Public Works Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Works Department - PWD Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date9 Dec 2024
Closing Soon30 Dec 2024
Tender Amount₹ 20,32,481
Costs
EMD
₹ 40,650Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Restoration Work For Laying Phe Pipelines Along The Road Side Of Keshiary Kulboni Road (mdr) From 0.00kmp To 1.72 Km Under Jhargram Division, Pwd In The District Of Paschim Medinipur During The Tear 2024-25. (2nd Call)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WBPWD_781365_4Tender No
EE/JGM.DIVN/2024-25/NIT-17/07Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://wbpwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Wet Mix Macadam Base Course
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting, guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
Pakur variety Stone Chips
Use 26.5mm chips @ 0.3960 m3/m3, 13.2mm chips @ 0.2640 m3/m3, 5.6mm chips @ 0.3564 m3/m3 & Stone dust with grit @ 0.3036 m3/m3
20.63
2887
59571
... More
Prime Coat
Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For WBM / WMM Surface: with primer @ 0.85 kg/sqm
Cost of Bitumen Emulsion( SS-1 Type ) (Packed)
82.5
32
2717
... More
Tack Coat: Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). On Granular surfaces treated with primer {Using cationic bitumen Emulsion (RS-1) packed type @0.275 Kg./M2}
82.5
10
842
... More
Dense Bituminous Macadam
Providing and laying dense bituminous macadam with Hot Mix Plant producing an average output of 75 tonnes per hour using coarse aggregate, fine aggregate, filler and bituminous binder as per design Job Mix Formula conforming Marshall Method as per specification, including screening, cleaning of chips and preparing a uniform and quality mix in Hot Mix Plant and ensuring a homogeneous mix, in which all particles of the mineral aggregates are coated uniformly, transporting the hot mix to work site, laying the mixed materials at specified laying temperature with a hydrostatic paver finisher with sensor control to the required grade, level and alignment over prepared surface coated with tack coat, rolling with smooth wheeled, vibratory and tandem rollers for break down, inter-mediate and finished rolling to achieve the desired density of at least 98% of that of Laboratory Marshall specimen, hand packing and pinning to give an even surface including cost and carriage of bitumen, coarse and fine aggregates and filler materials and hire charges of machinery and equipment for construction and quality control, fuels and lubricants and wages of operational staff complete as per Clause 505 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For Grading 2
(26.5 mm nominal size, 50 mm com. thick.)
Using Batch Type HMP of minimum capacity 100-120 TPH.
Pakur variety Stone Chips
Use 26.5mm chips @ 0.2197 m3/m3, 22.4mm chips @ 0.2197 m3/m3, 11.2mm chips @ 0.3662 m3/m3, 5.6mm chips @ 0.2197 m3/m3, Stone dust with grit @ 0.4394m3/m3 & Lime/Cement filler @ 44 kg/m3
Cost of Bitumen bulk (VG-40) @ 111 kg/m3
4.13
7854
32399
... More
Tack Coat: Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). On Bituminous Surface treated with primer {Using cationic bitumen Emulsion (RS-1) packed type @0.25 Kg./M2}
82.5
9
775
... More
Bituminous Concrete
Providing and laying bituminous concrete with Hot Mix Plant using coarse aggregates, fine aggregates, filler materials and bituminous binder of required specification including screening, cleaning of chips and preparing a uniform and quality mix in Hot Mix Plant and ensuring a homogeneous mix, in which all particles of the mineral aggregates are coated uniformly, transporting the hot mix to work site, laying the mixed materials at specified laying temperature with a hydrostatic paver finisher with sensor control to the required grade, level and alignment over prepared surface coated with tack coat, rolling with smooth wheeled, vibratory and tandem rollers for break down, inter-mediate and finished rolling to achieve the desired density of at least 98% of that of Laboratory Marshall specimen, including cost and carriage of bitumen, coarse and fine aggregates and filler materials and hire charges of machinery and equipment for construction and quality control, fuels and lubricants and wages of operational staff complete as per Clause 507 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For Grading 2
(13.2 mm nominal size, 30 mm thick.)
Using Batch Type HMP of minimum capacity
100-120 TPH.
Using Batch Type HMP of minimum capacity 100-120 TPH.
Pakur variety Stone Chips
Use 13.2mm chips @ 0.2959 m3/m3, 11.2mm chips @ 0.2959 m3/m3, 5.6mm chips @ 0.2959 m3/m3, Stone dust with grit @ 0.5919m3/m3 & Lime/Cement filler @ 45 kg/m3
Cost of Bitumen bulk (VG-40) @ 137 kg/m3
2.48
8599
21284
... More
Water Bound Macadam Sub Base
Water Bound Macadam Sub Base by consolidating Laterite chelly of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For Construction of Sub Base by consolidating Laterite (90 mm to 45 mm):
Use laterite @1.45 m3/m3
322.5
1118
360800
... More
Add GST @ 18% on Rs.1705387.00 i.e. total amount over item 1 to 10
1705387
18
306970
... More
Add Cess @ 1% on Rs.2012357.00 i.e. total amount over item no. 1 to 11
2012357
1
20124
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%