Public Works Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Works Department - PWD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date23 Dec 2024
Closing Date9 Jan 2025
Tender Amount₹ 2,18,464 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(a) In ground floor including roof. (Add. above ground floor - 1st. floor)

3.85

2390

9204

... More
(a) In ground floor including roof. (Add. above ground floor - 2nd floor)

3.85

2450

9434

... More
(a) In ground floor including roof. (Add. above ground floor - 3rd floor)

3.85

2509

9663

... More
(a) In ground floor including roof. (Add. above ground floor - 4th floor)

3.85

2569

9893

... More
(a) In ground floor including roof. (Add. above ground floor - 5th floor)

3.85

2629

10122

... More
(a) In ground floor including roof. (Add. above ground floor - 6th floor)

3.85

2688

10351

... More
Removal of rubbish, earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal/Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge.

40.46

197

8005

... More
Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150grams per sq. metre (followed by colour coated on both side) steel sheetwork having minimum yield strength of 550 Mpa of trapizoidal profile ofapproved make as per IS: 15965: 2012 and IS: 14246: 2013 (excludingthe supporting frame work) fitted and fixed with 55 mm & 25 mm selftapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc.complete with 150 mm end lap and one corrugation minimum side lap.(Payment to be made on area of finished work). In roof With .5mm thick sheet.

74.25

937

69643

... More
(A) M.S. structural works with hollow in roof trusses with tubular sections (TATA make suare or rectangular shape conforming to IS: 806- 1957 & IS: 1161- 1958) connected to one another with bracket,gusset,cleats as per design, drawing & direction of Engineer-In-Charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816- 1956 & IS: 9595 using electrodes of approved make and brand conforming to IS: 814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour required for execution and all incidental charges (such as electricity, labour insurance) etc. complete.(Payment to be made on the basis of calculated weight of structural members of M.S. Hollow section as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of suc

-

-

-

... More
(i) For roof truss works.

-

-

-

... More
(a) Span up to 12 Mtr.

0.28

86186

24128

... More
Welding in M.S. structural work with gas or electric:

-

-

-

... More
(b) Continuous weld.

445

10

4775

... More
(a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.

17.68

34

611

... More
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand parpering etc. in cluding using of approved putty etc. on the surface , if necessary.

-

-

-

... More
(b) On steel or other metal surface: .

-

-

-

... More
(1) With super gloss (hi-gloss).

-

-

-

... More
(iv) Two coats (with any shade except white).

17.68

94

1665

... More
Supplying, fitting& fixing double layer nylon thread net (1mmthick 16mmx16mm grid coverage of 3.75Sqm/kg and 1mm thick 60mm x60mm grid coverage of 7.50Sqm/kg)for exterior scaffolding safety purpose with peripheral nylon thread or rope including fabrication cost & other finishing cost.Therate includes thecostofmaterials,labour & lifting charges complete in all respect as per drawing,design and instruction of the Engineer-in-Charge.

64

263

16892

... More
Making one set of scaffolding only for replacing glass panels, painting,uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge.(This item should be executed only after prior approval of the Engineer-incharge).Firstly, one number to be paid and then labour rate for shifting up tofurther nineteenth (19) times @ 10% each time to be considered. If necessaryfurther after twenty times of total use, another one number new and labourrate for shifting to be considered accordingly.

-

-

-

... More
3.90 metre height

4

2084

8338

... More
Shifting

57

208

11882



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.