Public Works Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Works Department - PWD Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date22 Nov 2024
Closing Date6 Dec 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Wbpwd/sewec /bed /niq-82 /2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ii) Fully digital control with three Digital Signal Processor including rectifier, Invertor, Charger. Protections Advanced electronic protection for device safety backed with MCBs, Fast acting fuses, High speed pulse blanking.

-

-

-

... More
iii) Input power factor to load0.99

-

-

-

... More
iv) Main back feed protection

-

-

-

... More
v) Lightning Protection Device

-

-

-

... More
Overload Capacity

-

-

-

... More
110% for 10 minutes, 125% for 1 minutes, 150% for 5 Second. 103% for continious.

-

-

-

... More
UPS Display Panel

-

-

-

... More
The Display panel should capable for display of following measurement/ as per standard availability of specified manufacturer.

-

-

-

... More
i) Input - Voltage/ Frequency/ Current.

-

-

-

... More
ii) By- pass - Voltage/ Frequency.

-

-

-

... More
iii) Output - Voltage/ Frequency/ Current.

-

-

-

... More
iv) Battery - Voltage/ Current/ history data/ residual capacity/ charging status.

-

-

-

... More
v) Load - KVA/ KW/ Percentage

-

-

-

... More
vi) Others standard measurement as per manufacturer standard & IS specification.

-

-

-

... More
B) The display panel should also capable to display following indication

-

-

-

... More
i) DC bus boltage - High/ Low

-

-

-

... More
ii) Inverter - Overload / Short Circuit/ Low

-

-

-

... More
iii) Over Temperature -Battery / By-pass/ Inverter

-

-

-

... More
iv) Fault - Rectifier/ By-pass / Inverter/ Paralleling

-

-

-

... More
v) Fuse failure- Input / Output

-

-

-

... More
vi) Battery - Low/ Overcharged

-

-

-

... More
vii) Mains - On / Fail / High / Low / Single Phasing

-

-

-

... More
Switchgear:

-

-

-

... More
MCB / MCCB for Input, Battery, Output & Manual Bypass Switch.

-

-

-

... More
Alarms

-

-

-

... More
The UPS should generates an audioble alarm for following condition.

-

-

-

... More
Mains failour

-

-

-

... More
Battery Low

-

-

-

... More
UPS Over Load (_ 110 %)

-

-

-

... More
Fault

-

-

-

... More
Shout Down

-

-

-

... More
Battery Bank / Charger/ Rack

-

-

-

... More
i) Minimum charger rating- 10% of battery AH rating offered

-

-

-

... More
ii) Battery recharge time (after complete discharge) to 90% capacity -8-10 Hrs.

-

-

-

... More
iii) Battery Protection - DC MCCB (Internal/ External)

-

-

-

... More
iv) Battery End Cell Voltage - 1.75 V

-

-

-

... More
v) The UPS battery shall be of Advanced Glass Mat Valve Regulated Sealed Lead Acid Battery Construction type (AGM or VRSLAB) in ABS Flame Retardant (UL94V-O) grade (UL 2436) spill containment casing to meet UL 62368-1/IEC 62133 or equivalent standards type.

-

-

-

... More
vi) Automatic float cum boost charging capability with settable float & boost charging voltage & current levels and boots charger time.

-

-

-

... More
UPS Physical Condition

-

-

-

... More
i) Operating Temperature- 40°C

-

-

-

... More
ii) Humidity: 90% RH (Non Conditioning)

-

-

-

... More
iii) Protection Class - IP-20

-

-

-

... More
iv) Type of Cooling - Forced Air

-

-

-

... More
v) Noice Level - 60db at 1 mtr distance

-

-

-

... More
vi) All the electronic cards inside shall be with conformal coating to protect from harsh / Moist environment.

-

-

-

... More
vii) UPS panel should have Dust filter protection with sensor.

-

-

-

... More
viii) Monitoring Software: UPS Monitoring Software on Windows XP Platform

-

-

-

... More
ix) Communication: RS 232, RS 485, SNMP Provided

-

-

-

... More
x) Remote Monitoring features available.

-

-

-

... More
Certification

-

-

-

... More
ISO 9001: 2015, ISO 14001: 2015, ISO 18001, OHSAS 18001 CE Marking:IEC/EN 62040-1-1, IEC/EN 62040-2(EMC Emission),IEC/EN 62040-3(performance & Design)

-

-

-

... More
Static Bypass Switch :-

-

-

-

... More
i) The static shall consist of fully rated Silicon Controlled Rectifiers (SCRs)

-

-

-

... More
ii) The static bypass switch shall automatically transfer the critical load to bypass input supply without interruption after the logic senses one of the following conditions Inverter overload beyond rating. Battery runtime expired and bypass available. Inverter failure. Fatal error in control system.

-

-

-

... More
iii) The static bypass switch shall be equipped with a manual means of transferring the load to bypass and back to inverter.

-

-

-

... More
iv) Also UPS should have separate manual bypas switch.

-

-

-

... More
Terms & Condition

-

-

-

... More
i) Any Problem must be set right with 24 hrs after reporting.

-

-

-

... More
ii) Two mobile nos of different responsible person must be specified alongwith offer for reporting of problems in future.

-

-

-

... More
Carrying cost of battery and UPS to Burdwan site along with installation, fitting & fixing of accessories etc.

3

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.