Public Health Engineering Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date19 Nov 2024
Closing Date2 Dec 2024
Tender Amount₹ 2,14,884
Costs
EMD
₹ 4,298Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHED_770048_7Tender No
WB/PHED/AE/HSD/NIET-22/HSD OF 2024-25Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
125 mm. Dia.
8
819
6552
140 mm. Dia.
6
1202
7212
160 mm. Dia.
3
1345
4035
Opening the cap / plug of washout point and opening sluice valve to clean the pipe, cleaning the cap / plug and sluice valve after completion of the work including earth work in excavation and refilling the same, draining out washed water etc. as per direction of ElC and replacing RCC Top slab cover where necessary including refixing the opened cap/plug in position complete. a) Cap opening.
20
410
8200
Cleaning the chokage of AC/DI/CI / UPVC Pipes in the existing line by split bamboo passing through the new pit on the line and cleaning silt, bats or any obstructed materials in the line and cleaning by washed water. (Work to be executed as per prior approval and direction of EIC)
84
84
7056
Withdrawing of DI/CI pipes / AC pipe after excavation of earth and with the help of chain pully derrick etc. by dismantling of jointing of rubber gasket joint or lead joint or flange joint and stacking the withdrawn pipes and specials at site store /road flank godown etc. all complete as per direction of ElCa) 80 mm dia to 125 mm dia AC/DI/CI/UPVC pipe
470
144
67680
Carrying CI/DI pipes with specials and valves and lowering placing in position and laying carefully inside the trenches in proper alignment and gradient etc. including earth work in excavation of adequate width as per specification having min. clear cover from top of pipe is 1.10mtr. below existing ground level in any kind of soil including mixed with boulder,road sub-grade and its flank,but excluding moorum and laterite and stone etc.without damaging the exisiting telephone/electric cable etc.(in case of damaged if any type of cable line during excec tion , necessary damaged charges as applicable by the respective authority will be borne by the agency in his own cost) preparing the bottom surface for continuous bedding of pipe line and laying pipes, fitting, fixing specials and valves with bailing out water if any including carriage of pipes, specials and valves from local deptt. store within 8KM and back filling the trenches with excavated earth in layers to original condition as per
specification and direction of EIC. The surplus materials after execution
of work are to be return to the deptt. store 80 mm dia
376
67
25192
Supplying of UPVC Coupler 6Kg., class – III conforming to IS : 4985 – 2000 with latest revision and amendments ( This item is applicable for maintenance/ repairing work of pipe line only)90 mm. Dia. ( OD )
32
67
2144
Supplying, laying, fiting, fixing and jointing of UPVC pipes onforming to IS:4985-2000 with latest revision and amendments, if any, with ecessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing elephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as pplicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good uality/approved brand solvent cement (as per IS:14182-1994 cluding cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as equired at site by adopting suitable method so as to facilate the aintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with istribution pipes etc. all complete as per drawing direction and atisfaction of the E.I.C. N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to beproduced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list.iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate ofentire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. 90 mm. Dia.
94
342
32148
Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3, if
contractor used water from deptt. source)90 mm. Dia.
94
3
338.4
Cleaning thoroughly the inner surface of pipe line including specials and valves by flushing with water and subsequently disinfection of the same pipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/ltrs. after 24hrs. of such filling including laboratory testing of water samples obtain from the disinfested pipe line and disposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor) (The rate of water @Rs. 10/m3 may be recovered, if the contractor used water from deptt. source)90 mm. Dia.
94
-
82.72
Add GST@18% Rs.
1
32454
32454.38
Add Cess@1% Rs.
1
2127
2127.56
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%