Public Works Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Works Department - PWD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date2 Jul 2024
Closing Date19 Aug 2024
Tender Amount₹ 1,00,18,200 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 2,35,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WBPWD_705309_1Bid Award Id
ViewTender No
PWD/SE/KEC/NIT06/24-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Proposed new Integrated Science and Technology campus of University of Calcutta at Rajarhat-Construction of G plus 7 storied Bldg (Tower 4) and Construction of G plus 3 storied New Building (Tower 3)-SITC of 5 nos 15 passenger Lift.
BOQ Items
... More
Load : 15 Passenger / 1020 Kg
-
-
-
... More
Control: Microprocessor based with AC variable voltage & variable frequency ( VVVF).
-
-
-
... More
Machine:- Energy efficient machine, Gearless, Without Machine Room.
-
-
-
... More
Speed: 1.5 Mtrs./ Sec
-
-
-
... More
Floor served: G+7
-
-
-
... More
Landing: 8 lands, all on same side
-
-
-
... More
Total Rise : 25.7 Mtr (Approx) [Bidder should visit the site]
-
-
-
... More
Operation: Microprocessor based simplex full collective with or without attendant.
-
-
-
... More
Signals: Digital car position indicator,car travels direction indicator in car & at all landing with call registration indicator.
-
-
-
... More
Travelling accuracy: ± 5 mm (Micro levelling arrangement)
-
-
-
... More
CAR
-
-
-
... More
Car inside: 1500 mm ( W ) x 2400 mm ( D ) x 2200 mm (H) or as per manufacturer's standard conforming to IS
-
-
-
... More
Car Entrance: Clear Opening 900mm (W) X 2000mm (H) protected with car door.
-
-
-
... More
Car Enclosure: Stainless Steel sheet (20 SWG) with Hairline finish with hand rail.
-
-
-
... More
Car Ceiling & Lighting: Stainless Steel with hairline finish with LED lighting and Fan.
-
-
-
... More
Car Ventilation: Pressure fan with anodised aluminium grill.
-
-
-
... More
Car Flooring: Decorative granite flooring (As per direcion of EIC and according to this Department's Order).
-
-
-
... More
Car Door: Stainless Steel centre opening automatic door provided with V3F controlled door drive system.
-
-
-
... More
Landing Door: Stainless steel centre opening automatic door provided with V3F controlled door drive system.
-
-
-
... More
Door Opening: Automatic power oprated door with full length Photocell assembly infrared light curtain sensor.
-
-
-
... More
Car operating panel: A best quality Screen touch car operating panel with floor indication and digital hall position & direction indicatiors.
-
-
-
... More
Landing operating panel: A best quality Screen touch car operating panel with floor indication and digital hall position & direction indicatiors.
-
-
-
... More
Fire Rated Door: 2 Hours
-
-
-
... More
PROTECTIVE DEVICES & OTHER ACESSORIES
-
-
-
... More
ARD: Automatic rescue device complete with dry maintenance free batteries as required for automatic evacuation to the nearest floor in case of power failure / single phasing/others.
-
-
-
... More
Overload Protection: Fully loaded with overload protection. On overloading condition the lift car will not start with door remaining open and give audio & display indication.
-
-
-
... More
Emergency lighting in car: Battery operated emergency lighting in the lift car.
-
-
-
... More
Intercom system: Battery operated Intercom System in Lift Car, Machine Room & Control Room.
-
-
-
... More
Emergency Alarm: Battery operated alarm bell system in lift car and control room.
-
-
-
... More
Fireman switch: Fireman switch at main landing terminal.
-
-
-
... More
Voice Synthesizer: Voice announcement system (Voice Synthesizer) in the car to announce the position of the elevator in the hoist way as the car passes or stops at a floor served by the elevator.
-
-
-
... More
Main rope - Belt Type (Flat Coated steel belt with V groove / Steel rope)
-
-
-
... More
Communication & Monitoring the Lift : Lift controller/ Panel shall be Ethernet/Modbus ready with necessary converter, DC Power supply module etc. if required, and there should be single Ethernet/Modbus output from the Controller/panel and the same should be connected to BMS (Building Management System) and the controller/ panel should have also required for monitoring of real time data with date & time, maintenance-call back record, Mantrap notice, call records, location of car, Lift room temperature etc. should be noticed & display to in any desktop & mobile though wireless system.
-
-
-
... More
Other works: Necessary cutting of wall/floor for fixing the Fire Alarm switch, all Button switch and also making provision to entry of rope, electric wire etc. as required to complete the job.
-
-
-
... More
DIMENSION OF SHAFT & POWER SUPPLY
-
-
-
... More
Available Shaft Dimension: 2000 (W) mm X 3000 (D) mm (Bidder should visit the site)
-
-
-
... More
Pit Depth : 1600 mm (Bidder should visit the site)
-
-
-
... More
Overhead : 4200 mm (Bidder should visit the site)
-
-
-
... More
Electric power supply: AC 415V, 3Phase, 50Hz terminated at top floor adjacent to lift as per IS.
-
-
-
... More
SITC of Automatic Lift (as per manufacturer design & as per detailed spectfication below conforming to IS) and putting into operation after final testing in the existing lift shaft complete with all accessories and reparing the damaged wall /floor if any etc to complete as required.
2
-
-
... More
Make : OTIS / KONE/SCHINDLER
-
-
-
... More
Type: Passenger Lift.
-
-
-
... More
Load : 15 Passenger / 1020 Kg
-
-
-
... More
Control: Microprocessor based with AC variable voltage & variable frequency ( VVVF).
-
-
-
... More
Machine:- Energy efficient machine, Gearless, Without Machine Room.
-
-
-
... More
Speed: 1 Mtrs./ Sec
-
-
-
... More
Floor served: G+3
-
-
-
... More
Landing: 4 lands, all on same side
-
-
-
... More
Total Rise : 10.95 Mtr (Approx) [Bidder should visit the site]
-
-
-
... More
Operation: Microprocessor based simplex full collective with or without attendant.
-
-
-
... More
Signals: Digital car position indicator,car travels direction indicator in car & at all landing with call registration indicator.
-
-
-
... More
Travelling accuracy: ± 5 mm (Micro levelling arrangement)
-
-
-
... More
CAR
-
-
-
... More
Car inside: 2000 mm ( W ) x 2400 mm ( D ) x 2200 mm (H) or as per manufacturer's standard conforming to IS
-
-
-
... More
Car Entrance: Clear Opening 900mm (W) X 2000mm (H) protected with car door.
-
-
-
... More
Car Enclosure: Stainless Steel sheet (20 SWG) with Hairline finish with hand rail.
-
-
-
... More
Car Ceiling & Lighting: Stainless Steel with hairline finish with LED lighting and Fan.
-
-
-
... More
Car Ventilation: Pressure fan with anodised aluminium grill.
-
-
-
... More
Car Flooring: Decorative granite flooring (As per direcion of EIC and according to this Department's Order).
-
-
-
... More
Car Door: Stainless Steel centre opening automatic door provided with V3F controlled door drive system.
-
-
-
... More
Landing Door: Stainless steel centre opening automatic door provided with V3F controlled door drive system.
-
-
-
... More
Door Opening: Automatic power oprated door with full length Photocell assembly infrared light curtain sensor.
-
-
-
... More
Car operating panel: A best quality Screen touch car operating panel with floor indication and digital hall position & direction indicatiors.
-
-
-
... More
Landing operating panel: A best quality Screen touch car operating panel with floor indication and digital hall position & direction indicatiors.
-
-
-
... More
Fire Rated Door: 2 Hours
-
-
-
... More
PROTECTIVE DEVICES & OTHER ACESSORIES
-
-
-
... More
ARD: Automatic rescue device complete with dry maintenance free batteries as required for automatic evacuation to the nearest floor in case of power failure / single phasing/others.
-
-
-
... More
Overload Protection: Fully loaded with overload protection. On overloading condition the lift car will not start with door remaining open and give audio & display indication.
-
-
-
... More
Emergency lighting in car: Battery operated emergency lighting in the lift car.
-
-
-
... More
Intercom system: Battery operated Intercom System in Lift Car, Machine Room & Control Room.
-
-
-
... More
Emergency Alarm: Battery operated alarm bell system in lift car and control room.
-
-
-
... More
Fireman switch: Fireman switch at main landing terminal.
-
-
-
... More
Voice Synthesizer: Voice announcement system (Voice Synthesizer) in the car to announce the position of the elevator in the hoist way as the car passes or stops at a floor served by the elevator.
-
-
-
... More
Main rope - Belt Type (Flat Coated steel belt with V groove / Steel rope)
-
-
-
... More
Communication & Monitoring the Lift : Lift controller/ Panel shall be Ethernet/Modbus ready with necessary converter, DC Power supply module etc. if required, and there should be single Ethernet/Modbus output from the Controller/panel and the same should be connected to BMS (Building Management System) and the controller/ panel should have also required for monitoring of real time data with date & time, maintenance-call back record, Mantrap notice, call records, location of car, Lift room temperature etc. should be noticed & display to in any desktop & mobile though wireless system.
-
-
-
... More
Other works: Necessary cutting of wall/floor for fixing the Fire Alarm switch, all Button switch and also making provision to entry of rope, electric wire etc. as required to complete the job.
-
-
-
... More
DIMENSION OF SHAFT & POWER SUPPLY
-
-
-
... More
Available Shaft Dimension: 2000 (W) mm X 2750 (D) mm (Bidder should visit the site)
-
-
-
... More
Pit Depth : 1600 mm (Bidder should visit the site)
-
-
-
... More
Overhead : 4200 mm (Bidder should visit the site)
-
-
-
... More
Electric power supply: AC 415V, 3Phase, 50Hz terminated at top floor adjacent to lift as per IS.
-
-
-
... More
Terms & Condition
-
-
-
... More
i) The Agency must procure the materials from the Manufacturer / OEM or from their authorised sales channel so that the standard warranty / support of the Manufacturer / OEM becomes applicable to the products to be delivered and installed by them.
-
-
-
... More
ii) Documents that authenticates such procurement from the Manufacturer / OEM or from their authorized sales channel and standard warranty / support should be sent from the e-mail of the Manufacturer / OEM / authorized sales channel to the e-mail of Engineer-in-Charge and hard copy of it to be submitted during execution, of work/submission of bill.
-
-
-
... More
iii) The rate quoted by the manufacturer should be inclusive of cost for providing 2 years DLP after completion of 1 year of initial commisioning.
-
-
-
... More
iv) Rates should be quoted with minor civil works, wall cutting and mending good the damages to the original finish.
(Rates should be inclusive of all Taxes & Duties)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements