Public Works Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date13 Jan 2025
Closing Date22 Jan 2025
Tender Amount₹ 4,83,774
Costs
EMD
₹ 9,675Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Niet 15 Sl 03 Of 2024-2025 Of Ae/mhsd
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WBPWD_797822_3Bid Award Id
ViewTender No
NIeT-15/2024-25/AE/MHSDTender Authority
Public Works Department ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required.
113.88
214
24370.32
... More
Providing weep holes in Brick masonry Plain / Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of IV:20H towards drawing ace. Complete as per drawing and Technical specifications.
30
115
3450
... More
Sand filling in foundation trenches and at the back of abutments, wing-walls ete. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ranuming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge.
42
644
27069
... More
Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision),
5.4
644
3481.16
... More
Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in-charge.
154.08
880
135661.28
... More
Part-B: ROAD FURNITURE WORKS:
-
-
-
... More
Weaving wire matress as directed with wire of 4mm dia. And making sausage crate of required shape after tying all intersectiuons including jointing all longitudinal onds closing ends of sausage, camage of wire to site of work complete in all respect as per direction of the Engineer in Charge including cost of supply of GL wire (With 100mm 100mm mesh)
438.84
201
88206.84
... More
Road Delineators :Supplying and installation of delineators (rood wity indicators, hazard markers, object markers), 20-100 cm liigh above ground level, painted black and white in 15 cm wide επίρα, πανό with 10 x 100 mm rectangular or 75 mm dia ciroutar refectorised panais al We used of pressed into the ground and conforming to IRC-29 and the drawings Ran MORT & His specification 806)
20
386
7720
... More
Supplying fitting and fixing R.C. guard post 1.37m long with C.C. 1:2:4 with graded stone chips of 13.2mm down casting , curing complete including cost of providing 4nos.of 12mm dia. rod of length 1.54m as main reinforcement and 6 nos. of round shaped 8mm dia rods used as binders; the placing of the first binder should be at 75mm below the top finished surface and the other 5 nos of binders should be placed at 245mm c/c ; the guard post is of octagonal section with inscribed circle of dia 24cm at the base tapering to corresponding dimensions of 16cm at the top including two coats of painting with best quality synthetic enamel paint of approved make and grade to form 6 nos. horizontal alternate bands in white/tannery yellow and black to 90 cm length standing up above ground after mendinggood damages if any during striking off shuttering, making hole in ground of 47cm depth and 30cm minimum dia, fixing the guard posts in the same holes and repacking the earth properly so as to keep the guard posts standing properly erect in correct position true to line and length including carriage of R. C. Guard Post with due care to the site including loading into the truck and unloading at site complete in all respect.
With Pakur variety stone chips
42
698
29316
... More
Painting (one coat) guard posts with 6nos. of 16cm wide horizontal alternate band in different colours after the scrapping the surface free from old paint etc. as directed with best quality synthetic enamel paint of approved make and brand after fixing old existing guard post in correct position true to line and level with repacking the ground at base properly and mending good damages if necessary complete in all respect.
30
120
3600
... More
Part-C: CULVERT WORKS:
-
-
-
... More
Painting the vertical end faces of posts, wheel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with approved synthetic enamel paint b) Two Coats.
62.4
99
6177.6
... More
c) Reinforced Cement Concrete
7.24
-
-
... More
Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .
a) upto 3 m depth
(iv) Without pumping out water and shoring
205.59
-
-
... More
Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
(a) M-15 Grade.Using concrete mixer.
Use pakur variety stone materials.
71.89
-
-
... More
(b) M-20 Grade.Using concrete mixer.
Use pakur variety stone materials.
61.39
-
-
... More
Furnishing and Placing Reinforced / Pre-stressed Cement concrete in Super-structure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement and admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete. as per drawing and technical specifications.
RCC Grade M30
(i) For solid slab super-structure
a) Height upto 5m
Use Pakur variety stone materials.
39.5
-
-
... More
Plain / Reinforced Cement Concrete in Substructure
with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications.
RCC Grade M25
(i) Height upto 5m
I) Using concrete Mixer
Use pakur variety stone materials.
12.84
-
-
... More
Plain / Reinforced Cement Concrete in Open
foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications.
RCC Grade M25
I) Using concrete mixer
Use pakur variety stone materials.
18.55
-
-
... More
Supplying, fitting and placing un-coated HYSD bar
reinforcement in Bridge Foundation including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge.
(SUPPLIED BY AGENCY sail/Tata/Rinl)
1.6
-
-
... More
Supplying, fitting and placing HYSD bar
reinforcement in Sub-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge.
(SUPPLIED BY AGENCY sail/Tata/Rinl)
1.12
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less
than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications.
(SUPPLIED BY AGENCY sail/Tata/Rinl)
3.41
-
-
... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
(b) Where staging is not required.
278.18
-
-
... More
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.
100
-
-
... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design in Double Row Providing and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in double row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD.
(C) 1200 mm dia
5
-
-
... More
Painting the vertical end faces of posts, wheel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with approved synthetic enamel paint.
b) Two Coats
43.07
-
-
... More
Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge.
218.73
-
-
... More
Part-D: PROTECTIVE WORKS:
-
-
-
... More
Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .
a) upto 3 m depth
(iv) Without pumping out water and shoring
157.9
-
-
... More
Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge.
249.6
-
-
... More
Weaving wire mattress as directed with wire of 4mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the Engineer-in-charge including cost of supply of G.I. wire. (With 100mm x 100mm mesh.)
757.08
-
-
... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications.
I. Stone/Boulder
15
-
-
... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification.
7.5
-
-
... More
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulder Laid Dry Without Wire Crates.
27.9
-
-
... More
Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the
Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
(a) M-15 Grade
Using concrete mixer.
Use pakur variety stone materials.
32.38
-
-
... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
(b) Where staging is not required.
106.38
-
-
... More
Close Bamboo Walling made of 65mm to 75mm dia. bamboos (in single line) driven about half-length into the ground side by side, with stout stays at an interval of 1m, 3nos. of half split bamboo runner of same dia fitted and fixed with nails etc. complete as per
direction. (Measurement to be taken along the length of piling after finishing the works). (i) With bamboos of length upto 2.00m
50
-
-
... More
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags.
250
-
-
... More
Add GST
18
405918
73065.41
... More
Add Labour Welfare Cess
1
478984
4789.84
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements