Siliguri Jalpaiguri Development Authority Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Siliguri Jalpaiguri Development Authority - SJDA Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date16 Feb 2024
Closing Date9 Mar 2024
Tender Amount₹ 1,45,61,092 
Notes
Download

Costs

Summary

Nit No. 153/ Engg/ 2023-24 Of Sjda

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety

46.42

260118

5603.95

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel I. SAIL/ TATA/RINL

5.5

331944

60353.61

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation

7470.25

1531401

205

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar (b) 15 mm thick plaster

4760

747320

157

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.

4760

161840

34

... More
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.

2870

617050

215

... More
Supply and errection of M.S Sign Board (1800 mm x1200 mm) with necessary lettering etc. complete. Fabrication and errection of the board to be done with M.S angles such as, frame (40x40x6 mm), M.S sheet of 0.5 mm thick & Posts with M.S angles (75x75x6 mm) section at a clear hight of atleast 2.50 mtr. above ground level. Erection of the complete board (priming. painting and writting of the work related informations) as per supplied proforma, has to be carried out by digging holes (0.75 x 0.75 x 0.75 mtr) in all sorts of soil and packing the M.S angle posts with cement concrete (1:3:6) of section (0.60 x 0.60 x 1.05 Mtr) and filling the gaps with the excavated earth including priming and 2 coats of painting on both sides complete in all respect as per direction of the E-I-C.

1

13505

13505.4

... More
Add GST @ 18 %

1

2199191

2199191.66

... More
Add labour Welfare Cess @ 1 %

1

144169

144169.23



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.