Public Health Engineering Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Civil And Construction
Eprocure
Opening Date28 Mar 2025
Closing Date22 Apr 2025
Tender Amount₹ 86,49,596
Costs
EMD
₹ 1,72,992Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PHED_831681_14Tender No
NIeT NO-43/ALD/2024-2025Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
20
4745
94900
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m II. Other than SAIL/ TATA/RINL.
II. JSW/JSPL/SHYAM/ SRMB/BMASL/ELECROSTEEL/SSL (For JJM Works)
1.75
91726
160520.5
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 ( (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
130
205
26650
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
(i) With 1:4cement mortar
(c) 10 mm thick plaster
70
126
8820
... More
Near cement punning about 1.5mm thick in wall ,dado, window , sills ,floor, drain etc
30
34
1020
... More
Earth work in filling in compound, tank, low land,ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work. (ii) With carried earth arranged by the contractor within a radius exceeding 3 km. but not exceeding 5 km. including the cost of carried earth.
800
419
335664
... More
"Supplying & laying as per IRC-SP:063-2004 paver unit of any shade of approved quality as per relevant IS code, laid inpattern as directed in pavement, footpath, driveway (paver block only), etc including necessary underlay complete in all respect with all labour and material. [Border concrete if necessary to be paid separately]. Note: Sub-grade CBR should not be less than 5.(b) 50 mm thick interlocking designer concrete paver block M 30 grade for non-traffic zone,buiding premises,garden,parks,domestic drive as per IS: 15658- 2006(over 20-30 mm medium sand bed on 200mm thk bound gnaular /granular base course including cost of sand for sand bed but excluding cost of base course & subgrade preparation.)ii) Coloured Decorative
220
1118
245960
... More
Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S.specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as tofacilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line.ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so.vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill.
(A) Pressure Rating : Class III. (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves. (i) 90 MM (OD)
13000
342
4446000
... More
110 mm (OD)
2000
471
942000
... More
Carrying CI/DI pipes with specials and valves and lowering placing in position and laying carefully inside the trenches in proper alignment and gradient etc. including earth work in excavation of adequate width as per specification having min. clear cover from top of pipe is 1.10mtr. below existing ground level in any kind of soil including mixed with boulder, road sub-grade and its flank,but excluding moorum and laterite and stone etc.without damaging the exisiting telephone/electric cable etc.(in case of damaged if any type of cable line during excecution , necessary damaged charges as applicable by the respective authority will be borne by the agency in his own cost) preparing the bottom surface for continuous bedding of pipe line and laying pipes, fitting, fixing specials and valves with bailing out water if any including carriage of pipes, specials and valves from local deptt. store within 8KM and back filling the trenches with excavated earth in layers to original condition as per specification and direction of EIC. The surplus materials after execution of work are to be return to the deptt. store. N.B: i) Any deviation from required clear cover of 1.10mtr., due to site adverse condition, prior permission is to be obtained from the EIC in exceptional situation and payment will be made on prorate basis over the rate of entire item ii) No payment will be made without hydraulic test of the pipe line either part or full iii) The pipes, specials and valves , rubber gasket will be supplied deptt. free of cost. (i)100 MM DIA
150
72
10800
... More
150 mm dia
175
112
19600
... More
200 mm dia
50
136
6800
... More
Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3, if contractor used water from deptt. source).A) For CI/DI pipe. b) 100 mm dia.
150
3
499.5
... More
b) 150 mm dia.
175
4
735
... More
200 mm dia
50
5
280.5
... More
B) For UPVC/HDPE Pipe. b) 90 mm dia.(OD)
13000
3
46800
... More
110 mm (OD)
2000
3
7560
... More
Cleaning thoroughly the inner surface of pipe line including specials and valves by flushing with water and subsequently disinfection of the same pipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/ltrs. after 24hrs. of such filling including laboratory testing of water samples obtain from the disinfested pipe line and disposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor) (The rate of water @Rs. 10/m3 may be recovered, if the contractor used water from deptt. source)A) For CI/DI pipe. b) 100 mm dia.
150
-
141
... More
b) 150 mm dia.
175
1
269.5
... More
200 mm dia
50
2
119
... More
B) For UPVC/HDPE Pipe. b) 90 mm dia.(OD)
13000
-
11440
... More
110 mm (OD)
2000
1
2160
... More
Construction of different dia Sluice valve /Air valve /Washout chamber in different sizes for village road where light traffic run and for main road where heavy traffic run as deptt.approved drawing with 25cm thick brick work (1:6) over cement concrete (4:2:1) over a single B/F soling over150mm.thick sand filling in foundation including earth work in excavation and disposal of excess earth from work site with RCC (1:1.5:3) cover slab 100mm / 150mm thick slab on top of chamber with 1% reinforcement in RCC cover slab with necessary opening for operation of valve all complete including cost of labour & materials as per Departmental Dwg. [Reinforcement type:- Other manufactuerers not specified]
i) 80 mm to 150 mm dia pipe
6
11835
71010
... More
ii) 200 mm dia pipe
2
14997
29994
... More
Making rubber gasket joint to CI/DI pipes maintaining proper alignment level etc. by mechanical arrangement with or without using mobile cranes where necessary and with help of all other equipments tools and tackles etc. as required providing lubricants of approved quality and direction of EIC. (rubber gasket will be supplied deptt. free of cost) i)100 MM DIA
27
20
540
... More
ii)150 MM DIA
32
38
1216
... More
200 mm dia
9
51
459
... More
Supply at site/local store CIDF and CISS specials as per relevent IS specification with latest amendments including cost of loading carrying uncloding stacking properly and sales tax & all othrs charges. etc. complete.
4500
94
425610
... More
Making flange joint to DI/CI pipes, specials and valves where necessary with supply of required rubber insertion and nut bolts, washers etc. of approved quality and type all complete as per specification and direction of EIC (Nut and bolts shall be of TATA/GKW rate). 100 mm dia
8
182
1456
... More
150 mm dia
10
220
2200
... More
Making barricading of excavation trenches of road width upto 15mtr. to avoid any accident by providing 75mm dia bamboo post placed vertically & horizontally with the help of 6”size iron rail as per direction and satisfaction of EIC. (Applicable where critical situation arise and take up the work as per direction of EIC)
12
118
1416
... More
"Supply at site/local store CI Jeffy coupling joint (flexible) complete with studs, nuts and rubber sealing ring as per relevent IS specification with latest amendments including cost of loading carrying uncloding stacking properly and sales tax & all othrs charges. etc. complete. 100 mm dia"
100
899
89993
... More
150 mm dia
100
1626
162659
... More
Making CI Jeffy joint for all dia. 100 mm dia
15
101
1515
... More
150 mm dia
15
101
1515
... More
Making village road (average 3m width)crossing by horizontal auger boring for accomodation of laying of average 3 (three) nos. 15 mm dia GI pipes for FHTC or as per direction of EIC.
25
188
4700
... More
Submission of complete detailed drawing of distribution system, rising main etc. after execution of work showing position of different types of valves, fittings/specials sluice valve chamber with location, node to node
wise in the sanctioned drawing as completion drawing of the water supply scheme as per direction and satisfaction of EIC. The list of dia wise fitting/specials, different pipes ;of valve used in the rising main should be shown in the completion drawing (not separate) with verified by SAE & AE in-charge of the scheme. The above drawing will be submitted in 5 copies.
15000
-
5700
... More
Add 18% GST
1
1306366
1306366.26
... More
Add 1% Cess
1
85639
85639.57
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%