Public Works Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Works Department - PWD Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date27 Nov 2024
Closing Date11 Dec 2024
Tender Amount₹ 62,48,008
Costs
EMD
₹ 1,24,960Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Temporary E.i Work___milan Mela Mela
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDE_775185_1Tender No
WBPWD/EE/40/IR/T/KCED/II of 2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://wbpwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
415V, 300 amp TPN switch with HRC fuse (For upto 3 days)
3
-
-
415V, 300 amp TPN switch with HRC fuse Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 3 Nos x 5 No of Days= 15 Nos)
15
-
-
415V, 200 amp TPN switch with HRC fuse (For upto 3 days)
6
-
-
415V, 200 amp TPN switch with HRC fuse Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 6 Nos x 5 No of Days= 30 Nos)
30
-
-
415V, 100 amp TPN switch with HRC fuse (For upto 3 days)
12
-
-
415V, 100 amp TPN switch with HRC fuse Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 12 Nos x 5 No of Days= 60 Nos)
60
-
-
415V, 63 amp TPN switch with rewirable fuse (For upto 3 days)
8
-
-
415V, 63 amp TPN switch with rewirable fuse Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 8 Nos x 5 No of Days= 40 Nos)
40
-
-
415V, 32 amp TPN switch with rewirable fuse (For upto 3 days)
7
-
-
415V, 32 amp TPN switch with rewirable fuse Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 7 Nos x 5 No of Days= 35 Nos)
35
-
-
415V, 32 amp DP switch with rewirable fuse (For upto 3 days)
7
-
-
415V, 32 amp DP switch with rewirable fuse Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 7 Nos x 5 No of Days= 35 Nos)
35
-
-
Providing on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. Providing inter-connection wiring with socketing, earthing attachment etc. and dismentaling at the of end function (with PWD / E.I.C. approved materials)
-
-
-
415V, 200 amp, Offload Change Over Switch
(For upto 3 days)
6
-
-
415V, 200 amp, Offload Change Over Switch
Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 6 Nos x 5 No of Days= 30 Nos)
30
-
-
S & Installation on hire basis following switches etc. and fixing on wooden plank board or suitable angle iron frame incl. providing inter connection , Socketing, earthing attachment etc & dismantling the same after completion of work( with PWD approve materials) Incoming: (a) 415/220volt, 300Amp. TPNIC/ DP Main switch with HRC Fuse-1(one) No. (b) 415/220volt, 200Amp. FP/ DP Change over switch -1(one) No. (c) 415 volt, 400 Amp.capacity Busbar Chamber with 4 Nos. Cu/ Al Bar- 1 No. Out going: (a) 415/220 volt, 100Amp. TPNIC/ DP Main switch with HRC Fuse-3(Three) No. (b) 415/220 volt, 63 Amp. TPNIC/ DP Main switch with HRC Fuse-6 ( six ) No. (c)RYB indicating lamp-3 Nos. (d) E.I. Danger Board-1 No . (e) Volt meter (0-600 volt) with selector Switch-1 No.
-
-
-
Up to 3 days.
2
-
-
(Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 2 Nos x 5 No of Days=10 Nos)
10
-
-
Providing on hire basis following Distribution boards etcand fixing on wooden plank board or suitable angle iron frame incl. Providing inter-connection wiring with socketing, earthing attachment etc. and dismentaling the same after completion of work (with PWD / E.I.C. approved materials)
-
-
-
415V, Upto 6 Way TPNBDB With 1 No. - 63 amp FPMCB as Incoming & 18 No. 6-32 amp SPMCB as Outgoing
(For upto 3 days)
14
-
-
415V, Upto 6 Way TPNBDB With 1 No. - 63 amp FPMCB as Incoming & 18 No. 6-32 amp SPMCB as Outgoing (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 14 Nos x 5 No of Days=70 Nos)
70
-
-
240V, 2+12 Way SPNBDB With 6 - 32 amp SPMCB as Outgoing & 40/63 amp DPMCB as Incoming.
(For upto 3 days)
16
-
-
240V, 2+12 Way SPNBDB With 6 - 32 amp SPMCB as Outgoing & 40/63 amp DPMCB as Incoming. (Next 93 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 16 Nos x 5 No of Days= 80 Nos)
80
-
-
CABLE LAYING
-
-
-
Providing on hire main wiring with 1.1 KV grade Aluminium Conductor PVC / XLPE armoured cable of following sizes including laying in trench (at least 230 mm below ground) including dismantling the same and mending good the damages.
-
-
-
4 Core 150 Sq. mm PVC / XLPE armorured cable per meter (For upto 3 days)
1500
-
-
4 Core 150 Sq. mm PVC / XLPE armorured cable per meter . (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty=1500 Mtr x 5 No of Days= 7500 Mtr)
7500
-
-
4 Core 120 Sq. mm PVC / XLPE armorured cable per meter (For upto 3 days)
500
-
-
4 Core 120 Sq. mm PVC / XLPE armorured cable per meter . (Next 93 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty=500 Mtr x 5 No of Days= 2500 Mtr)
2500
-
-
4 Core 95 Sq. mm PVC / XLPE armorured cable per meter (For upto 3 days)
500
-
-
4 Core 95 Sq. mm PVC / XLPE armorured cable per meter . (Next 93 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty=500 Mtr x 5 No of Days= 2500 Mtr)
2500
-
-
4 Core 50 Sq. mm PVC / XLPE armorured cable per meter (For upto 3 days)
2500
-
-
4 Core 50 Sq. mm PVC / XLPE armorured cable per meter . (Next 93 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty=2500 Mtr x 5 No of Days=12500 Mtr)
12500
-
-
4 Core 35 Sq. mm PVC / XLPE armorured cable per meter (For upto 3 days)
600
-
-
4 Core 35 Sq. mm PVC / XLPE armorured cable per meter . (Next 93 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty=600 Mtr x 5 No of Days= 3000 Mtr)
3000
-
-
4 Core 25 Sq. mm PVC / XLPE armorured cable per meter (For upto 3 days)
2000
-
-
4 Core 25 Sq. mm PVC / XLPE armorured cable per meter . (Next 93 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty=2000 Mtr x 5 No of Days= 10000 Mtr)
10000
-
-
4 Core 16 Sq. mm PVC / XLPE armorured cable per meter (For upto 3 days)
1400
-
-
4 Core 16 Sq. mm PVC / XLPE armorured cable per meter . (Next 93 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty=1400 Mtr x 5 No of Days= 7000 Mtr)
7000
-
-
2 Core 16 Sq. mm PVC / XLPE armorured cable per meter . (For upto 3 days)
2000
-
-
2 Core 16 Sq. mm PVC / XLPE armorured cable per meter (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 2000 Mtr x 5 No of Days=10000 Mtr)
10000
-
-
Finishing the end of following PVC armoured cable by crimping method incl. supplying & fixing solderless socket (dowels make), tape, anticorrisive paste & jointing materials and making connection
-
-
-
4 Core 150 Sq. mm PVC / XLPE armorured cable
42
-
-
4 Core 120 Sq. mm PVC / XLPE armorured cable
45
-
-
4 Core 95 Sq. mm PVC / XLPE armorured cable
45
-
-
4 Core 50 Sq. mm PVC / XLPE armorured cable
45
-
-
4 Core 35 Sq. mm PVC / XLPE armorured cable
45
-
-
4 Core 25 Sq. mm PVC / XLPE armorured cable
50
-
-
4 Core 16 Sq. mm PVC / XLPE armorured cable
60
-
-
2 Core 16 Sq. mm PVC / XLPE armorured cable
60
-
-
Supplying & Drawing on Hire Basis Single Phase Dist Wiring With 4 x 2.5/ 4/6 Sqmm with Earth Wire 2 x2.5/1x 4 sqmm) Or its equivalent PVC copper wiring in suitable alkhathene pipe on the hire basis incl. dismantling the same per meter
-
-
-
(i) For upto 3 days
10000
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 10000 Mtr x 5 No of Days= 50000 Mtr)
50000
-
-
Supplying & Drawing on Hire Basis Single Phase Dist Wiring With 2 x 2.5/ 4/6 Sqmm with Earth Wire (1x2.5/1 x 4 sqmm) Or its equivalent PVC copper wiring in suitable alkhathene pipe on the hire basis incl. dismantling the same per meter
-
-
-
(i) For upto 3 days
21000
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 21000 Mtr x 5 No of Days=105000 Mtr)
105000
-
-
DISTRIBUTION WIRING WITH GROUP CONTROL
-
-
-
Distribution wiring in 3 x 1.5 Sqmm single core PVC copper wire to light/fan points incl. fixing holder, switch and double board etc. complete on hire basis and dismantling the same after completion of work.
-
-
-
(i) For upto 3 days
2500
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 2500 nos x 5 No of Days=12500 nos)
12500
-
-
SWITCH BOARDS
-
-
-
Supplying & providing on Hire Basis 2 nos. 6A Switch and 2 nos. 6A 3pin socket on suitable size MS/TW Board and dismantling the same after completion of work.
-
-
-
(i) For upto 3 days
1000
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 1000 nos x 5 No of Days= 5000nos)
5000
-
-
Supplying & Providing on hire basis 1 no Separate 20 amp plug and switch with 150 x 100 x 65 mm MS/TW switch Bard on Hire basis and dismantling the same after completion of work.
-
-
-
(i) For upto 3 days
1000
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 1000 nos x 5 No of Days= 5000 nos)
5000
-
-
Supplying & Providing on hire basis 2 no Separate 6 Aswitch and 2 Nos 6 A 3 Pinb Socket and 2 nos 20 A Switch and 2 nos 20A 3 Pin Socket on suitable size MS/TW switch Bard and dismantling the same after completion of work.
-
-
-
(i) For upto 3 days
130
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 130 nos x 5 No of Days= 650 nos)
650
-
-
FITTINGS & FIXTURE
-
-
-
Supplying & providing on hire basis pendent light fittings with 35 watt LED lamp with holder shade etc. complete on hire basis including dismantling the same after completion of work.
-
-
-
(i) For upto 3 days
400
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 400 nos x 5 No of Days= 2000 nos)
2000
-
-
Supplying & providing on hire basis 200 watt LED Flood light fittings complete with bracket necessary climping arrangement to be fixed on existing wooden/ bamboo/Pole or on wall incl. gear box & replacement of fuse lamp and dismantling the same after completion of work .
-
-
-
(i) For upto 3 days
1000
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 1000 nos x 5 No of Days=5000 nos)
5000
-
-
Supplying & providing 18/20/22W single/twin LED fitting complete with tube, commercial type (4 ft) box type single/twin fitting on hire basis and dismantling the same (As per direction of E.I.C.)
-
-
-
(i) For upto 3 days
1150
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days)Qty= 1150 nos x 5 No of Days=5750 nos)
5750
-
-
Supplying & providing 9 - 10 Watt LED Spot light/ Track Light (WW/CDL) fittings mounting on ceiling or wall commercial type on hire basis and dismantling the same (As per direction of E.I.C.)
-
-
-
(i) For upto 3 days
810
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days)Qty= 810 nos x 5 No of Days=13770 nos)
13770
-
-
S & Providing on hire basis LED par light as per direction of EIC, operation with operator guarding & transportation.
-
-
-
(i) For upto 3 days
500
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 500 nos x 5 No of Days=2500 nos)
2500
-
-
Hire & labour charges for supplying ,fitting,fixing and installation of Sharpy light (Long Range - 15 R-300W ) as per direction of Engineer-in-Charge.
-
-
-
(i) For upto 3 days
90
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 90 nos x 5 No of Days=450 nos)
450
-
-
Hire & labour charges for supplying , fittings-fixing and installation of 400 Watt LED Blender (warm white)-4 eyes Light fittings as per direction of Engineer-in-Charge.
-
-
-
(i) For upto 3 days
15
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 15 nos x 5 No of Days=75 nos)
75
-
-
Supplying & providing on hire basis 5 mtr LED Strip light different colour chain with necessary climping arrangement to be fixed on existing wooden/ bambo/tree or on wall incl. driver and dismantling the same after completion of work .
-
-
-
(i) For upto 3 days
1320
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 1320 mtr x 5 No of Days=6600 nos)
6600
-
-
Supply & Errection on hire basis 9 mtrs steel tublar pole average depth of 1.5 mtr below the ground incl. Earthing and dismantling & mending good the damages as directed by E.I.C.
-
-
-
(i) For upto 3 days
135
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 135 mtr x 5 No of Days=675 nos)
675
-
-
Do- erection on hire basis 50mm dia 2.5mtr long G.I. pipe with 8 S.W.G GI earth wire approx length 4mtr. As G.S. and dismantling.
-
-
-
(i) For upto 3 days
60
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 60 mtr x 5 No of Days=300 nos)
300
-
-
FANS
-
-
-
Supplying & providing on hire basis 240V A. C. 600 mm sweep Air Circulator & dimantling the same.
-
-
-
(i)For upto 3 days
75
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 75 nos x 5 No of Days=375nos)
375
-
-
Earthing
-
-
-
Providing & Earthing on hire basis with 50 mm dia GI Pipe 2.5 to 3 mtrs. Long and 6/8 SWG GI wire with galvanized nuts and bolts washer etc. below ground level on hire basis and dismantling the same
-
-
-
(i)For upto 3 days
160
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 160 nos x 5 No of Days=800 nos)
800
-
-
DG
-
-
-
Supplying & providing & connecting with Existing electrical panel ( With appropriate cable supplied by Contractor) on hire basis different kVA Three phase/Single phase DG set of Following Ratings and dismantling the same, excluding fuel charges.
-
-
-
a) 125 KVA Three Phase DG Set
-
-
-
(i)For upto 3 days
4
-
-
(ii) (Next 5 Days after 3 Days. @2% of the rate of first 3 days per days) ( Qty= 4 nos x 5 No of Days=20 nos)
20
-
-
Deployment of Man Power
-
-
-
Deployment of 4 nos. Electrician & 6 nos. Helper per shift per day (i.e. Total 12 nos Electrician & 18 nos Helper per day for 24 Hrs) for carring out all kind of EI maintenance & DG operations etc.
240
-
-
PART- B (Sound System)
-
-
-
Hire & labour charges for supplying , fittings-fixing and installation of Sound system arrangement inside pandel and surrounding areas comprising of necessary amplifier, lound speaker(top), louad speaker (low), strage monitor speaker , audio mixing consoul - 32 channel, cased deck, dual CD Player, graphic equiliser, electronic crossover, effect professor, sufficient no of microphones (high stand, baby stand, chord less) as per requirement from authority, direct input box, speaker management system, digital feedback reducer, digital audio-cd recorder, buzzer, etc. in complete for successful organising the programme, as per direction of Engineer-in-Charge. (It also includes the sound system for parking area). [For eight (08) days]
8
-
-
PART- C (LED wall & Plasma TV)
-
-
-
Supply & providing on hire basis including all labour charges for installation and maintenace for Outdoor type LED Screen having IP 66 rating, P4.8 Outdoor LED, Cabinet Size 576*576MM, Cabinet Resolution 120x120, Brightness 5500, or P3.91 Outdoor LED, Cabinet Size 500*500MM, Cabinet Resolution 128x128, Brightness 5500, with all necessary equipments in accordance with the system.(For8days)
768
-
-
Supply & providing on hire basis LED Plasma TV, 43 inches Screen or higher size with necessary accessories.( Make- Sony,LG,Panasonic or equivalent Android TV) [For eight(08) days x 15 nos TV=120]
120
-
-
PART- D (CCTV and other Installation)
-
-
-
Hire & labour charges for supplying,fitting,fixing and installation of CCTV arrangement (20 Nos) at different places for the work comprising 16 channel stand alone digital video recorder with
500 GB sata hard disk,IT camera,20 m 800 TVLS,IR camera,30 m 600 TVLS,power 13 V,3 amp,BNC/power kacks,22" monitor,Technicians and to make the connection of the camera with the original CCTV panel system. [For 8 days]
1
-
-
Supplying on hire basis of Still Photography (at least 3 photographer) each day during the entire events.Everyday 10 selected photos are to be submitted.At the end albums (3Copies)comprising of total 90 photos and softcopy of all photos (in pendrive,2copies) covering all aspect of the event are to be submitted as per direction of Engineer-in-Charge. [For 8 days]
1
-
-
Supplying on hire basis of videography & aerial cinematography of entire events.(average 8 hours per day)edited OVD to be submitted for payment (20 min. to 30 min.) duration along with raw footing to be submitted within 7 days,includng DVD & Storage 16 ch video input,Multi SATA interfaces,Full CIF//ch,real- time recording,HDMI,Pannel buttons,H_264.Multi-Stream,Multi-Channel synchro playback,CVBS, USB,CVMS Mobile Surveillance,IR remote control & mouse operation with necessary cable laying and 2 TB Hard Disk drive. (with necessary cable laying)as per direction of Engineer-in-Charge. [For 8 days]
8
-
-
Supply on hire basis of Walky Talky (Per day 16 nos) as per direction of Engineer- in-Charge. [For 8 days]
8
-
-
S & Installation on hire basis Tower type/split type AC machine complete with timer contrl, indoor outdoor units, refrigent pipe lines, electrical connections, loading unloading, lifting & transportation charges. (40 Tr. X 8 days)
320
-
-
Supply on hire basis of Deep Freeze including transporation, fittings, fixing, with necessary materials required for the job as per requirement of WBMDFC & direction of Engineer-in-Charge. [For 8 days]
5
-
-
Transportation charge for the materials from Company's godown to Site and return back to godown after use.
1
-
-
Supply & Pouring of HSD for the hired DG set incl handling cost (Actual consumption as per load demand)
1200
-
-
Mobil (as per technical data sheet & maintanance schedule)
35
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%