Public Works Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Works Department - PWD Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date28 Aug 2024
Closing Date17 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing on hire basis 415V, bus bar chamber comprising of 4 nos. copper bars of 500 A capacity, fixed on angle iron frame including necessary interconnection wiring along with termination by socketing the cable/wire ends and 2 nos earthing attachment and dismantling the same after completion of the programme..(with PWD / E.I.C. approved materials)(Upto 5 days)

16

-

-

... More
Providing on hire basis 415V, bus bar chamber comprising of 4 nos. copper bars of 800 A capacity, fixed on angle iron frame including necessary interconnection wiring along with termination by socketing the cable/wire ends and 2 nos earthing attachment and dismantling the same after completion of the programme..(with PWD / E.I.C. approved materials)(Upto 5 days)

5

-

-

... More
Providing and installation on hire basis 500 V , 160Amp MCCB as incomer with 63Amp or 32Amp or 16 Amp per way, 8 Way TPNMCBDB with all arrangement in a outdoor type pillar box incl interconnection with proper socketing and dismantling as direcyted by EIC after the programme(Upto 5 days)

48

-

-

... More
Providing on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. Providing interconnection wiring with socketing, earthing attachment etc. and dismentaling at the of end function (with PWD / E.I.C. approved materials)(Upto 5 days)

-

-

-

... More
240V, 2+12 Way SPNBDB With 6 - 32 amp SPMCB as Outgoing & 40/63 amp DPMCB as Incoming

12

-

-

... More
Providing on hire basis 500V, 250A on load change over switch on angle iron frame erected on the ground / wall with necessary support incl. interconnection wiring,2 nos earthing attachment socketing,& dismantling the same after completion of the program.(with PWD / E.I.C. approved materials).(Upto 5 days)

16

-

-

... More
Providing on hire basis 500V, 400A on load change over switch on angle iron frame erected on the ground / wall with necessary support incl. interconnection wiring,2 nos earthing attachment socketing,& dismantling the same after completion of the program.(with PWD / E.I.C. approved materials).(Upto 5 days)

5

-

-

... More
Providing and installation on hire basis 500 V, 63Amp/32Amp 4 Pole MCB fixed on sheet metal box with proper socketing and dismantling as directed by EIC after the programme(Upto 5 days)

76

-

-

... More
Supplying & Drawing on Hire Basis following size single core PVC insulated, unsheathed, multistrand 1.1Kv grade, copper/Al wire including necessary termination by socketing the wire ends & dismantling the same after completion of the program.(with PWD / E.I.C. approved materials)(Upto 5 days)

-

-

-

... More
4 X [7/0.064(7/16) Single Core ]

13000

-

-

... More
3 X [7/0.036(7/20) single core]

7300

-

-

... More
Providing on hire basis main wiring with 1.1 KV grade Aluminium Conductor PVC / XLPE armoured cable of following size including laying in trench (at least 230 mm below ground) including socketing and necessary finishing as required and dismantling the same and mending good the damages.(Upto 5 days)

-

-

-

... More
4C X 6 Sqmm Cu Cable

3000

-

-

... More
4C X 16 Sqmm AL cable

4000

-

-

... More
4C X 50 Sqmm AL cable

2500

-

-

... More
4C X 95 Sqmm AL cable

2000

-

-

... More
4C X 185 Sqmm AL cable

1500

-

-

... More
Providing and Fixing on hire basis following lights complete with all accessories and dismantling as directed by EIC after the programme(Upto 5 days)

-

-

-

... More
LED Tube light 4ft Box type 40 Watt

3200

-

-

... More
20 Watt LED Bulb with holder

20

-

-

... More
9 Watt LED Bulb with holder

200

-

-

... More
Providing and Fixing on hire basis following LED Flood light fittings including clamp and necessary accessories and dismantling as directed by EIC after the programme(Upto 5 days)

-

-

-

... More
Minimum 200 Watt LED Flood fittings.(Crompon/Philips/Bajaj/Nordusk)

1060

-

-

... More
Supplying & providing on hire basis full metal body 240V, 600mm dia air-circulator pedestal fan complete with 3 pin 5A plug top, 3 core copper wire cord, body earthing & dismantling the same after completion of the program.(Upto 5 days)

1700

-

-

... More
Transportation charge for the materials from Company's godown to Site and return back to godown after use.

1

-

-

... More
Supplying & providing on Hire basis 1 no Seperate 6 amp plug and Switch with 150X100X65mm MS/TW switch Board including necy. wiring in 3 x 1.5 sq mm single core PVC insulated, unsheathed, multistrand copper wire (avg. Length 5 mtr) & dismantling the same after completion of the program.(Upto 5 days)

2100

-

-

... More
Supplying & providing on Hire basis 1 no Seperate 20 amp plug and Switch with 150X100X65mm MS/TW switch Board including necy. wiring in 3 x 2.5 sq mm single core PVC insulated, unsheathed, multistrand copper wire (avg. Length 5 mtr) & dismantling the same after completion of the program.(Upto 5 days)

200

-

-

... More
Supply & providing on hire basis Earthing with 50 mm dia GI pipe 2.5 to 3 mtrs long and 6/8 SWG GI wire with galvanized nut and boltss washer etc. below the ground level & dismantling the same(Upto 5 days)

220

-

-

... More
Providing and installation on hire basis min 4 Ton Tower type AC Machine complete with all necy arrangements and dismantling as direcyted by EIC after the programme.(Upto 5 days)

70

-

-

... More
Supply and installation of 8.5 TR Ductable type Air Conditioning machine on hire basis(Upto 5 days)

4

-

-

... More
Ducting as required(Upto 5 days)

30

-

-

... More
Ducting Insulation with nitrile insulation and fixing with adhesive(Upto 5 days)

30

-

-

... More
Diffuser Grill as required (Upto 5 days)

12

-

-

... More
Transportation charge for the materials from Company's godown to Site and return back to godown after use.

1

-

-

... More
Supplying & Providing on hire basis 415V, 3 Phase CPCB approved soundless diesel generator set for prime/standby operation with mobil incl. transportation ,one operator & appropriate size of cable upto 120 Mtrs including necessary interconnection, socketing & dismantling as directed by EIC after the program. If the DGs are not placed at site on time , pro rata rate will be reduced from bill.( For Programme & Rehearsal)

-

-

-

... More
250 KVA-08 Sets (For Each Single Day upto 3 Days)

3

-

-

... More
250 KVA-08 Sets (For Each Single Day more than 3 Days)

2

-

-

... More
125 KVA-14 Sets (For Each Single Day upto 3 Days)

3

-

-

... More
125 KVA-14 Sets (For Each Single Day more than 3 Days)

2

-

-

... More
62.5 KVA-10 Sets(For Each Single Day upto 3 Days)

3

-

-

... More
62.5 KVA-10 Sets( For Each Single Day more than 3 Days)

2

-

-

... More
Charges for making temoporary rain shed for protecting all the above electrical panels, Main switches, DBs, Changeover switches etc from rain water.

16

-

-

... More
Deployment of 15 no. Skilled Electrician,06 No AC Technician & 21 no. Helper per shift per day (i.e. Total 45 nos Electrician,18 nos AC technician & 63 nos Helper per day ) for carring out all kind of EI operation , & proper upkeepment and preventing any unwanted incidents like theft, willful damage etc. (no additional charge will be paid for any unwanted incidents)

3

-

-

... More
18 % GST on the total amount from SL no 1 to 27.

1

-

-

... More
Supply and pouring of HSD for the hired DG set incl. handing cost.(The measurement will be done after considering all technical aspect,orginal invoice & log book)

20315

-

-

... More
Special Terms and conditions for Temporary E.I. Work - 1) Earthing should conform to IS specification. Earth Continuity wire should not be broken / Jointed. Single Earth continuity wire should be used from Earth Bus-Bar to the installation. 2) All 3ɸ Electrical Panel Should be earthed by two nos. of separate earthing and 1ɸ panel should be earthed by one no earthing. 3) MCB / Rewirable Fuse type Distrubution Board should be installed with proper Trip Current setting / fuse wires. However, MCB type DBs are preferable. 4) No Part of the Electrical Circuit in the pandal / Structure shall be within 12 inches of any decorative cloth / paper. 5) Ordinary Flexible wires should not be used. Only new PVC insulated & sheathed wires (Bearing ISI mark) or PVC insulated wires of FRLS (Fire Resistant Low Smoke) type (ISI Marked) are allowed. 6) All cable ends should be properly sockedted. 7) All joints shall be made with porceline insulated connectors. Twisted & lapped joints shall be avoided. But Joints are strictly not allowed in the dias. 8) Cables / Wires should run along outside the Dias. 9) Ceiling fan (s) / Electrical fittings must not be suspended from the ceiling of Dias. Pedestal fans are not allowed on the Dias. However, Pedestal fans may be installed outside dias, but the body of the fan must be properly earthed.

-

-

-

... More
10) T/L fittings shall be of box type (Indoor commercial type). Any kind of open type fittings must be avoided. 11) Each A.C. Machine should be connected with a separate circuit and earthing should be provided by separate single earth contunuity wire from Earth Bus-bar. 12) P.A. System and Microphone shoud be earthed. 13) Sufficient quantity of Fire Extinguishers and First Aid Box should be provided. 14) If the DGs are not placed at site on time pro rata rate will be reduced from bill. 15) The guarding /security arrangement of all the hired products /installation has to be made by the successful bidder at his/their own cost and responsibility. No additional charge will be paid for any unwanted incidents like theft, damage due to natural calamities or any other reasons whatsoever. 16) During entire hiring period any fault to the hired installation shall be rectified/faulty items replaced, at the cost of agency. Suitable man power for attending and rectification/replacement of damaged items has to be provided by the agency at their own cost. Rectification time is 1 hour for the event day and upto 2hrs for other days. 17) A test certificate cum safety certificate is to be provided by the agency, duly signed by the Supervisor of the agency after completion of installation. 18) A performance guarantee of hired DG sets and AC machines has to be provided by the agency after completion.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.