Sriniketan Santiniketan Development Authority Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Sriniketan Santiniketan Development Authority - SSDA Tender
Civil And Construction
Eprocure
Opening Date7 Mar 2024
Closing Date22 Mar 2024
Tender Amount₹ 43,40,889
Costs
EMD
₹ 86,818Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SSDA_678187_1Bid Award Id
ViewTender No
28 OF 2023-24Tender Authority
Sriniketan Santiniketan Development Authority ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Ordinary mix Cement concrete (1:2:4) with graded stone chips (20 mm. size) excluding shuttering and reinforcement if any in ground floor as per relevant IS codes. (PWD Item- 4, Page-24, 3rd corrigandum)
256.88
1244814
4845.9
Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications. (P.W.(Roads- 2018, .Item :-12.21,Page-299.
0.21
11816
55737.65
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work
1455
298275
205
Road Work : Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller
to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.(a) Depth up to 150 mm.
630
6016
9.55
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm.
10.13
1154
114
Sand filling in foundation or plinth by silver sand in layers not exceeding 15cm as directed and consolidating same by thorough saturation with water and ramming complete including the cost of supply of sand. (Payment to be made on measurement of finished quantity).
64.35
40008
621.74
Supplying and laying Polythene Sheet (150gm / sq.m.) overdamp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
630
15120
24
Plain / Reinforced Cement Concrete in Substructure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications.PCC Grade M20 I. Using Concrete Mixer (i) For solid slab super-structure,a) Height upto 5m
337.77
1913936
5666.39
Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications. (P.W.(Roads- 2018, .Item :-12.21,Page-299.
0.25
14157
55737.65
GST, as applicable @ 18% .
1
655613
655613
Labour welfare cess @1% .
1
42970
42970
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements