

171.18

... More
M.S. structural works in columns, beams etc.with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in- charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS:816- 1956 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Weighing less than 22.5 Kg. / m. MS Angle 50mmx50mmx6mm

0.05

72603

3412.34

... More
Supplying 1.5mm thick M.S. sheet fitted and fixed on one or both faces of M.S./ W.I. gate etc. with point welding at not more than 150mm apart complete in all respect as per design including cost of all labour and materials.

1.8

1304

2347.2

... More
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.

3.6

29

104.4

... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary On steel or other metal surface with super gloss ( high-gloss) (b) On steel or other metal surface (Two coat)with any shade except white.

7.2

79

568.8

... More
Painting block letters or digits in Black Japan or any approved paint as per direction. b) Size above 2.5 cm. and upto 4 cm. On Board

450

8

3600

... More
Add GST @ 18%

1

2111

2111.02

... More
Add Labour Welfare cess @ 1%

1

138

138.39

... More
PART-G: VEHICLE Casual Hiring Charge of Motor Cab & Maruti omni (Standard) ( Non AC) including fuel & mobil for ref Bharat Stage-III purchased on or after 01.05.2008 with Deisel/LPG/CNG Engine.As per ceiling of rates for hiring vehicles in West Bengal Rs 13.00 per km. Total km up and down from Barasat to Kalyani College and back = 78.4 km (approx).Supervision for 24 days. Total journey =24 x 78.4 km = 1881.6 km.

1881.6

13

24460.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.