Public Works Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Works Department - PWD Tender

Services
Electrical Goods and Equipments
Electrical and Electronics
Electrical Works
Eprocure
Opening Date17 Jul 2023
Closing Date7 Aug 2023
Tender Amount₹ 36,01,842 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Temporary Ei Work Incl Hiring Of Dg Set For 04 Nos Light Tower 04 Nos Substations And Broadcasting

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(03 nos DG set X 6 match days for Utility service on match day in respect of cold run) and (04 nos DG for 04 light tower X 12 days (for 06 nos match day & 06 nos match day -1)) (3 X 6 + 4 X 12)=66 nos

66

-

-

... More
Supply & Providing on hire basis 415V, 62.5 kVA, 3 phase, 50 Hz silent type DG set/equivalent capacity of suitable generator of reputed make including proving of 1.1 kv grade of 4 core 50 sqmm AL/A cable (maximum length-250 mtr in each run) (From hiring DG to changeover, existing panel to changeover, change over to distribution panel), 4 nos10' GI Pipe earthing for neutral & Body using 50 sq. mm. Single core copper cable & dismantle the same after completion of event, including proper socketing, gland etc with suitable interconnection as per GS and provide sufficient manpower with tools & tackles for maintenance & operation arrangement of the installation around the clock.

-

-

-

... More
(01 nos DG set X 12 days) ( for dedicated power back up of Broadcasting on match day & before match day)

12

-

-

... More
S & providing of Diesel oil for dedicated DG sets 1. S & providing of Diesel oil for dedicated power back up of Utility. ( 01 no 750 kVA DG set) (75% load) ( 126 ltr/h x 3 hrs x 6 day)( Match day - 2 hours for testing & 01 hours for emergency )=2268 ltr 2. S & providing of Diesel oil for dedicated power back up of Utility . (3 nos 500kVA DG set) (80% load) ( 80 ltr/h x 3 hrs x 6 day X 3 nos) ( Match day - 2 hours for testing & 01 hours for emergency )=4320 ltr 3. S & providing of Diesel oil for dedicated for light tower. (4 nos 500kVA DG set) (80% load) ( 80 ltr/h x 6.5 hrs x 6 day X 4 nos) ( Day before Match day - 2 hours for testing & Match day-4.5 hours )=12480 ltr 4. S & providing of Diesel oil for dedicated power back up of Broadcasting. (01 no 62.5 kVA DG set) ( 20 ltr/h x 12h/Match x 6 day)(Match day - 8 hour and Day before match day - 4 hours for testing)= 1440 ltr. Total = 20508 ltr

20508

-

-

... More
Transportation & storage and pouring handling of Diesel oil.

20508

-

-

... More
Sub-Head I : Temporary allied Electrical Installation Supply & Providing of hire basis 415 V 4 Pole 125 A Onload Change Over Switch. (1no X 12 days)

12

-

-

... More
Providing on hire basis following main switches/MCB/porcelain fuse base distribution system/200A four bar busbar chamber etc. on a suitable iron frame including providing suitable interconnection wiring with socketing and 2 nos 50 mm dia 10 feet long earthing arrangements including interconnection. Dismantling at the end of program Elect. Comprising of the following acessories i) 415 V 4 Pole 125A MCCB with all acessories . ii) 415 v 200A TPN busbar chamber with 4 (four) bar. iii) 16 A MCB distribution system - 10 Nos. iv) 32 A TPN MCB distribution system - 3 Nos. v) Suitable covering arrangements for weather protection (1no X 12 days)

12

-

-

... More
Supply and fixing of 6/16 A combination power consisting 3 nos each board with 5 mtr extension cable at Boardcast Room. (10 no X 06 days)

60

-

-

... More
Supply & installation on Hire basis 30w LED Bulb with Holder (10 nos x 06 days) at Sequirity Checking Area (DFMD).

60

-

-

... More
Supply & installation on Hire basis 2 core 6sq. Mm. Al. Cable ( 800 mtr x 06 days)

4800

-

-

... More
Providing on hire basis outdoor type 3pin 6A Plug scoket with necessary interconnection wire 1.5 sq. mm. cupper wire for DFMD and Other areas. (60 nos x 06 days)

360

-

-

... More
Supply & installation on Hire basis 200 w LED Flood Light Fittings for different Cutouts (60 nos x 06 days)

360

-

-

... More
Supply & installation on Hire 2 x 2.5 sq mm + 1 x 1.5 sq. mm. Cu. Wire for lighting arrengment. (400 Mtr x 06 days)

2400

-

-

... More
Supplying & Providing on 600 mm sweep Pedestal Air Circulator.

105

-

-

... More
Supply and installation 16 A DP MCB with suitable enclosure on hire basis.(08 nos x 06 days)

48

-

-

... More
Supply and installation of pedestal fan with suitable enclosure on hire basis.(5 nos x 06 days)

30

-

-

... More
Note:- 1. Rate should be quoted inclusive of all taxes and duties including GST, 2. Original diesel filter is to be changed in each D.G. sets before each match, keeping sufficient time in hand, 3. Fuel is to be stored in the fuel tank of D.G. sets once at a time before starting of the game (before at least 5 hours) considering the match duration including extra time. Further addition of fuel will not be allowed during the playing time.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.