Public Works Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Works Department - PWD Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date6 Sep 2024
Closing Date24 Sep 2024
Tender Amount₹ 8,10,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Annual Comprehensive Maintenace of 5TR concealled Split Airconditioning units Allocation :-Store Room ,Eye Seminar,CB roof, Eclaimsia (2), Gynae HDU(2) . = for 07 NOS unit Annual Comprehensive Maintenace of 5.5 TR Ductabel split type Airconditioning units Allocation :-Cheast RCU ,Covid CCU,Skill ,Hybrid CCU, LPOW(1), LG-II(2) = for 13 NOS unit

-

-

-

... More
Annual Comprehensive Maintenace of 8.5 TR Ductabel split type Airconditioning units Allocation :- hybrid CCU ,Children, LPOW(1) = for 7 NOS unit Annual Comprehensive Maintenace of 11 TR Ductabel split type Airconditioning units Allocation :-hybrid CCU ,Medine Seminar Room ,emergency ,SARI HDU, LG-II(2), Covid OT(2) = for 11 NOS unit

-

-

-

... More
Annual Comprehensive Maintenace of 16.5 TR Ductabel split type Airconditioning units Allocation :- generel emergency ,Hybrid CCU, = for 04 NOS unit

450

-

-

... More
NEGATIVE PRESSURE UNIT Covid CCU - 4 Units Hybrid CCU - 2 Units. Chest RCU - 2 Units PICU - 3 Units 7th Floor CCU - 5 Units AMC Negative pressure unit :-Singel skin centrifugal fan complte with DIDW-forward curved 1 phase/3 phase direct driven centrifugal blower motor 1.5 KW/2.5 KW .electrical panel , and oher all related items/spares (excluding VFD) Cleaning air pre/ micro filter /hefa filter twice in a month or as when requird

16

-

-

... More
Cleaning of Air Pre Filters

16

-

-

... More
Supply & Replacement 230V UV Lamp

16

-

-

... More
SCOPE OF WORK and TERMS & CONDITIONS 1) It includes corrective & preventive Maintenance of A.C Machines/Spare Parts incl compressor for Ensuing Uninterrupted & trouble-free performance of the Air-conditioning Machine round the clock. 2) Each unit must be provided atleast One routine service per month, which will be done by authorized Technicians.

-

-

-

... More
Routine service shall consist of the following: 3) Checking of motor bushing, electrical connections at machine terminals, clearing of coils, air filters, Oiling the fan motor and testing the unit for performance in terms of grille temperature, room temperature, current drawn, Drain line should be check & clean etc. after the service is carried out. 4) Gas pressure of AC machines should bechecked every month and noted at service report. 5) The Contract covers free replacement of all spare parts includingcompressor, capacitors, relays, thermostats, fan motors, electrical wiring the unit, indoor PCB, outdoor PCB, contactors,terminals and all others necessary parts which required at AC machine. In case there is a gas leak in the system,

-

-

-

... More
Agency shall carry out leak test and rectify the same. Pressure test, vacuums the system, gas charge the same at the site or at the authorized workshop. 6) In case of Replacement of Capacitors,BURST PROOF P2 TYPE CAPACITOR should be provided.

-

-

-

... More
7) The scope of this contract includes all plastic parts, remote controls,Repairing and Replacement of air filter,cabinet knob, knob cover, blower motor, condenser housing, Cooling coil thermostat switch ,selector switches, Swing motor, Base tray, internal wiring of AC unit etc. all others necessary parts which requiredas a result of wear & tear. 8) All the spare required to be replaced,should be of approved make. 9) The contract covers charging of refrigerant gas similar type provided in the original machine, as and when required. 10) Insulation of refrigerant lines ,if required,in case of Split A.C Machines have to be done by Agency.

-

-

-

... More
11) All the power circuit & control circuit inside the indoor & outdoor unit is required to check. 12) A log book will have to be maintained by the contractor in Department supplied format which shows grill Temperature, Room Temperature, Voltage, current, drain line insulation condition, gas back pressure , Condition of capacitor,Air Filter & Blower Motor is to be made Fortnightly . In case, any abnormal reading is noticed, then the same should be intimated to concerned Junior Engineer and rectify/set right immediately by taking prompt, appropriate & effective Measures/actions.Inspection findings & Action taken thereof should be recorded in the logbooks.

-

-

-

... More
13) In case of break-down of A.C. machines, the restoration should have to be done within 6 hours from the time of intimation of break down to concern contractor. If the machine is required to be removed / shifted to Workshop for more than 6 hours,then a temporary AC machine of same capacity will have to install to cool the work place & no extra claim will be entertain for this temporary AC machine arrangement & dismantling. If loan machine is not provided timely by agency, a penal amount of Rs. 100/-Only per machine per day will be deducted from the contractor’s bill till reinstallation of AC machine.

-

-

-

... More
14) Transportation charges for carrying A.C. machine(s) / spares parts from the site to work shop and vice versa as required will not be paid extra. 15) The philosophy of "Public Interest" would be THE MOTTO of this all-inclusive maintenance; any deviation may be viewed otherwise. 16) The agency will have to depute minimum 2 Nos AC Technician for day shift & 1Nos AC Technician for rest of the day including holidays under his direct supervision.

-

-

-

... More
17) Agency should maintain a separate attendance register (supplied by him& format as per pwd officer) & it will be section office of pwd. In case of absence of any ac technician alternative technician need to provided within one hour failing which charges for that day will be deducted from bill as per schedule per day rate. The executive engineer Kolkata north health electrical division p.w.d. reserve the right to terminate the contract in case of absence of a.c. technician for more than three consecutive days without showing further reason.

-

-

-

... More
18) Frequent change of A.C Technician is not allowed. The A.C Technician should be polite to all. 19) Any damage of parts due to negligence of technician of agency (if detected), will liable for penalty. Penalty amount is the actual cost of the same parts. 20) The contractor should have their office with Telephone number and Mobile number in Kolkataand the same should be intimated to this Department in writing, the telephone call should be responded without delay. 21) The agency should provide photo identity cards to all the maintenance staff employees including substitute’s employee(s) duly signed by concerned agency & JE.

-

-

-

... More
22) Valid license (if any), identity proof etc. are to be furnished for each Technicians in each time engaged by the agency along with the name &contact mobile no. of the personnel and all these information with supporting document are to be submitted in written to the concerned Junior Engineer before taking up the job or if any changes of staffs during job. 23) In case of any accident and/or physical illness of the staffs of the agency, while on duty, no claim will be entertained by this department and all responsibilities thereof should be shouldered by the agency only.

-

-

-

... More
24) No extra charges will be paid except the rate quoted by the agency as per unit per month basis for maintaining the above-described terms & conditions. 25) In case any urgency, Company should send appropriate technician for rectification within 2 hours from the intimation. 26) Agency should provide sufficient Tools and Tackles for smooth maintenance work.Zet Pump should be available at site.

-

-

-

... More
27) In case of any fault in Electrical line of A.C. machine, same to be informed to the floor Electrician and concerned Junior Engineer/Assistant Engineer without any delay. 28) According to the necessity as well as direction of the E.I.C., fault rectification & Machine shiftingjob may be required. 29) An additional Rs. 500/- per day will be deducted from the bill if any deviation from the terms and condition / scope of work is found. 30) The maintenance agency will be held responsible for any damages of the equipment due toimproper maintenanceor mishandling or lapses by him or his staff.

-

-

-

... More
31) Power and Water required for servicing or repair work, will be provided free of cost except handling of same items. 32) The bill for the work should be submitted on quarterly basis along with the photocopy of logbook. 33) In case any urgency, Company should send appropriate man for rectification.

-

-

-

... More
34) one call registerfor entering complains & time and action taken & time of rectification should maintain. Register supply will be in scope of agency & format will be provided by pwd officers. 35) Agency should provide required Tools and Tackles so as to carry out the maintenance work smoothly. 36) In case of any fault in Electrical line of A.C. machine, same to be informed to the floor Electrician without any delay, with a intimation to the concerned officer of PWD.

-

-

-

... More
37) Working condition of “TIMER SWITCH” in each machine should be checked by the contractor every day & if it is found non-functioning or in by-pass mode, it should be brought to the notice in writing to the je/ae (Electrical), P.W.D. Immediately and should be recorded in the log book. Everyday Junior Engineer (Electrical),P.W.D. will counter-sign the log-book. 38) The number of ac machine to be maintained as mentioned in schedule may be reduced for any administrative reason. However, payment will be done as per actual quantity executed.

-

-

-

... More
39) Agency must maintain all spares all time at the site. Minimum quantity of each spares should be two. All kind of refrigerant, should be available at site in 5kg quantity all time. Nitrogen cylinder with nitrogenmust be made available at site within two hours after getting call from the site.

-

-

-

... More
(Rate should be quotated including all taxes and duties and GST)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.