Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Works Department - PWD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date24 Mar 2025
Closing Date16 Apr 2025
Tender Amount₹ 25,79,384 
Notes
Download

Costs

Summary

Wbpwd/ss/ee/bdn/ Nit_18 /2024_2025_sl _1

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
In 1st Floor

6.93

497

3444

... More
In 2nd Floor.

6.93

547

3791

... More
In 3rd Floor

6.93

597

4137

... More
In 4th Floor

6.93

647

4484

... More
In 5th Floor

6.93

697

4830

... More
In 6th Floor

6.93

747

5177

... More
In 7th Floor

6.93

797

5523

... More
In 8th Floor

6.93

847

5870

... More
In 9th Floor

7.42

897

6656

... More
Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture] (b) M 25 Grade A) In Ground Floor.

0.36

5584

2011

... More
In 1st Floor.

0.36

5679

2045

... More
In 2nd Floor

0.36

5774

2079

... More
In 3rd Floor.

0.36

5869

2113

... More
In 4th Floor

0.36

5964

2147

... More
In 5th Floor

0.36

6080

2189

... More
In 6th Floor

0.36

6196

2231

... More
In 7th Floor

0.36

6312

2273

... More
In 8th Floor.

0.36

6428

2314

... More
In 9th Floor.

32.32

6544

211528

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if essary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as er drawing and direction. (a) For works in foundation, basement and upto roof of ground i) SAIL / TATA / RINL .

0.03

55192

1545

... More
In 1st floor

0.03

55622

1557

... More
In 2nd Floor.

0.03

56052

1569

... More
In 3rd Floor.

0.03

56482

1582

... More
In 4th Floor.

0.03

56912

1594

... More
In 5th Floor

0.03

57412

1608

... More
In 6th Floor.

0.03

57912

1622

... More
In 7th Floor.

0.03

58412

1636

... More
In 8th Floor.

0.03

58912

1650

... More
In 9th Floor.

3.81

59412

226125

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with uired bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work In Ground floor.

5.17

363

1877

... More
In 1st floor.

5.17

381

1970

... More
In 2nd Floor.

5.17

399

2063

... More
In 3rd Floor.

5.17

417

2156

... More
In 4th Floor.

5.17

435

2249

... More
In 5th Floor.

5.17

457

2363

... More
In 6th Floor.

5.17

479

2476

... More
In 7th Floor.

5.17

501

2590

... More
In 8th Floor.

5.17

523

2704

... More
In 9th Floor.

281.75

545

153554

... More
Brick work with 1st class bricks in cement mortar (1:6) (a) In superstructure, ground floor.

5.5

4990

27465

... More
In 1st floor.

5.5

5101

28076

... More
In 2nd Floor.

5.5

5212

28687

... More
In 3rd Floor.

5.5

5323

29298

... More
In 4th Floor.

5.5

5434

29909

... More
In 5th Floor.

5.5

5567

30641

... More
In 6th Floor.

5.5

5700

31373

... More
In 7th Floor.

5.5

5833

32105

... More
In 8th Floor.

5.5

5966

32837

... More
In 9th Floor.

2.13

6099

12991

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, In 9th Floor Rough concrete for lift wall & Column.

7.66

5570

42673

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and rip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar 15 mm thick In 9th floor.

84.56

174

14760

... More
Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.

18.12

32

594

... More
Labour for Chipping of concrete surface before taking up Plastering work. 10 mm thick plaster.

84.56

21

1776

... More
Supplying, fitting & fixing granite slabs 15mm to 18 mm. thick with uniform texture & without decorative veins in columns, wall, facia,rise etc. with 15 mm thick [avg] cement mortar (1:2) including making suitable arrangements to hold the stones properly by brass / copper hooks including pointing in cement mortar (1:2) (1 white cement : 2 marble dust) with admixture of pigment matching the stone shades all complete as per direction of the Engineer-in-charge including cost of all materials, labours, scaffolding, staging, curing and roughening of concrete surface complete. [Using cement slurry at back side of granite @ 4.4 kg/sq.m & white cement slurry for joint filling @ 1.8 kg/sq.m] In ground floor (a) Area of each Granite slab 0.6 to 1.0 Square meter. In ground Floor.

33.48

2746

91942

... More
In 1st floor.

33.48

2758

92344

... More
In 2nd Floor.

33.48

2770

92745

... More
In 3rd Floor.

33.48

2782

93147

... More
In 4th Floor.

33.48

2794

93549

... More
In 5th Floor.

33.48

2810

94084

... More
In 6th Floor.

33.48

2826

94620

... More
In 7th Floor.

33.48

2842

95156

... More
In 8th Floor.

33.48

2858

95692

... More
Supplying 1.5mm thick M.S. sheet fitted and fixed on one or both faces of M.S./ W.I. gate etc. with point welding at not more than 150mm apart complete in all respect as per design including cost of all labour and materials.

4.41

1304

5751

... More
In 1st floor.

4.41

1304

5751

... More
In 2nd Floor.

4.41

1304

5751

... More
In 3rd Floor.

4.41

1304

5751

... More
In 4th Floor.

4.41

1304

5751

... More
In 5th Floor.

4.41

1304

5751

... More
In 6th Floor.

4.41

1304

5751

... More
In 7th Floor.

4.41

1304

5751

... More
In 8th Floor.

4.41

1304

5751

... More
(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs .(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr. In ground floor

0.71

9888

6981

... More
In 1st floor.

0.71

9986

7051

... More
In 2nd Floor.

0.71

10085

7121

... More
In 3rd Floor.

0.71

10184

7190

... More
In 4th Floor.

0.71

10283

7260

... More
In 5th Floor.

0.71

10407

7347

... More
In 6th Floor.

0.71

10530

7435

... More
In 7th Floor.

0.71

10654

7522

... More
In 8th Floor.

0.71

10777

7609

... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in- charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. I) For structural members of specified sections weighing less than 22.5 Kg./m For lift machine room.In 9th floor.

0.62

80226

49339

... More
(b) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.In ground floor.

126.99

29

3683

... More
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b)On steel or other metal surface :With super gloss (hi-gloss) -(iv)Two coats (with any shade except white)

126.99

79

10032

... More
Bailing or pumping out water from foundation trenches. From Lift Well.

33.97

2088

709

... More
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy

400

102

40800

... More
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1 Consider 150 gm should be used for 1 no. Nipple

60

882

52920

... More
Total Amount

-

-

-

... More
GST @ 18%

1

1

389569.68

... More
Cess @ 1%

1

1

25538.46



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.